Attachment 0005 LOT NUMBER INSTRUCTIONS.docx
DOCX document 25 KB Posted
- Attached to
- Notched Foil Strip
- Solicitation number
- W519TC-24-Q-FOIL
About this file
This document is a solicitation for the procurement of MJU-67B Notched Foil Strip, a commercial product, under a 100% Small Business Set-Aside. The solicitation is issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal.
The solicitation requires offerors to submit a quote for First Article Testing (10 each) and Quantity 60,700 of the MJU-67B Notched Foil Strip in accordance with the provided technical drawings. Offers are due by May 30, 2024 at 12:00 pm Central Time and will be evaluated using Low Price Technically Acceptable (LPTA) procedures. Award will be made to the lowest priced, technically acceptable offeror. The contract will be a single award Firm Fixed Price contract, with first article delivery required within two weeks of contract award and production delivery four weeks after first article acceptance. Packaging and marking requirements are specified, including the use of a unique lot numbering system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 0003 - CMTR FAT NOTCHED FOIL STRIP 01242024.pdf | ||
| Attachment 0007 - FAR 52.204-24.docx | DOCX document | |
| Attachment 0006 - Price Sheet.xlsx | XLSX spreadsheet | |
| Attachment 0004 - Technical Data Package Information.pdf | ||
| Attachment 0008 - FAR 52.212-3 Alt 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOT NUMBER INSTRUCTIONS
Delivery/shipment requires a unique identifier, commonly referenced as a “Lot Number”, which shall be listed on the receiving documentation and noted as such.
Example CRA22D001-001 **Required.
**CRA = Crane/Manufacture’s identification.
**22 = Year production/manufacturing started.
**D = Month production/manufacturing started.
001 Inter-fix / 001 Sequence – 1st lot in production run.
/ 002 2nd lot in production run.
002 Inter-fix / 001 if there are significant changes e.g. process(es) or raw material manufacturer.
Reference: Lot number format per MIL-STD-1168.
AMC97D018-013B
a b c d e f
1. Manufacturer’s identification symbol.
1. Two (2) digit numeric code identifying the year of production.
1. A single alpha code signifying the month of production.
1. Lot inter-fix number.
1. Lot sequence number.
1. Ammunition lot suffix (the alpha suffix).
4.1.3 Month of production. Each ammunition lot number commencing with the first lot produced, assembled or modified shall have the month of production inserted after the two (2) digit code identifying the year of production. The month of production is a single alpha code assigned as follows:
| January |
| - A |
| May |
| - E |
| September |
| - J |
| February |
| - B |
| June |
| - F |
| October |
| - K |
| March |
| - c |
| July |
| - G |
| November |
| - L |
| April |
| - D |
| August |
| – H |
| December |
| - M |
5.4 Exceptions to use of certain letters as ammunition lot
suffixes.
b. "I" - no exceptions. Can easily be confused with the number "1".
File details come from the government source that posted it. Updated .