This solicitation and attached documents outline requirements for maintenance services at Lake Chicot Pumping Plant. The U.S. Army Corps of Engineers seeks mowing, trimming, weed control, and landscape maintenance. Services include mowing 112 acres on a biweekly basis from April through October and monthly during other months. Offerors must visit the site and perform weed control, trash removal, and optional herbicide application and riprap spraying. The performance period is one base year with four option years. Quotes are due by July 29, 2020 and shall be submitted via email. The solicitation is set aside for small businesses and will result in a firm-fixed price contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912EE20Q0060.pdf | ||
| Attachment 0001 - Bid Schedule.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT B
LIST OF AREAS REQUIRING MOWING AND/OR TRIMMING SERVICES
| AREA NAME |
| APPROXIMATE |
ACREAGE
DESCRIPTION
Lake Chicot
Pumping Plant
| 112.0 |
| Areas to be mowed and trimmed include from both shoulders of the access road to a ditch, agricultural field, brush, riprap, inlet channel, and wooded areas. Both sides of road shoulders to the brush going to Connerly Bayou Dam and the vicinity of Connerly Bayou Dam, including a 15-foot-wide path to the west side of the dam, and the Connerly Bayou Closure Dam. Also included is the Mowing and trimming from both shoulders of the levee road to wooded areas and outlet channel. Mowing of a 20-foot wide area down each top bank of the relief well ditch. Mowing and trimming will be done inside and around the storage compound, from shoulders to brush on both sides of road to the Rowdy Bend boat ramp, and a road's width up both sides of the inlet channel south past the weir. Mowing and trimming operations are also required for the Ditch Bayou Closure Dam in accordance with contract provisions. |
LIST OF AREAS REQUIRING OPTIONAL SPRAYING OF RIPRAP AREAS
| AREA NAME |
| APPROXIMATE |
ACREAGE
DESCRIPTION
Lake Chicot
Pumping Plant
| 8.5 |
| Riprap areas to be sprayed include all areas along both the east and west sides of the outlet channel from the plant north to a point 300 feet beyond the buoy line; the relief well ditch from top bank to top bank; all areas along both the east and west sides of the inlet channel from the plant south to the end of the riprap areas, including the area below the culvert on the west bank; all areas adjacent to all sides of the weirs in the channel south of the plant; all areas above and below and on both the east and west sides of the channel at the Connerly Bayou Dam south of the plant, including along both sides of the fence for a width of 3 to 5 feet on each side of the fence; at the Ditch Bayou Dam site along both sides of the fence for a width of 3 to 5 feet on each side and all of the rip-rap on the left bank in the vicinity of the overflow weir; gravel areas of the small parking area adjacent to the east side of plant; and gravel areas and other areas that can't be mowed inside the chain link fenced area where the storage building and trailer are located. |
EXHIBIT C
CONTRACTOR'S CLEANING SREVICE PERFORMANCE SCHEDULE
CONTRACT NO. ______________________________
EFFECTIVE STARTING DATE: __________________ (See Exhibit A)
EFFECTIVE ENDING DATE: ____________________ (See Exhibit A)
| AREA |
| STARTING |
TIME
ENDING
TIME
SUBMITTED BY DATE RECEIVED BY DATE
EXHIBIT D
CONTRACTOR'S MOWING AND TRIMMING SERVICE
PERFORMANCE SCHEDULE
CONTRACT NO. ______________________________
EFFECTIVE PERIOD OF SCHEDULE
FROM: ______________ TO: ________________
| LOCATION |
| BEGIN |
DATE
BEGIN
TIME
FINISH
DATE
FINISH
TIME
SUBMITTED BY DATE RECEIVED BY DATE
PAGE ___ OF ___
EXHIBIT E
CLEANUP AND MOWING SERVICE
INSPECTION REPORT FORM
CONTRACT NO. ______________________________
DATE OF INSPECTION: ________________________ INSPECTOR'S NAME: ________________________
| LOCATION |
| INSPECTION |
BEGIN TIME
INSPECTION
END TIME
FACILITY/SERVICE
INSPECTED
| RESULTS |
| REQUIREMENTS |
MET
REQUIREMENTS
NOT MET
RECEIVED BY: _________________________________ DATE: ______________
(CONTRACTOR/CONTRCTOR AUTH. REP.)
