Attachment 0001 - Scope of Work.pdf

PDF 61 KB Posted

Attached to
Rotary Turret Press Federal contract opportunity
Solicitation number
W519TC-24-Q-23260001
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document is a Scope of Work for the repair or replacement of the upper section of the rotary turret on a PBX-524 Rotary Stokes Press at Pine Bluff Arsenal. Per the Scope of Work, Pine Bluff Arsenal will return the existing press to the contractor for inspection and recommendation on whether to replace only the upper section or the entire turret. The contractor will provide an inspection report with their recommendation and a quotation for the required repairs or replacement. After Pine Bluff Arsenal's concurrence, the contractor will complete the repairs and return the repaired/replaced machine to Pine Bluff Arsenal.

The related federal contract opportunity is a forthcoming sole-source solicitation from the Department of the Army Materiel Command Contracting Command Rock Island Arsenal for the procurement of Rotary Turret Repair or Replacement in support of Pine Bluff Arsenal's M18 Grenade Program. The solicitation number is W519TC-24-Q-23260001.

View the file

Other files for this federal contract opportunity

Other files attached to Rotary Turret Press, newest first.
File Type Posted
W519TC24P2326 0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

Rotary Turret Repair/Replacement-Upper Section

GENERAL STATEMENT OF WORK

The scope of work under this contract is to determine whether the upper of the turret can be replaced, or the entire turret needs to be replaced.

SCOPE OF WORK

Pine Blu Arsenal (PBA) will return existing PBX-524 Rotary Stokes Press to contractor for inspection and repair. The contractor will inspect the entire machine including the turret and recommend if only the upper section needs to be replaced or the entire turret needs to be replaced.

The contractor will provide PBA with an inspection report and will also recommend if other parts need to be replaced. Per the contractor’s recommendation, PBA will provide concurrence to either replace the upper section of the turret or the entire turret in accordance with the contractor’s quotation. After repairs are complete, the contractor will crate and ship complete machine back to

PBA.