Attachment 0001 - Statement of Work.pdf

PDF 162 KB Posted

Attached to
DISCOVAIR G2
Solicitation number
FA558725Q0070
Issued by

About this file

This Statement of Work (SOW) details the procurement of the DISCOVAIR system for the 321st Special Tactics Squadron at RAF Mildenhall, aimed at detecting small unmanned aerial systems using acoustic sensors. The system specification requires a Discovair G2 or equivalent with specific technical characteristics, including an embedded processing unit with an Intel 4th Gen Core i7-460u CPU, 16GB RAM, 240GB SSD, Linux 64-bit operating system, and 128 MEMS microphones. Environmental requirements include an operating temperature range of -20°C to 70°C, IP65 ingress protection, and compliance with multiple MIL-STD-810G standards for durability in various conditions.

The SOW outlines comprehensive requirements for contractor performance, including business relations, contract management, and administrative protocols. Shipping instructions provide detailed guidelines for vendors located inside and outside the United Kingdom, with three shipping options for international vendors and specific weight, dimension, and customs requirements. The contract emphasizes operational security, safety protocols, and installation access procedures, with the primary objective of enhancing mission success by providing a passive, reliable threat detection capability for small unmanned aerial systems in contested environments.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

(SOW)

“DISCOVAIR”

at

Royal Air Force (RAF) Mildenhall “Rev. 1, 07 July 2025”

1.0 Introduction

1.1 Mission: The primary mission of the 321st Special Tactics Squadron is to provide a rapidly deployable special operations force to execute the full spectrum of SOF missions, specializing in Global Access, Precision Strike, and Personnel Recovery to protect our Nation and its interests. In this mission, we train and utilize systems to detect small unmanned aerial systems.

1.2 Background: The integration of acoustic sensors for detecting enemy small unmanned aerial systems enhances mission success by providing passive, reliable, and consistent threat detection that are less susceptible to electronic countermeasures, improving situational awareness and force protection in contested environments.

1.3 Scope: The acquisition of DISCOVAIR will provide reliable 360 detection and tracking of enemy small unmanned aerial systems using non-RF based sensing technologies. This capability, which is currently not present in EUCOM, will provide operators a passive detection capability that utilizes acoustic sensors to reliably detect enemy small unmanned aerial systems.

2.0 General Requirements

2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. The Contractor shall seek to ensure mission partner satisfaction and professional and ethical behavior of all contractor personnel.

2.2 Contract Management & Administration

2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.

2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.

2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.

2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays.

Work hours are from 0800 to 1700 local UK time.

3.0 Product Specifications & Installation Requirements

3.1 The contractor must provide a Discovair G2 or Equal to. Or equal compliance is met with the following characteristics:

Processing unit - Embedded in sensor unit CPU: Intel 4th Gen Core i7-460u Dual core (64-bit)

RAM: 16 GB DDR3L

Storage: 240 GB SSD Operating System: Linux 64 bit (Yocto build)

Audio and Video Microphone elements: 128 MEMS microphones Microphone SNR: 65db

System SNR: <85dB Frequency response: 200Hz – 20kHz Camera Resolution: 2592 x 1954 pixels Camera FoV: 106° x 76°

Environmental Operating temperature range: -20°C to 70°C Storage temperature range: -40°C to 85°C Ingress Protection: IP65

MIL-STD-810G

M 500.5, Procedure I and III, Low pressure M 501.5, Procedure I-III, High Temperature M 502.5, Procedure I-III, Low Temperature M 506.5, Procedure I and III, Rain M 507.5, Procedure II, Humidity M 510.5, Procedure I and II, Sand and Dust M 514.7, Cat 4, Vibration Com. Carrier transport M 514.7, Cat 20, Vibration Ground vehicle operat.

M 516.7, Procedure I and V, Shock M 516.6, Procedure IV, Transit Drop Test

4.0 Special Requirements

4.1 Security & Safety

4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.

4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.

4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.

4.3 Shipping Instructions

4.3.1 For vendors located inside the United Kingdom.

4.3.1.1 Shipment shall be FOB Destination.

4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).

4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2 For vendors located outside of the United Kingdom.

4.3.2.1 Option One: United States Postal Service.

4.3.2.1.1 Shipping shall be FOB Destination.

4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.

4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.1.5 Hazardous material is not submitted.

4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.

4.3.2.2 Option Two: Commercial small parcel carrier.

4.3.2.2.1 Shipping shall be FOB Destination.

4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.

4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.

4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2.3 Option Three: Consolidated Shipping Point.

4.3.2.3.1 Shipping shall be FOB Destination.

4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.3.3 Weight of individual shipments must exceed 300lbs.

4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).

4.3.2.3.5 Hazardous material may be shipped via this method.

4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.

4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED

STATES AIR FORCE” in order to ensure shipments clear customs.

4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.

4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)

4.3.3.1 48 LRS/Inbound Customs; 48lrs.lgrddc.inboundcustoms@us.af.mil.

4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil.

4.3.3.3 Commercial phone number; +44 01638 52620.

4.4 Government Furnished Material: N/A

4.5 Applicable Directives: N/A

5.0 Appendix: Related Documents

mailto:48lrs.lgrddc.inboundcustoms@us.af.mil mailto:48lrs.inboundcargo@us.af.mil

File details come from the government source that posted it. Updated .