Attachment 0001 - SOW Gear Locker Request.pdf

PDF 226 KB Posted

Attached to
Ventilated Personal/PPE Gear Locker
Solicitation number
FA558724Q0056v2
Issued by

About this file

This document is a Statement of Work (SOW) for the procurement of 120 ventilated gear lockers for the CV-22 Maintenance Unit at RAF Mildenhall, UK. The primary objective is to acquire and install these lockers to serve as secure storage for personal protective equipment (PPE), segregate clean and soiled uniforms, and provide storage for spare uniforms. The lockers must have ventilation to prevent the accumulation of toxic fumes from soiled uniforms.

The contractor must source and procure the lockers, which must meet specific requirements, including being 24" wide, 72" high, and 24" deep, made of 16-gauge steel minimum, with ventilated doors and various storage features. The contractor is responsible for delivery and installation at RAF Mildenhall, adhering to security and safety requirements for base access. Shipping instructions are provided for vendors located inside and outside the UK. The government will provide the shipping address and point of contact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

(SOW)

Procurement of Lockers for

7th SOAMXS CV-22 Maintenance Unit RAF Mildenhall, UK “Rev. 2, 23 July 2024”

1.0 Introduction

1.1 Objective: The primary objective of this project is to acquire and install lockers within the CV-22 Maintenance Unit facility. These lockers will serve as secure storage solutions for PPE, facilitate the segregation of clean and soiled uniforms, and provide storage space for spare uniforms. Additionally, the inclusion of ventilated lockers will mitigate the accumulation of toxic fumes emanating from soiled uniforms, further enhancing safety measures within the unit.

1.2 Scope: The contractor shall be responsible for sourcing and procuring lockers suitable for the storage requirements outlined by the CV-22 Maintenance Unit outlined in section 3.1. The contractor shall configure the lockers to accommodate the storage needs of PPE, clean and soiled uniforms, and spare uniforms effectively. For selected lockers, the contractor shall ensure the integration of ventilations to prevent the accumulation of toxic fumes from soiled uniforms.

2.0 General Requirements

2.1 Business Relations: The Contractor shall successfully integrate and coordinate all activity needed to execute this requirement. The Contractor shall manage the timeliness, completeness, and quality of problem identification. The Contractor shall promptly identify issues to the Government and take timely corrective action. Contractor shall provide warranty information and seek to ensure mission partner satisfaction with professional and ethical behavior of all contractor personnel.

2.2 Contract Management & Administration

2.2.1 Contract Management: The Contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of resources assigned to the requirement. The Contractor must maintain continuity between the mission partner and the contractor’s corporate offices.

2.2.2 Contract Administration: The Contractor shall establish processes and assign appropriate resources to effectively administer the contract. The Contractor shall respond to the Governments requests for contractual actions in a timely fashion. The Contractor shall have a single point of contact between the Government and contractor personnel assigned to support the contract. The Contractor shall assign resources in order to maintain proper and accurate records related to this contract.

2.3 Subcontract Management: If applicable, the Contractor shall be responsible for any subcontractor and any subcontractor management necessary to integrated work executed under this contract.

2.4 Hours of Work: Work days are from Monday through Friday excluding US federal holidays and UK bank holidays.

Work hours are from 0800 to 1700 local UK time.

3.0 Product Specifications & Installation Requirements

3.1 The contractor must provide 120 individual lockers Brand Name or Equal to Salsbury model # 72024- 24" Standard Metal Gear Lockers or equal compliance is met with the following characteristics at a minimum:

• 24" wide, 72" high and 24" deep

• Constructed of 16 gauge steel at a minimum

• Ventilated doors open from left to right

• Feature a 13 3/4" D upper shelf and a 12" wide, 12 1/2" high, 13 3/4" deep top compartment with a steel padlock hasp

• Feature 2 steel coat hooks and a coat rod

• Feature a 14" high foot-locker with a hinged lid and recessed padlock hasp for secure storage

• The lockers must be able to be secured by a government approved padlock

• A durable powder coated finish in blue, black, or gray

• Contractor MUST be able to provide delivery and install on RAF Mildenhall, UK (see section 4.1, 4.1.2, and

4.2 for base access requirements and information).

