Attachment 0003 - Maintenance and Overhaul Guidance.pdf
PDF 5 KB Posted
- Solicitation number
- W58RGZ-20-R-0146
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
07/10/2019
M639-01PRID 145H7300-31Part Number
1650-01-548-6686NSN CH-47System
CYLINDER ASSEMBLYNomenclature
YAdequate DMWR Available?
DMWR-1-1650-397DMWR ID
09/06/2011DMWR Date
DMWR Chg #
NPre-Award Survey Recommended?
NCorrelation Performance Study Required ? YPVA Recommended?
Modification procedure, final test procedure is a critical characteristic, plating and NDI process.
Identify Any Special Processes, Test Procedures, and/or Instructions
YCritical Safety Item?
There are no emerging airworthiness issues, no issues related to ECPs affecting the CSI status, and no concerns over reliability/durability for the CH-47 Cylinder Assembly at the time of this review
Special Airworthiness Considerations
AED Notes: FCDD-AMA-M-Sustainment has confirmed the CSI/NST status through the ARISE CIM database on 23 May 2019.
The part is a CSI and NST item. The Subcomponents are CSI and NST.Updated NHA table in CIM. DEM
Other Requirements / Comments
If the item is not a CSI and no adequate DMWR is available, approved sources, if any, are listed by CAGE as follows:
NSpecial Post-Contract Award Requirements?
Special Post-Contract Award Requirements
The Prime or OEM is required to submit a Frozen Plan 30 days after contract award to Engineering Directorate (ED) and Aviation Engineering Directorate (AED). The Frozen Plan will be reviewed and require approval by ED and AED prior to government acceptance of contract deliverable assets.
Other Requirements / Comments (Part II)
The applicable DMWR contains detailed procedures regarding IUID requirements for this component. These procedures can be found in MEO D2524, D2525, D2526, D2527.
Other Requirements / Comments (Part III)
1) End item is CSI and contains CSI; QE-STD 2 is required for frozen planning
2) Incorporation of WP0026 along with MEO E1869A are imperative to capture critical characteristics in the frozen planning.
3) CSI/CC warnings and QA inspection points for CCs shall be clearly labeled and legible in the frozen planning.
Other Requirements / Comments (Part IV)
AED Notes: FCDD-AMA-M-Sustainment has re-confirmed the CSI/NST status through the ARISE CIM database on 20 June 2019. The NHA part is still CSI and NST item. The Subcomponents are still CSI and NST. Engineering testing like Fatigue, Endurance, and interchange are not require for overhaul. There were no required changes.JC
Other Requirements / Comments (Part V)
YDoes QE-STD-2 Apply?
Y
Additional CSI Requirements
CSI Contains CSI Replacement Parts? YEngineering Testing Required?
The Contractor shall flow down the Critical Characteristics and QE-STD-1 to all Suppliers of CSIs.
The solicitation/RFP shall require that all proposals/responses include a special tooling and test equipment section that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
1. Physical possession of the required tools, 2. Confirmed requisitions for the required tools, 3. Confirmed arrangements for subcontracting the processes requiring the special tools, or 4. Specific plans describing their technical approach to develop equivalent tools.
RStatus
YTDPL?
01/13/2007Approved Date
M&O AED REQUIREMENTS DATA
Correlation Performance Study Requirements
Commerciality Determination
Commercial Item? N NBest Commercial Practice Acceptable?
07/10/2019
M639-01PRID 145H7300-31Part Number
1650-01-548-6686NSN CH-47System
D1159D
D1250
D1583A
D1654E
D1669
D1734
D1796
D1869A
D2190
D2210
D2524
D2525
D2526
D2527
D2536
D2636
D2643
Critical Tools and Test and Inspection Equipment Requiring AED Approval for Substitutes
MEOs Required for Competitive Contract?
RStatus
File details come from the government source that posted it. Updated .