Attachment_0002_FRS_M7A1_Flat_Rack_Components_IDIQ_SOW.pdf
PDF 158 KB Posted
- Solicitation number
- W519TC-26-Q-A007
About this file
This Scope of Work (SOW) details the requirements for FRS M7A1 Flat Rack Components, a containerized tool shop designed for military field-level maintenance. The Forward Repair System (FRS) M7A1 is an 8' x 8' x 20' mobile maintenance module mounted on a Flat Rack, transportable by Palletized Load System (PLS) or Heavy Expanded Mobility Tactical Truck - Load Handling System (HEMTT-LHS). The contractor must provide a comprehensive kit of specific components, including bail bars, retainers, D-rings, ISO corners, dim locks, rollers, lanyards, and pins, with strict quality control requirements.
The SOW mandates detailed specifications for packaging, marking, warranty, and configuration management. Key quality control measures include providing Certificates of Conformance (COC) and Certified Test Reports (CTR) for specific components, maintaining a sequential kit number list, and ensuring all items are new, unused, and meet or exceed original equipment manufacturer (OEM) warranties. The components must be packaged to protect against damage, with precise labeling and handling instructions. The contractor may submit Engineering Change Proposals (ECPs) or Requests for Variance (RFVs) if materials become obsolete or unavailable, subject to government approval.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FRS M7A1 Flat Rack Components IDIQ Scope of Work (SOW)
26 August 2025
Contractor Requirements
1. General Scope.
a. The Forward Repair System (FRS) M7A1 is an 8’ X 8’ X 20’ containerized tool shop that is a highly mobile maintenance module mounted to a Flat Rack and transported by the Palletized Load System (PLS) or Heavy Expanded Mobility Tactical Truck - Load Handling System (HEMTT-LHS). The industrial grade hand and power tools allow maintenance technicians to accomplish maintenance and repair tasks for Field Level Maintenance. The FRS is designed to operate in a wide variety of climate conditions and can be transported by marine or ground forces.
1. Required Material
a. The contractor shall provide the FRS M7A1 Flat Rack Components parts list, Attachment 0001 – FRS M7A1 Flat Rack Components in accordance with (IAW) the Technical Data Package. One (1) KIT equals all parts and Quantities listed on Attachment 0001 – FRS M7A1 Flat Rack Components.
2. Quality Control
a. The contractor is responsible for establishing a quality system. Full consideration of examinations, inspections, and tests will be given to the Government to ensure the acceptability of the material provided.
b. The Government reserves the right to perform quality control inspections at the vendors’ facility prior to shipments being initiated.
c. All items, packing configurations, and markings supplied under this contract shall be identical.
d. Certificate of Conformance (COC) & Certified Test Reports (CTR) shall be provided for the following material listed on Attachment 0001.
Print Description QA Requirement
1110700052RIA:5B5M3 BAIL BAR COC & CTR
1110700076RIA:5B5M3 RETAINER COC & CTR
1110700077RIA:5B5M3 D-RING COC & CTR
1110700078RIA:5B5M3 ISO CORNER RH COC
1110700079RIA:5B5M3 ISO CORNER LH COC
e. A Certificate of Conformance (COC) & Certified Test Reports (CTR) shall be provided for the following material listed on Attachment 0001.
Print Description QA Requirement
1110700087RIA:5B5M3 DIM LOCK RH COC & CTR
1110700101RIA:5B5M3 DIM LOCK LH COC & CTR
1110700109RIA:5B5M3 ROLLER COC
1110700679RIA:5B5M3 Lanyard COC 1110700680RIA:5B5M3 Lynch Pin COC 1110700681RIA:5B5M3 Ring Pin COC
f. No short shipments will be allowed without prior authorization by the Government.
g. The contractor will maintain a running sequential kit number list, formatted as (kit 001, kit 002 and so on) for the life of the contract. The list will show which kit number was delivered by the following
i. Kit Number
ii. Delivery Order Number
iii. Original Delivery Date
iv. Actual ship date to the Government
v. Any shortages each kit number may contain that received prior authorization from the Government with expected delivery dates.
h. The contractor shall be responsible for the quality of all deliverables identified in the scope of work. The level of performance for acceptance by the Government is 100% accuracy for component number, object description, quantity shipped, and Unit of Measure on each delivery order. All information shall be complete, technically accurate and readable.
3. Material Marking
a. Each line of the kit material will be labeled with the component number, object description, quantity shipped, and Unit of Measure as annotated on Attachment 0001 in Columns A – B – C and D.
4. Packaging
a. Preservation, packaging, packing, unitization and marking furnished by the supplier shall provide protection for a minimum of one year, provide for multiple handling, redistribution and shipment by any mode and meet or exceed the following requirements.
i. Cleanliness. Items shall be free of dirt and other contaminants which would contribute to the deterioration of the item, or which would require cleaning by the customer prior to use. Coatings and preservatives applied to the item for protection are not considered contaminants.
ii. Preservation. Where applicable items susceptible to corrosion or deterioration shall be provided protection by means of preservative coatings, volatile corrosion inhibitors, desiccants, waterproof and or water vaporproof barriers.
iii. Cushioning. Items requiring protection from physical and mechanical damage (e.g. fragile, sensitive, critical material) or which could cause physical damage to other items shall be protected by wrapping, cushioning, pack compartmentalization, or other means to mitigate shock and vibration to prevent damage during handling and shipment.