4.0 Special Requirements

4.1 Security & Safety

4.1.1 Operational Security (OPSEC): If any installation is required to take place in a Government facility, the Contractor shall be familiar with the organizational critical information and indicators list (CIIL) and OPSEC policy of any installation they require access to. The required CIIL can be provided by the Contracting Officer.

4.1.2 Safety: The Contractor and any of its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government/Contractor personnel that takes place on an installation. The Contractor shall notify the cognizant Contracting Officer within 24 hours of all mishaps or incidents. The Contracting Officer will in-turn notify the Safety Office. The Contractor shall cooperate in any resulting safety investigation.

4.2 Contractor Access to Installations: Access to DoD installations is limited to personnel with a valid installation access pass. Failure to submit required information to obtain required documentation will result in the exclusion of such employees from the installation until such documentation is obtained. Contractor employees may be subject to personal and vehicle searched when entering or leaving a DoD installation. If installation access is required, the Government will provide the Contractor with the required information and documents for installation access passes upon award. Subsequently, the Contractor shall provide a list of all employees along working under this contract, along with the required documentation upon receipt of contract award, and no later than 30 days prior to the projected need for any new installation access pass requirements. The Contractor is responsible for maintaining an adequate number of personnel with active installation access passes, and adhering to the timeframes stated in this section. The cognizant mission partner is responsible for the coordination of installation access passes. Upon termination of employment, termination or cancellation of the contract, or expiration of the contract the Contractor is responsible for collecting employee installation access passes and turning them in to the CO, or the cognizant mission partner in a timely fashion.

4.3 Shipping Instructions

4.3.1 For vendors located inside the United Kingdom.

4.3.1.1 Shipment shall be FOB Destination.

4.3.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either include the shipping in the costs of the items, or outline it in a separate line item).

4.3.1.3 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2 For vendors located outside of the United Kingdom.

4.3.2.1 Option One: United States Postal Service.

4.3.2.1.1 Shipping shall be FOB Destination.

4.3.2.1.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.1.3 Weight of individual shipments must not exceed 70lbs.

4.3.2.1.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.1.5 Hazardous material is not submitted.

4.3.2.1.6 The Government will provide the APO shipping address as part of the solicitation.

4.3.2.2 Option Two: Commercial small parcel carrier.

4.3.2.2.1 Shipping shall be FOB Destination.

4.3.2.2.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.2.3 Weight of individual shipments must not exceed 300lbs.

4.3.2.2.4 Dimensions of individual shipments must not exceed 119 inches in length, and/or 72 inches in width or height.

4.3.2.2.5 The Contractor is responsible for arranging and performing all shipping actions from origin to final destination.

4.3.2.2.6 The Government will provide the shipping address as part of the solicitation document. Additionally, the Government will provide the vendor with the point of contact at the physical destination delivery address.

4.3.2.3 Option Three: Consolidated Shipping Point.

4.3.2.3.1 Shipping shall be FOB Destination.

4.3.2.3.2 All shipping and transit costs must be included as part of the total purchase price submitted to the Government (vendor may either included the shipping in the costs of the items, or outline it in a separate line item).

4.3.2.3.3 Weight of individual shipments must exceed 300lbs.

4.3.2.3.4 Dimensions of individual shipments must exceed 72 inches of any one dimensions (length, width, height).

4.3.2.3.5 Hazardous material may be shipped via this method.

4.3.2.3.6 The Contractor must complete a DD Form 1139 “XXX” to determine if the cargo can be shipped via MILAIR.

4.3.2.3.7 The Contractor shall ensure all cargo is marked “UNITED

STATES AIR FORCE” in order to ensure shipments clear customs.

4.3.2.3.8 48 FW logistics points of contact are provided for in 4.3.3.

4.3.3 Contact Information; 48th Logistical Readiness Squadron (48 LRS)

4.3.3.1 48 LRS/Inbound Customs; 48lrs.lgrddc.inboundcustoms@us.af.mil.

4.3.3.2 48 LRS/Inbound Cargo; 48lrs.inboundcargo@us.af.mil.

4.3.3.3 Commercial phone number; +44 01638 52620.

4.4 Government Furnished Material: N/A

4.5 Applicable Directives: N/A

5.0 Appendix: Related Documents

mailto:48lrs.lgrddc.inboundcustoms@us.af.mil mailto:48lrs.inboundcargo@us.af.mil

File details come from the government source that posted it. Updated .