Attachment 0002 CDRL_0001_Commercial Manuals - Copyright Release.pdf

PDF 231 KB Posted

Attached to
Welding Equipment - w/ updated price matrix Federal contract opportunity
Solicitation number
W519TC-25-Q-2244
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This DD Form 1423-1 is a Contract Data Requirements List (CDRL) for a Logistics Management Information (LMI) Data Product with specific provisioning requirements. The document outlines detailed submission guidelines for a data product related to the MWMSS system, requiring electronic submission in Microsoft Excel format to the contracting office, design activity (ECBC), and Customer Points of Contact (PdM-SKOT and RIA-JMTC).

Key submission timelines include: first submission due at the Provisioning Guidance Conference, with the government having 60 days to accept/reject and provide comments, and the contractor required to respond within 5 days. Subsequent submissions are due 14 days prior to Production Readiness Conference (PRC) events, with final draft submissions due 30 days after the final PRC. The government will have 20 days to review final submissions, and the contractor must incorporate changes within 10 days. Final delivery is required 90 days prior to contract end, with revisions required throughout the contract's lifecycle.

View the file

Other files for this federal contract opportunity

Other files attached to Welding Equipment - w/ updated price matrix, newest first.
File Type Posted
Attachment 0001 - Price Evaluation Matrix (MWMSS Welding Equipment IDIQ) - updated 7-22-2025.xlsx XLSX spreadsheet
25Q2244 Amendment 0001.pdf PDF
DRAWING.zip ZIP file
11B5000002_RevA.pdf PDF
Attachment 0001 - Price Evaluation Matrix (MWMSS Welding Equipment IDIQ) - updated.xlsx XLSX spreadsheet
W519TC25Q2244.pdf PDF
Attachment 0003 CDRL_0002_ Product Warranty Information.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

H. DATE J. DATE

Page of Pages

0003 N/A LMI Data Product

MWMSS TBD TBD

0003 Logistics Management Information (LMI) Data Product Provisioning Requirements

TBD ACC-RI / RIA-JMTC

N/A

N/A C

As Required

N/A

See Remarks

See Remarks

0 0 0

*Data must be provided in Government compatible software (e.g. Microsoft Office or Portable Document Format (PDF)).

*Submit requested information electronically to the contracting office who then shall forward to the design activity (ECBC) and Customer POCs (PdM-SKOT and RIA-JMTC).

*Block 12: Date of first submission shall be due at the Provisioning Guidance Conference (PGC). The Government has 60 days to accept/reject and provide comments. The Contractor shall respond to the Government within 5 days with a re-submission to address Government comments.

*Block 13: Date of subsequent submission shall be due 14 days prior to any PRC events.

The Government shall provide acceptance/rejection at the PRC events. The Contractor shall encompass the entirety of all Government approved changes 10 days after PRC events.

Final draft submissions shall be due 30 days after the final PRC. The Government has 20 days to accept/reject and provide comments. The Contractor shall have 10 days to incorporate changes. Final delivery shall encompass the entirety of all Government approved changes and shall be due 90 days prior to the end of the contract. Revision will be required through the life of the contract.

*Tailor DI-SES-81758A as follows:

Format: The submission shall be prepared and delivered in an editable Microsoft Excel file format.

Date: 2024.08.14 06:06:50 -05'00'

1 2 Adobe Professional 8.0

File details come from the government source that posted it. Updated .