Attachment 0003 - XM919 TDP Option Selection Worksheet.pdf

PDF 883 KB Posted

Attached to
XM919 Individual Assault Munition (IAM) - W15QKN23R0056 - RFP
Solicitation number
W15QKN-23-R-0056
Issued by

About this file

This document is a Technical Data Package (TDP) Option Selection Worksheet for the XM919 Individual Assault Munition (IAM) system. It specifies that the TDP will be at the product level and include 3D CAD native models in either the contractor or government format along with derived 2D drawings, lists, specifications, software documentation, and quality assurance provisions. Applicable standards include ASME Y14.100, Y14.24, Y14.34, Y14.35, Y14.41, and Y14.5. Required TDP elements encompass product engineering design data and associated lists. The worksheet also outlines requirements for the TDP data management products and metadata to be provided. The related solicitation is for the XM919 IAM being procured by the Department of the Army Materiel Command Contracting Command at Picatinny Arsenal.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIL-STD-31000B

TDP OPTION SELECTION WORKSHEET

SYSTEM: DATE PREPARED:

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT

NO.

C. CLIN D. CDRL DATA ITEM NO.

1. TDP LEVEL (CHOOSE ONLY ONE PER WORKSHEET). Note: The level selected must coincide with the requirements of the elements selected in block 5.

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCT LEVEL

B. REMARKS:

2. TYPE AND FORMAT (X all that apply and complete as applicable.)

A. TYPE 2D: 2D DRAWINGS(describe in detail in remarks below or in block 11):

NATIVE 2D CAD (SPECIFY TYPE): ____________________________________________________________

ISO 32000 PDF

HARD COPY

OTHER FORMAT (SPECIFY TYPE): ____________________________________________________________

REMARKS :

B. TYPE 3D: 3D MODEL BASED (describe in detail in remarks below or in block 11):

NATIVE 3D CAD (SPECIFY TYPE): _____________________________________________________________ 3Di VIEWABLE* FORMAT DERIVED FROM 3D NATIVE MODELS (Specify type, i.e. ISO 32000 PDF etc.).

NEUTRAL FORMAT DERIVED FROM 3D NATIVE MODELS (Specify type, i.e. STEP AP203, AP 214 etc.).

2D DRAWINGS DERIVED FROM 3D NATIVE MODELS (Specify type, i.e. ISO 32000 PDF etc.).

OTHER FORMAT (SPECIFY TYPE): _____________________________________________________________

*NOTE: 3Di viewable will be in ISO 32000 pdf format unless otherwise specified.

REMARKS :

3. CAGE CODE AND

DOCUMENT NUMBERS

A. CONTRACTOR CAGE & DOCUMENT NUMBERS

GOVERNMENT CAGE & DOCUMENT NO. (COMPLETE 3B, 3C, AND 3D)

B. USE CAGE CODE: C. USE DOCUMENT NUMBERS: D. TO BE ASSIGNED BY:

4. DRAWING FORMATS AND/OR 3Di PDF FORMAT (X one and complete as applicable)

CONTRACTOR FORMAT GOVERNMENT FORMAT

REMARKS:

5. TDP ELEMENTS REQUIRED (X all that apply )

ELEMENTS REQUIRED TO BE DETERMINED BY CONTRACTOR

OR THE FOLLOWING ARE REQUIRED:

CONCEPTUAL ENGINEERING DESIGN DATA

DEVELOPMENTAL ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

PRODUCT ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

COMMERCIAL ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

SPECIAL INSPECTION EQUIPMENT (SIE) ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

SPECIAL TOOLING ENGINEERING DESIGN DATA AND ASSOCIATED LISTS

SPECIFICATIONS

SOFTWARE DOCUMENTATION

SPECIAL PACKAGING INSTRUCTIONS (SPI) ENGINEERING DESIGN DATA AND ASSOCIATED LISTS QUALITY ASSURANCE PROVISIONS (QAPs)

6. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

B C D E

Company stds permitted? Y/N

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LISTS

ASME Y14.35 REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED DOCUMENTS

ASME Y14.41 DIGITAL PRODUCT DEFINITION

DATA PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCING

OTHER STANDARDS APPLY AS

DESCRIBED:

kenneth.g.wadle Highlight

MIL-STD-31000B

TDP OPTION SELECTION WORKSHEET

A. CONTRACT NO. B. EXHIBIT/ATTACHMENT

NO.

C. CLIN D. CDRL DATA ITEM NO.

7. ASSOCIATED LISTS (X all that apply and complete as applicable.)

A. PARTS LISTS (X ONE)* (1) INTEGRAL (2) SEPARATE (3) CONTRACTOR SELECT

B. DATA LISTS REQUIRED (Specify Levels of ASSY) __________________________________

C. INDEX LISTS REQUIRED (Specify Levels of ASSY) __________________________________

D. WIRING LISTS (1) INTEGRAL (2) SEPARATE (3) CONTRACTOR SELECT

E. APPLICATION LISTS (1) INTEGRAL (2) SEPARATE

(3) PLM

MAINTAINED

(4) CONTRACTOR SELECT

F. OTHER REQUIRED(Specify Levels of ASSY) __________________________________

*NOTE: USE OF SEPARATE PARTS OR WIRING LISTS ARE NOT RECOMMENDED ESPECIALLY WITH TYPE 3D TDPS.

8. TDP DATA MANAGEMENT PRODUCTS

A. TECHNICAL DATA PACKAGE LIST (TDPL)

SOURCE CONTROL APPROVAL REQUEST

DOCUMENT NUMBER ASSIGNMENT REPORT

PROPOSED CRITICAL MANUFACTURING PROCESS DESCRIPTION

ENGINEERING DRAWING TREE

TO LOWEST REPAIRABLE UNIT (LRU) LEVEL

TO LOWEST COMPONENT LEVEL

OTHER (DESCRIBE):_______________________________________

B. REMARKS:

9. TDP METADATA

TDP METADATA REQUIRED (describe requirements):

10. TDP SUPPLEMENTARY DATA

TDP SUPPLEMENTARY DATA REQUIRED (describe requirements):

11. OTHER TAILORING (Attach additional sheets as necessary

12. PROCURING ACTIVITY TITLE, SIGNATURE AND DATE

TITLE: SIGNATURE: DATE:

11.0.1.20130826.2.901444

TextField1: W15QKN-23-R-0056
TextField1: Attachment 003
TextField1: N/A
TextField1: DI-SESS-80776B
TextField1: Contractor Format
TextField1: TDP Shall be provided in Native contractor format.
TextField1: XXXXXXX thru YYYYYYYY
TextField1: 19200
TextField1: Equivalent industry standards acceptable
TextField1: XM919 IAM
TextField1: ISO 32000 PDF
TextField1: 04/10/2023
TextField1: W15QKN-23-R-0056
TextField1: A002
TextField1: N/A
TextField1: DI-SESS-80776B
TextField1:

A TDPL shall be provided in conjunction with TDP delivery in accordance with DID DI-SESS-82238. The TDPL shall list all documents in the TDP.

TextField1: XM919 System Engineer
:
CheckBox1: 1
CheckBox1: 0
DateTimeField1: 07/24/2023
SignatureField1:

File details come from the government source that posted it. Updated .