Attachment 0001-SmartScopes Specification 23-23-5220.pdf

PDF 150 KB Posted

Attached to
OGP Smartscopes per Spec # 23-23-5220 for the Watervliet Arenal
Solicitation number
W911PT24Q0030
Issued by

About this file

This document is a Specification for three OGP SmartScope SP 663 optical measurement systems required by the Watervliet Arsenal Manufacturing Engineering Work Group. The Specification details the base system requirements, including a moving bridge design, large measuring volume, granite base and bridge, and required software and accessories. It also outlines the installation, training, and warranty requirements.

The related federal contract opportunity is a brand name solicitation for the procurement of three OGP SmartScope SP 663 systems per the provided Specification. The solicitation is being issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal. No additional details about the procurement timeline, set-asides, or pricing terms are provided in the given materials.

View the file

Other files

File Type Posted
W911PT24Q0030-0001.pdf PDF
W911PT24Q0030 SAM.pdf PDF
23-23-5220 SmartScopes JA - SAM posting_Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Three SmartScopes Specification # 23-23-5220

1. Abbreviated Description: The statement of work defines the requirements for three Optical Gaging Products (OGP) SmartScope SP 663, including installation and training.

2. Base System Requirements: The base system for this requirement shall be three (3) SmartScope 663 measurement systems. The system shall be designed with a rigid base structure and designed to optimize dynamic data acquisition according to ISO 10360 standards. The system shall be a moving bridge system designed for large/heavy parts. The part shall remain stationary while optics and sensors move around the part. The systems shall also include the following:

A. Large measuring volume and high payload capacity in a compact footprint B. Moving bridge design to allow heavy parts to be loaded/unloaded by a conveyor or overhead crane C. Granite base and granite bridge with heavy-duty cast uprights, which shall ensure thermal stability and vibration isolation.

D. XYZ Travel Standard 650 x 660 x 300 mm E. SP25 Scanning Prove Kit (includes SM25-2 Scanning Module Kit with SM25-2, 2x SH25-2) F. SP25 Calibration Kit G. Sonic Controller H. 3-Station Change Rack I. 24” Monitor, Keyboard, and Mouse

3. Software Requirements: The system shall include the ZONE3 Pro, ZONE3 Offline, and ZONE3 SSA software. This software shall have the following requirements:

3.1 Main Software: The system shall include the ZONE3 Pro software (PART NUMBER:

720648) with the following requirements:

A. Display relationship between parts, sensors, datum alignments, and machine accessories B. Full measurement capabilities and tools C. Full GD&T functionality D. Full 3D CAD capability E. Enhanced productivity and analysis tools F. Support for regulated environments G. Includes LaunchPad

3.2. Offline Support: The system shall come with the ZONE3 Offline software (PART

NUMBER: 720650). This software shall mimic the ZONE3 Pro software but designed for use at an offline workstation. This software shall have simulated video, laser, and touch prove for a full functioned multisensory software.

3.3. Software Subscription: The system shall come with a one-year software subscription agreement (SSA) for all applicable ZONE3 software (PART NUMBER: 860052). The SSA shall include free updates of ZONE3 software and will apply for any associated seat of ZONE3 offline software.

4. Optical Requirements: The system shall include a Grid Projector (PART NUMBER: B10- GPR). This shall have the ability to measure surfaces such as glass, clear plastics, and surfaces with a mirror-like finish.

5. Laser Scanning Requirements: The system shall come with a TeleStarPlus TTL Laser (PART NUMBER: B10-TS-TTL). This shall provide high resolution scanning, measurement of deep surfaces, TTL convenience, and the ability to measure all surface textures.

6. Workstation: The system shall come with a Single Monitor Ergotron Stand (PART

NUMBER: B10-CPSTAND-SM).

7. Accessories: The system shall come with a High-Performance i9 PC (PART NUMBER:B10- PCUPGR). This shall replace the standard PC normally supplied with the system. The PC shall provide strong computing power for CAD rich environments. The PC shall be, at minimum, an Intel i9-based PC with 16GB Nvidia Graphics Card, 500GB NVMe Hard Drive, and Windows 10 Pro 64-Bit OS.

8. Installation: The system shall come with RGL installation and Calibration with OVS ISO Guide 17.25 verification. It shall be the responsibility of the contractor to completely deliver, rig, and install the machine. The only assistance WVA will provide is the connection of electrical power to the machine at the point of first connection.

9. Training: A three (3) day class shall be offered, either on-site at the Watervliet Arsenal or off-site at the manufacturer’s facility. The class shall be focused on RGL Zone 3.

10. Warranty: The system shall include a one-year warranty.

File details come from the government source that posted it. Updated .