Items of a delicate nature shall not be subjected to damage from rugged items contained within the kit. Non-critical items of odd shapes or having sharp protrusions will not damage other items or protective barriers.
b. Unit Package.
i. A unit package shall be so designed and constructed that it will contain the contents with no damage to the item(s), and with minimal damage to the unit pack during shipment and storage in the shipping container and will allow subsequent handling. The outermost component of a unit package shall be a container such as a sealed bag, carton or box. Unit packs shall be designed to have minimum size and weight while retaining the protection required and enhancing standardization.
1. Each unit pack will be labeled with the component number, object description, quantity shipped in the unit pack, and Unit of Measure as annotated on Attachment 0001 in Columns A – B – C and D.
ii. Intermediate Package – (as applicable) Intermediate packaging is required whenever one or more of the following conditions exist:
1. The quantity is over one (1) gross of the same part number or national stock number.
2. Use enhances handling and inventorying.
3. The exterior surfaces of the unit pack is a bag of any type, regardless of size.
4. The unit pack is less than 64 cubic inches.
5. The weight of the unit pack is less than five (5) pounds and no dimension is over twelve (12) inches.
6. Intermediate containers shall be limited to a maximum of 100-unit packs, a net load of 40 pounds, or a maximum volume of
1.5 cubic feet, whichever occurs first.
7. Each intermediate pack will be labeled with the component number(s) contained, object descriptions, quantity shipped in the intermediate pack, and Unit of Measure as annotated on Attachment 0001 in Columns A – B – C and D.
c. Shipping Containers.
i. Unit packages and intermediate packages not meeting the requirements for a shipping container shall be packed in shipping containers. All shipping containers shall be the most cost effective and shall be of minimum cube to contain and protect the items. The shipping container (including any necessary blocking, bracing, cushioning, or waterproofing) shall comply with the regulations of the carrier used and shall provide safe delivery to the destination at the lowest cost. The shipping container shall be capable of multiple handlings and storage under favorable conditions (such as enclosed facilities) for a minimum of one year.
d. Unitization.
i. Delivery orders of multiple kits will be palletized unless skids or other forklift handling features are included on the shipping containers.
Pallet loads shall be stable and utilize the commercial expendable pallet.
e. Shipping container Markings
i. The contractor shall mark all shipping containers delivered with the following
1. FRS M7A1 Flat Rack Components
2. Contract Number
3. Delivery Order Number
4. Supplier Name, Address and Cage Code
5. Sequential kit number per section 2.f of the SOW
6. If multiple kits are required on a delivery order, the kits will be labeled as Kit 1 of 20, Kit 2 of 20, and so on.
7. A packing list for each shipping container.
a. Packing lists shall be sealed in water-resistant envelopes and secured to the exterior of the load or shipping container in the most protected location.
f. Hazardous Materials (as applicable):
i. Hazardous Materials is defined as a substance, or waste which has been determined by the Secretary of Transportation to be capable of posing an unreasonable risk to health, safety, and property when transported in commerce and which has been so designated. (This includes all items listed as hazardous in Titles 29, 40 and 49 CFR and other applicable modal regulations effective at the time of shipment.)
ii. When applicable, the packaging and marking for hazardous material shall comply with the requirements for the mode of transport and the applicable performance packaging.
iii. A Product Safety Data Sheet (SDS) is required to be included with every material in a shipping container that contains hazardous material and shall be included with the packing list inside the sealed pouch attached to the outside of the shipping container when applicable.
5. Warranty and Workmanship
a. Warranty. All components shall be new and unused and shall have the same or better warranties as provided by Original Equipment Manufacturers (OEM) warranty.
i. The contractor shall provide Shelf-Life Items (items with expiration or use by dates) with a minimum of 85% of the OEM warranty and shelf life remaining at time of Government acceptance of the completed set.
ii. The contractor must include information on the OEM’s standard commercial warranty terms to include (at a minimum).
1. Type of Warranty and Conditions of Warranty – Examples include Lifetime, 1 year, Limited etc.
2. Warranty Length and Initiation Details
3. Warranty Process – At a minimum the contractor shall describe how a warranty claim is to be submitted to the OEM and timelines for normal resolution of claims.
b. Workmanship. All components shall be constructed of parts and materials that are without defects. The quality of workmanship shall equal or exceed that typically provided in commercial quality products of this type. The items presented for acceptance shall be uniform, neat, and clean; and shall be free from irregularities and anomalies which degrade form, fit, function, performance or appearance.
6. Configuration Management. The contractor may submit Engineering Change Proposals (ECPs) and Requests for Variance (RFVs) for the requirements in the Government provided Technical Data Package (TDP) if material is found to be obsolete or no longer commercially available. Prior to submitting a formal ECP or RFV. The contractor will notify the Government of the challenge with procuring the material as soon as an issue is discovered.
a. Request for Variance. The contractor may submit a request for variance when there is a proposed departure from approved TDP material descriptions/specifications for a limited amount of time or when a material is found to be nonconforming with the material TDP after the product has been acquired.
b. Engineering Change Proposal and Notice of Revision. The contractor may request a permanent change to the requirements specified in the TDP by submitting an ECP. ECPs shall be submitted to include all Notice of Revisions necessary to completely define the requested change. Each ECP shall be accompanied with at least one NOR per affected document.
c. Approval of RFV and ECP
i. The contractor shall not present any material for acceptance incorporating any change to the TDP or other baseline documentation until notified by the Government that the RFV or ECP is approved and incorporated with a contract modification or other written, documented approval from the Government.
File details come from the government source that posted it. Updated .