EXHIBIT F
ACCIDENT PREVENTION PROGRAM
ADMINISTRATIVE PLAN
Willingness to correct safety hazards detected by the Corps is commendable but a poor substitute for a positive program that prevents or detects and corrects hazards.
Contractor
Contract Name & No.
Date
Project Superintendent
Shifts/day
Hours/shift
5a Maximum employees/shift
5b
Superintendent's training in Corps' safety requirements
Major Units of Equipment
Who will inspect equipment?
Inspector's qualifications 8a Inspection frequency?
8b
Who is responsible for operators' physicals?
Location of all records
Day and hour weekly safety meeting
Who is responsible for employee training?
Who will orient new employees?
Who is responsible for clean-up?
Where will drinking water be obtained?
Who will investigate accidents?
Who is responsible for providing personal protective equipment?
Name Doctors, Hospitals & Ambulance services with whom arrangements have been made for this contract.
| Doctor |
| Hospital |
| Ambulance |
| 18 |
| 18a |
| 18b |
What form of communication will be used to summon ambulance?
18c
LMV FORM 358-R
EXHIBIT F (CONTINUED)
ACCIDENT PREVENTION PROGRAM
ADMINISTRATIVE PLAN
| Names of first aid attendants having certificates |
| Type of certificate |
and expiration date Names of U.S.C.G. licensed boat operators, type license & expiration date
| 19 |
| 19a |
| 20 |
| 21 Fire Fighting Equipment |
| 22 First Aid Kits |
| 23 Wash Facilities |
| No. |
| Rating |
| Type |
| Location |
| No. |
| Type |
| No. |
| Type |
24 Toilets
| No. |
| Type |
What flammable or combustible liquids or gases will be on job site?
Where and how will flammables and combustibles be stored?
Who will be responsible for inspection and maintenance of fire fighting equipment?
If the Company has a published safety policy, please transmit a copy with the return of your Accident
Prevention Program.
On a separate sheet submit your proposed layout of temporary buildings and facilities (including subcontractors)and traffic patterns including access roads, haul roads, R.R.s, utilities, etc.
The ______________________________________________________________________ will pursue a positive program of training, (Company) inspections and hard control throughout the term of this contract. Mr./Ms. ______________________________________ has the responsibility and authority for enforcing them.
Contractor's signature Date C.O. or C.O.R. signature Date
EXHIBIT G
ACCIDENT PREVENTION PROGRAM
ACTIVITY HAZARD ANALYSIS
| 1. Contract No. |
| 2. Contract Name |
| 3. Corps Command |
| 4. Date |
| 5. Location |
| 6. Estimated Start Date |
| 7. Activity |
| 8. Analyzed By |
| 9. Hazard Analysis Phase and Date |
10. Principal Steps of Operation
| 11. Potential Hazards |
| 12. Precautionary Actions or Controls to be Implemented |
| 13. Contractor/Superintendent or Safety Officer (Signature and Date) |
| 14. Contractor/Project Manager or Representative (Signature and Date) |
LMV FORM 359-R
INSTRUCTIONS FOR COMPLETION OF LMV FORM 359-R
Item
Number Instruction
| 1. |
| Self-explanatory. |
| 2. |
| Self-explanatory. |
| 3. |
| The Area, Resident, Project, or Field office administering the contract. |
| 4. |
| Date Hazard Analysis is prepared. |
| 5. |
| Location of contract or where activity is to be performed. |
| 6. |
| Estimated start date of the activity being analyzed. |
| 7. |
| Activity refers to the specific phase of work being analyzed (i.e., clearing and grubbing, stone placement, form erection, electrical installation, pile driving, etc.). |
| 8. |
| The person making the analysis, typically the foreman in charge of the activity or the Contractor's Quality Control or Safety Officer. |
| 9. |
| If this is the initial Hazard Analysis for this activity, indicate "Initial." If this is an updated analysis for this activity, indicate "Update." Hazard Analysis should be reviewed and updated at preparatory inspection. Show date discussed. |
| 10. |
| The principal steps of operation for the activity should be identified in the sequence in which they occur. All major pieces of equipment used in each step of the operation should be identified. |
| 11. |
| The hazards associated with each step should be identified. |
| 12. |
| Precautionary actions and controls should be specific to the hazard identified. They should be what the contractor actually intends to implement and enforce, not general comments such as "work will be done in accordance with EM 385-1-1." Inspection procedures for equipment identified in item 10 should be stated in this item, as well as training requirements for personnel involved. |
| 13. |
| Analysis should be signed by the Contract Superintendent or Safety Officer. |
| 14. |
| Contractor/Project Manager should sign and date. |
EXHIBIT H
MANDATORY JOB HAZARD ANALYSIS ELEMENTS
| PHASE OF WORK |
| SAFETY HAZARD |
| PRECAUTIONARY ACTION |
| Operation of string trimmers |
| Objects or particles thrown by cutting head |
| Operators are required to wear protective clothing, gloves, and full face shield. |
Operators instructed to stay a safe distance away from other workers and members of the public when operating string trimmer.
Insure that trimmer head deflection shield is properly installed and functional.
Insure that cutting head is properly maintained and securely fastened.
| Hand trimming and sickles, sling blades, and clippers and shears |
| Mashed fingers, cuts to extremities, and falls |
| Operators instructed in proper and safe work habits. |
Equipment routinely inspected for condition and safety.
| Operation of riding and push-type mowers |
| Objects or particles thrown by mower |
Cuts to extremities
Operators instructed in proper and safe operation of equipment.
Operators instructed to stay a safe distance away from other workers and members of the public when performing mowing.
Operators instructed in proper operation of equipment.
Operators required to wear safety footwear (steel-toed boots).
Operators required to always disengage mower deck on riding mower before dismounting.
| Operation of tractors |
| Roll over |
Operators required to be trained in techniques and hazards of operating on inclined surfaces.
EXHIBIT H (CONTINUED)
| PHASE OF WORK |
| SAFETY HAZARD |
| PRECAUTIONARY ACTION |
| Operation of tractors (continued) |
| Roll over (continued) |
Operation or traveling on or near public roads
Objects thrown by mower Operators required to wear seat belts at all times.
Operators required to stay off of wet or too steep slopes where equipment slides or skids.
All tractors required to have Slow Moving Vehicle (SMV) triangle attached to rear.
Operators instructed in hazards associated with roadways and proper operating techniques when on or near roadways.
All tractors will be hauled on trailers between nonadjacent areas.
All wings on bat-wing mowers securely fastened and locked in the vertical position when traveling.
Operators instructed in proper operation of equipment.
Operators instructed to stay away from other workers and members of the public and/or keep these individuals a safe distance away from mowing operations.
Operators required to wear eye protection and protective clothing.
| Motor vehicle operation |
| Untrained and/or unqualified operators |
Operators required to be familiar with the equipment, trained in the operation of the equipment, and possess a valid driver's license.
| PHASE OF WORK |
| SAFETY HAZARD |
| PRECAUTIONARY ACTION |
| Motor vehicle operation (continued) |
| Untrained and/or unqualified operators |
(continued) Unsafe equipment
Unsecure passengers
Stopping in curves, over hill tops, and other hazardous areas
Operators required to be familiar with and practice defensive driving techniques.
All equipment and vehicles are to be routinely inspected for safety features including windshields, windshield wipers, brakes, ties, lights, stop lights, turn signals, horn, and seat belts.
All motor vehicles required to have valid state motor vehicle inspection sticker.
Operators and all passengers are required to wear seat belts while in vehicles.
Transportation of personnel on running boards, fenders, bumpers, and tail gates is prohibited.
Operators of all vehicles are instructed to stop only where sufficient rear sight distance is provided for rear approaching vehicles to safely stop.
Trash collection vehicles subject to sudden stop will bear a large sign on rear warning motorists of such operation.
All operators instructed to pull vehicle off of road in safe location.
Instruct operators to watch for pedestrians, cyclists, bicyclists, and children in public use areas and to drive slowly in these areas.
| PHASE OF WORK |
| SAFETY HAZARD |
| PRECAUTIONARY ACTION |
| Motor vehicle operation (continued) |
| Pedestrians on roadways |
| Instruct operators to watch for pedestrians, cyclists, bicyclists, and children in public use areas and to drive slowly in these areas. |
| All phases of work |
| Falls and cuts to extremities |
Insect and snake bites and stings
Poisonous plants
Hazardous and flammable materials
Employee apathy, absent mindedness, and carelessness
Employees are instructed in hazard identification and safe walking and climbing techniques.
Employees are instructed in hazard identification and proper techniques in dealing with such hazards.
Employees are provided with and instructed in the proper use of first aid equipment and techniques.
