Attachment 0001 SOW for M119 Gun Drill.pdf

PDF 44 KB Posted

Attached to
M119 Buffer Rod Gun Drill Federal contract opportunity
Solicitation number
W519TC24Q2325
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

The provided document is a Statement of Work (SOW) for the fabrication of buffer rods, part number 12593214, to be provided under a federal contract opportunity. The SOW requires the vendor to drill a 0.4375 inch hole in the buffer rod in accordance with the provided drawing, with no deviations allowed. The vendor will have up to 90 days to prove-out the process and must return the parts to the Rock Island Arsenal - Joint Manufacturing and Technology Center (RIA-JMTC) in appropriate protective packaging. Each delivery order shipment must pass 100% receiving inspection, and the vendor is responsible for providing documentation that all parts meet the drawing specifications.

The related federal contract opportunity is for the procurement of "Rod, Buffer - Gun Drill" under Solicitation Number W519TC24Q2325, issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to M119 Buffer Rod Gun Drill, newest first.
File Type Posted
Amendment 0001.pdf PDF
Amendment 0001.pdf PDF
24Q2325.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW for Buffer Rod – 12593214 Rev J

12593214 - Drill 0.4375 inch hole in the buffer rod, part number 12593214, in accordance with the RIA drawing/print 12593214. No deviations are allowed. Parts must meet all dimensions on drawing and will need to pass receiving inspection.

Vendor will return the parts to RIA-JMTC in appropriate container with protective layering to ensure they will not be damaged.

Vendor will be allowed up to 90 days to prove-out process and return to RIA-JMTC. Each delivery order shipment will have to pass 100% receiving inspection of all dimensionals.

Vendor will be responsible for providing documentation that all parts meet drawing specification for each batch of parts, Inspection reports will suffice. Documentation shall be shipped to JMTC with the parts in each batch.

File details come from the government source that posted it. Updated .