Attachment 0002 - Quality Assurance Surveillance Plan (QASP).DOCX

DOCX document 18 KB Posted

Attached to
Cartridge Inspection System
Solicitation number
W15QKN-20-R-0117
Issued by

About this file

This Quality Assurance Surveillance Plan outlines acceptance criteria and compliance standards for a firm fixed price contract to purchase a Small Caliber Ammunition Cartridge Inspection System. The contractor must meet completion requirements for 16 Contract Data Requirements Lists including software documentation, operating manuals, maintenance guides, spare parts lists, training materials and progress reports. Acceptable performance is defined as 100% completeness for deliverables received by the Contracting Officer's Representative by required due dates specified in the Statement of Work. The plan also establishes response timelines and compliance monitoring procedures for corrective action plans and failure reports.

The related federal contract opportunity is a Request for Proposal from the Department of the Army Materiel Command Contracting Command at Picatinny Arsenal to purchase a Small Caliber Ammunition Cartridge Inspection System. The period of performance is one base year and three optional one-year periods. Interested vendors must complete non-disclosure agreements to obtain technical data documents for proposal preparation. Questions must be submitted by specified dates to the identified contracting personnel by email, and proposals are to be submitted electronically to the same individuals by the response date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Surveillance Plan (QASP) for CIS

PERFORMANCE REQUIREMENTS SUMMARY/QUALITY ASSURANCE SURVEILLANCE PLAN

Performance Requirements
Performance

Measure Performance Standard

Acceptable Performance Level

(APL)

Method of Surveillance Compliance (Exceeded, Met or Partially Met)

5.4.1.1 Data Item Descriptions

CDRL A001

Completeness

As received

100% compliance

Received and tracked by COR

SOW: 6.4.1.4,7.1,7.8

Software Documentation

CDRL A002

Software Documentation due prior to test or operation at Contractor location and NLT start of Final Acceptance Prove-out.

COR/COTR Review

SOW: 7.2

Contractors Standard Operating Procedures

CDRL A003

The Contractor shall submit an Operations Manual for operation of the machine, including troubleshooting guidelines, a minimum of thirty (30) days prior to delivery of the machine.

SOW 7.3

Technical Report–Study/Services

CDRL A004

The Contractor shall submit a full maintenance and repair guide for the CIS system NLT start of Final Acceptance Prove-out.

SOW: 7.4

Proposed Spare Parts List

CDRL A005

The Contractor shall provide a Spare Parts List IAW the Proposed Spare Parts List report NLT start of Final Acceptance Prove-out.

SOW: 705

CDRL A006

Completeness

The Contractor is responsible for providing a recommended preventative annual maintenance schedule NLT start of Final Acceptance Prove-out.
100% compliance
Received and tracked by COR

SOW: 7.6

Training Materials (Tailored)

CDRL A007

SOW: 7.7

Technical Report – Study/Services

CDRL A008

The Contractor shall submit Draft Operation and Maintenance Documentation NLT one (1) week prior to Pre-Delivery Prove-out. The Contractor shall submit the Final Operation and Maintenance Documentation NLT at the start of Final Acceptance Prove-out.

SOW: 7.9

Schematic Block Diagrams

CDRL A009

SOW: 7.11

CDRL A010

The Contractor shall deliver layout drawings, specifications, electrical schematics, and manuals for all components and assemblies designed and built for the CIS within seven (7) calendar days after Government approval of the Post-Delivery Prove-Out.

SOW: 9.2

Test/Inspection Report

CRL A011

Within two (2) weeks of CCDC AC approval of the pre-delivery prove-out and acceptance.

SOW: 9.6

Contractors Corrective Action Plan

CDRL A012

Incident Reporting

Contractor's Corrective Action Plan due after test or operation at Contractor location and NLT fourteen (14) days after any failure during Vendor Acceptance Testing and/or Post-Delivery Acceptance.

COR in coordination with the installation & organization operations office

No more than one incident per contractor per period of performance

SOW: 9.6

Failure Summary and Analysis Report

CDRL A013

Incident Reporting

Corrective Action Report due after test or operation at Contractor location. NLT than fourteen (14) days after completion of the corrective actions listed in the Corrective Action Plan (CAP).

COR in coordination with the installation & organization operations office No more than one incident per contractor per period of performance

SOW: 11.3

Project Planning Chart

CDRL A014

Thirty (30) days after contract award detailing the critical tasks and milestones necessary to deliver the CIS within the PoP.

SOW: 11.7

Contractor’s Progress, Status and Management Report

CDRL A015

The Contractor shall deliver a monthly status report not more than five (5) business days after the close of each calendar month. Biweekly reports as needed.

SOW: 16.13

Operations Security (OPSEC) Plan

CDRL A016

Within ninety (90) calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per AR 530-1, Operations Security.

Within 90 days