Employees are screened for allergies to insect bites or stings, and such employees are not allowed to perform work where such hazards exist.
Employees are instructed in hazard identification and proper techniques in dealing with the hazard.
Employees are offered immunization when they are allergic to poisonous plants or they are not allowed to work where such plants exist.
Employees are instructed in the proper handling of all hazardous or flammable materials in strict accordance with manufacturer's directions.
Safety meeting are conducted by supervisor on a weekly basis with all employees.
| PHASE OF WORK |
| SAFETY HAZARD |
| PRECAUTIONARY ACTION |
| All phases of work (continued) |
| Employee apathy, absent mindedness, and carelessness (continued) |
Lack of qualified supervision
Supervisors are required to take an active interest in employee safety and demonstrate by their actions the need for safety consciousness.
Employees are required to participate in safety meeting by making presentations on specific safety subjects applicable to the job requirements.
Prospective employees are screened for their previous safety performance/ accidence experience, job-related experiences, and physical and mental limitations which could affect safety on the job.
All employees are provided a copy of both the administrative plan and the job hazard analyses before work begins and, if hired during the contract period, then at the time of hiring.
All supervisors are required to be experienced in all phases of work and trained in employee supervision and safety.
| Application of pesticides and herbicides |
| Inhalation or absorption of chemical |
| All applicators will read and follow material safety data sheets. |
Application will be done in accordance with label directions.
All applicators will wear appropriate personal protective equipment.
All applicators will be licensed and certified.
EXHIBIT K
DISTRICT:____________________ DATE:____________
PROJECT:___________________
U.S. ARMY CORPS OF ENGINEERS ADDRESS:___________________
PEST CONTROL PROGRAM CITY:______________________
POST-APPLICATION DOCUMENTATION FORM PHONE:_____________________
CONTRACTOR:_______________________ APPLICATOR:________________
ADDRESS:__________________________ ADDRESS:___________________
CITY:_____________________________ CITY:______________________
PHONE:____________________________ PHONE:_____________________
TARGET PEST:__________________________________________________________
DATE OF TIME OF AIR RELATIVE CLOUD WIND DIRECTION ACREAGE APPLICATION DAY TEMP HUMIDITY COVER AND SPEED TREATED
DESCRIPTION OF TREATED AREA:__________________________________________
PESTICIDE (TRADE NAME):_______________________________________________
FORM APPLIED:_________________________________________________________
ACTIVE INGREDIENTS:___________________________________________________
EPA REGISTRATION:____________________ EPA CLASSIFICATION:_____________
HOW THE PESTICIDE WAS MIXED: APPLICATION RATE:
APPLICATION EQUIPMENT USED:_____________________ AMOUNT APPLIED:
DISPOSAL INFORMATION: DISPOSAL DATE:____________
METHOD:_______________________________________________________________
LOCATION:_____________________________________________________________
ADDITIONAL REMARKS:___________________________________________________
EXHIBIT L
HAZARDOUS MATERIAL SPILL PREVENTION, CONTAINMENT,
AND DISPOSAL PLAN
I. GENERAL DESCRIPTION:
1. Contractor Name:____________________________________________
2. Job Description:____________________________________________
3. Job Location:_______________________________________________
4. Work Date(s):_______________________________________________
5. Chemical(s) to be Used:_____________________________________
II. STORAGE PLAN:
1. Storage Location:___________________________________________
2. Storage Location Description (Check all that apply to your storage area):
____ Cool, dry area insulated against freezing or overheating
____ Well ventilated
____ Well lifted
____ Fireproof
____ Cement floor
____ Door locked and warning signs posted
____ All chemicals in original containers
Additional Features:________________________________________
EXHIBIT L (CONTINUED)
HAZARDOUS MATERIAL SPILL PREVENTION, CONTAINMENT,
AND DISPOSAL PLAN
III. SPILL MONITORING/PREVENTION PLAN:
Check all items that apply.
1. Storage Area:
____ Area has detergent, hand cleaner, and water.
____ Area has absorbent materials such as clay, sawdust, and paper to soak up spills.
____ Area has a shovel, broom, and dustpan.
____ Area has a fire extinguisher rated for ABC fires.
____ Area has chemicals elevated on pallets to monitor for spills.
2. Mixing Area:
____ Protective clothing and equipment is worn.
____ Equipment is checked for proper performance prior to mixing.
____ Outdoor mixing area has a spill containment device on which chemical is mixed – spill kit such as plastic tarp with means to elevate the edges; absorbent materials such as soil, sawdust, clay or rags to soak up chemical; and a leak proof container for disposal.
____ Chemical container is kept below eye level when pouring.
____ Measure carefully and mix only the amount needed.
____ Stand so that wind does not blow chemical toward your body.
____ Close containers after each use.
____ Pesticide containers are properly secured when transporting.
EXHIBIT L (CONTINUED)
HAZARDOUS MATERIAL SPILL PREVENTION, CONTAINMENT,
AND DISPOSAL PLAN
IV. SPILL CLEANUP PLAN:
Check all items that apply.
1. Minor Spill:
____ Keep people away from spilled chemicals.
____ Rope off area and flag it to warn people.
____ Do not leave the area unless someone is there to confine the spill and warn of danger.
____ If the chemical was spilled on anyone, wash it off immediately.
____ Confine the spill. If it starts to spread, dike it up with sand and/or soil.
____ Use absorbent material such as soil, sawdust, or an absorbent clay to soak up the spill.
____ Shovel all contaminated material into a leak-proof container for disposal.
____ Do not hose down the area.
2. Major Spill:
____ Repeat first five steps under minor spill plan.
____ Notify the Resource Manager or his/her representative.
____ If the spill is on a state highway, call the highway patrol or the state highway department.
____ If the spill is on a county road or a city street, call the county sheriff or city police.
____ If water is contaminated, notify the state health officials; the regional, state or Federal water quality or water pollution authorities; and the state fish and game agency.
EXHIBIT L (CONTINUED)
HAZARDOUS MATERIAL SPILL PREVENTION, CONTAINMENT,
AND DISPOSAL PLAN
V. DISPOSAL PLAN:
Check all items that apply
_____ Complete Post Application Form to include disposal information.
1. Excess Pesticides:
____ Use as directed on the label.
____ Take the pesticides to a landfill operating under EPA or state permit for pesticide disposal (most solid waste landfills are not suitable.
____ If you cannot dispose of them right away, safely store the pesticides until you can.
2. Containers:
____ No containers or chemicals will be left at the site.
____ Do not use chemical containers for other use.
____ Triple rinse empty containers of liquid chemicals.
3. Burnable Containers:
____ You may burn small numbers of them if permitted by state and local regulations.
____ You may take them to a landfill operating under EPA or state permit for pesticide disposal.
4. Nonburnable Container (metal, plastic, or glass):
____ Triple rinse empty containers.
____ Large containers in good shape may be accepted by your supplier, a pesticide manufacturer or formulator, or a drum reconditioner.
EXHIBIT L (CONTINUED)
HAZARDOUS MATERIAL SPILL PREVENTION, CONTAINMENT,
AND DISPOSAL PLAN
____ Send or take them to a place that will recycle them as scrap metal or dispose of them for you.
____ All triple rinsed containers may be crushed and buried in a sanitary landfill in accordance with state and local standards.
5. Containers Which Held Organic Mercury, Lead, Cadmimum, Arsenic or Inorganic Pesticides:
____ Triple rinse empty containers.
____ Use rinse water in spray tank of other labeled targets.
____ If the containers are not rinsed, take them to a landfill operating under EPA or state permit for pesticide disposal.
____ Bury the rinsed containers in a sanitary landfill.
EXHIBIT M
CONTRACTOR’S WORK CHECKLIST FOR LAKE CHICOT PUMPING PLANT
Area Name:______________________________________________________
Date Started and Date Finished:_________________________________
Were All Required Areas Mowed and Trimmed:______________________
If Not,Why:_____________________________________________________
Were all Required Landscaped Areas Weeded:______________________
If Not, Why:____________________________________________________
Was Liter and Debris Removed Prior to Mowing:___________________
If Not, Why:____________________________________________________
Was any Herbicide Applied:______________________________________
If So, State the Type and Where It Was Used:____________________
Was Any Drive Removal Performed:________________________________
Was It Completed:_______________________________________________ If Not, Why:____________________________________________________
Were There Any Accidents; Injuries; or Damage to Government, Private or Contractor Property:_________________________________
If So, Provide Details:_________________________________________
Contractor Employees on the Job:________________________________
CONTRACTOR SIGNATURE _____________________
File details come from the government source that posted it. Updated .