This submittal register outlines the required submissions for a federal contract to construct a MARK VIII Tank Pad and Shelter. The contractor must provide submittals including an accident prevention plan, crane operator qualifications, traffic control plans, as-built drawings, coating product data and samples, manufacturer instructions, warranties, and shop drawings for conduits, wiring, luminaires, and the prefabricated shelter. Submissions will be reviewed by the government and construction is to take place at Rock Island Arsenal in Illinois. The related solicitation requests proposals for this tank pad and shelter project from the Army Contracting Command - Rock Island, with responses due under solicitation number W519TC-23-R-2044.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 3 PAGES
MARK VII TANK SHELTER
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.5 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.9.3LHE Inspection Reports
SD-07 Certificates 1.4.1.3Crane Operators/Riggers
1.5.3.1 GStandard Lift Plan
1.6Activity Hazard Analysis (AHA) 1.9.4Certificate of Compliance
01 45 00.10 20 SD-01 Preconstruction Submittals
1.6 GQC Plan
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.3.1 GTraffic Control Plan
01 78 00 SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3.1 GInterim DD FORM 1354
3.3.2 GChecklist for DD FORM 1354
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
09 90 00 SD-03 Product Data
2.1 GCoatings
2.1Product Data Sheets
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 3 PAGES
09 90 00 2.2 GColor SD-08 Manufacturer’s Instructions
2.1Mixing 1.7.1Manufacturer's Safety Data
Sheets 13 34 19 SD-01 Preconstruction Submittals
1.6.3 GManufacturer's Qualifications
SD-02 Shop Drawings
1.6.1 GDetail Drawings
1.2.4 GErection Plan
SD-03 Product Data
1.6.1 GManufacturer's Catalog Data
SD-04 Samples GManufacturer's Color Charts and
Chips SD-05 Design Data
1.6.1 GManufacturer's Descriptive and
Technical Literature
1.6.1 GManufacturer's Building Design
Analysis
1.6.1 GLateral Force Calculations
SD-07 Certificates
1.6.1 GQualification of Manufacturer
1.6.1 GQualification of Erector
SD-08 Manufacturer’s Instructions
1.7 GShipping, Handling, and Storage
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 3 PAGES
13 34 19 SD-11 Closeout Submittals
3.6.1 GManufacturer's Warranty
3.6.2 GContractor's Warranty for
Installation 26 05 00.00 40 SD-03 Product Data
2.1.1 GConduits and Raceways
2.2.1 GWire and Cable
GSplices and Connectors
2.2.4 GReceptacles
2.1.2 GOutlet Boxes, Pull Boxes and
Junction Boxes 26 56 00 SD-03 Product Data
2.2 GLuminaires
2.3 GLight Sources
2.4 GLED Drivers
1.6.1 GLuminaire Warranty
2.5.2.1 GPhotosensors
2.5.2.2 GLighting Contactor
Brackets SD-05 Design Data
1.4.2 GLuminaire Design Data
GPhotometric Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR