Attachment 0001 SOW Roller Improved Dogbone Assy 7-16-2026.pdf

PDF 75 KB Posted

Attached to
Rubber Coating
Solicitation number
W519TC26QA171
Issued by

About this file

This is a Statement of Work (SOW) for the application of rubber coating to dogbone assemblies for delivery to RIA-JMTC. The vendor shall apply rubber material to furnished part 12502074IDA:19207 according to ASME YL4 100-2013 and ASME Y14.5M-2009 standards to create finished part 12502073:19207, with all work performed in accordance with print 12502073 and applicable ASTM specifications. The completed parts must be returned to RIA-JMTC in their original containers with protective layering to prevent transit damage and with proper labeling to facilitate receiving. The vendor is allocated 30 days to process and return the parts.

The vendor is responsible for providing a Certificate of Conformance (COC) documenting that all parts meet specification requirements. The COC documentation shall be shipped with the parts in each batch and also provided electronically to JMTC. All quality assurance provisions specified in drawing 12502073 must be followed throughout the manufacturing process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW FOR IMPROVED DOGBONE ASSEMBLY

APPLY RUBBER COATING TO ASME YL4, 100-2013 AND ASME Y 14, 5M-2009,

USING FURNISHED PART 12502074IDA:19207 APPLY RUBBER MATERIAL TO CREATE THE PART

12502073:19207 IAW PRINT 12502073 ACCORDING TO THE ASTM SPEC. VENDOR WILL RETURN THE PARTS TO RIA-JMTC IN THE ORIGINAL CONTAINER WITH PROTECTIVE LAYERING TO ENSURE NO

DAMAGED TO THE PART IN TRANSIT. VENDOR WILL NEED TO RETURN THE PARTS WITH THE

PROPER LABELING FOR PROPER RECEIVING.

THE VENDOR WILL HAVE 30 DAYS TO PROCESS PARTS AND RETURN THE RIA-JMTC. SEE BELOW.

VENDOR WILL BE RESPONSIBLE FOR PROVIDING DOCUMENTATION CERTIFICATE OF

CONFORMANCE (COC) THAT ALL PARTS MEET SPECIFICATION. DOCUMENTATION SHALL BE

SHIPPED TO JMTC WITH THE PARTS IN EACH BATCH AND ELECTRONICALLY.

ALL QUALITY ASSURANCE PROVISIONS PER DRAWING 12502073

File details come from the government source that posted it. Updated .