Attachment 0007 - AED Requirements Data.pdf
PDF 8 KB Posted
- Solicitation number
- W58RGZ-25-B-0019
About this file
This document is a Manufacturing and Overhaul (M&O) Acquisition and Engineering Data (AED) Requirements Data sheet for a hydraulic manifold used in the AH-64 Apache helicopter system. The document provides detailed technical specifications for NSN 4730-01-326-4375, Part Number 266500-1009, which is a non-commercial, non-Critical Safety Item (CSI) component. Key requirements include establishing equivalency for local-built and non-OEM test equipment, documenting and submitting certification processes to the government within 30 days of contract award, and identifying special tooling and test equipment needed for manufacturing.
The document mandates that potential contractors must include a section in their proposals detailing their plan to meet government special tooling and test equipment requirements, with options including physical possession of required tools, confirmed requisitions, subcontracting arrangements, or specific plans to develop equivalent tools. Additionally, the contractor must adhere to detailed DMWR (Depot Maintenance Work Requirements) procedures, including final assembly and testing protocols, and comply with specific IUID (Unique Item Identification) requirements outlined in multiple Manufacturing Engineering Orders (MEOs). The document was last verified on 3 May 2024 and is associated with a Department of the Army Materiel Command Contracting Command Redstone Arsenal solicitation.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
05/03/2024
CH109PRID 266500-1009Part Number
4730-01-326-4375NSN AH-64System
MANIFOLD, HYDRAULICNomenclature
YAdequate DMWR Available?
DMWR-1-4730-390DMWR ID
05/31/2016DMWR Date
0DMWR Chg #
YPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
1. Final Assembly per DMWR, Chapter 7, WP 0060 00.
2. Final Testing per DMWR, Chapter 8, WP 0061 00.
Identify Any Special Processes, Test Procedures, and/or Instructions
NCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over durability for AH-64 Manifold, Hydraulic at the time of this review.
Special Airworthiness Considerations
FCDD-AMR-SS CSI/PQDR Branch has verified the CSI/NST status through the ARISE CIM on 25 October 2023 and the part is Non-CSI and Non-NST. JC
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
YSpecial Post-Contract Award Requirements?
The contractor is responsible to establish equivalency of all local-built and non-OEM test equipment and assemblies and the certification of equivalency to OEM tooling and test equipment specified in the DMWR. The process to establish equivalency and certification of release for production shall be documented, including the parameters/guidelines used to achieve equivalency and certification of release for production. All collected data from the determination and certification of equivalency shall be provided to SRD for review and approval 30 days after contract award.
All known deviations from the DMWR requirements shall be clearly documented and submitted for review and approval by SRD no less than 14 days prior to PVA days after contract award.
Special Post-Contract Award Requirements
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO(s) E2090, E2091, E2092A and E2093.
Other Requirements / Comments (Part II)
FCDD-AMR-SS CSI/PQDR Branch has re-verified the CSI/NST status through the ARISE CIM on 3 May 2024 and the part is still Non-CSI and Non-NST. There are no required changes. JC
Other Requirements / Comments (Part III)
Other Requirements / Comments (Part IV)
Other Requirements / Comments (Part V)
NDoes QE-STD-2 Apply?
N
Additional CSI Requirements
CSI Contains CSI Replacement Parts? NEngineering Testing Required?
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
Approved Date
M&O AED REQUIREMENTS DATA
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
05/03/2024
CH109PRID 266500-1009Part Number
4730-01-326-4375NSN AH-64System
C4598A
E2090
E2091
E2092A
E2093
E2166
E2200A
E2360
E2418A
E2469
E2498
E2499
E2500
E2504
E2506A
E2554C
E2626
E2633
E2731
E3031
T1356E
1. Per DMWR 1-4730-390, WP 0014 00, SPECIAL TOOLS: "Special tools are listed in the Tools and Equipment List (WP 0158 00). Test, Measurement, and Diagnostic Equipment (TMDE) and support equipment are listed in the Inspection and Test Equipment (WP 0014 00)."
2. Per DMWR 1-4730-390, WP 0014 00, SPECIAL TOOLS AND EQUIPMENT: Special tools and equipment used to determine conformance to specifications and requirements in this DMWR, are listed in Table 1.
Equivalent special tools and equipment may be substituted if they meet the minimum requirements found in Table 1.
3. SPECIAL TOOLS are provided in WP 0154 00.
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
Correlation Performance Study Requirements