This document is a Purchase Description for a modular QA Inspection Building to be located at the Rock Island Arsenal Joint Manufacturing and Technology Center. The building is approximately 20ft x 30ft with an interior height of at least 16ft, and must meet insulation, sound, and safety requirements. The contractor is responsible for the complete installation, including site preparation, utility connections, and training. Key requirements include an aluminum framing system with modular wall panels, a 12ft x 12ft overhead door, LED lighting, HVAC system, electrical wiring, and fire suppression. The contractor must also comply with security and IT access protocols for the Army installation. The building is to be delivered and installed per a specific schedule, and acceptance will be based on successful performance testing and training completion. The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Contracting Command Rock Island Arsenal for the QA Inspection Building.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RIPD E4000-23-9-14 - Rev1 - B230 QA Inspection Bldg..pdf | ||
| 24Q2331 Amendment 0003.pdf | ||
| 24Q2331 Amendment 0002.pdf | ||
| 24Q2331 Amendment 0001.pdf | ||
| 24Q2331.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROCK ISLAND ARSENAL RIPD: E4000-23-9-14
PURCHASE DESCRIPTION DATE: 20-Mar-24
B230 QA INSPECTION BLDG
GREEN HIGHLIGHT = decision must be made or data filled in Blue HIGHLIGHT = For Turnkey Projects Only
1. GENERAL SYSTEM DESCRIPTION
2. STANDARDS AND PUBLICATIONS
2.1 Clarification
2.2 National Standards and Specifications
3. DESIGN
3.1 Ownership
3.2 General Design Standards
3.3 Safety, Security and Environmental
3.4 Responsibilities
4. COMPONENT SPECIFICATION
4.1 Dimensions:
5. INFORMATION TECHNOLOGY SUPPORT…………………………………………… 7
6. APPROVAL/SHIPPING
6.1 Shipping
6.2 Installation
6.3 Completion
7. TRAINING
7.1 Schedule
7.2 Location
7.3 Type
8. SERVICE
8.1 Service/Support Requirements
GREEN HIGHLIGHT = DECISION MUST BE MADE OR DATA FILLED IN.
BLUE HIGHLIGHT = FOR TURNKEY PROJECTS ONLY
1. GENERAL SYSTEM DESCRIPTION
• The purpose of this project is to purchase an inspection building to be located in B230 of
Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC). There will be one unit measuring approximately 20ft x 30ft. The contractor shall be solely responsible for complete installation and removal of shipping material of the office in accordance with this purchase description. No government labor, equipment, or materials will be used to support this project.
2. STANDARDS AND PUBLICATIONS
2.1 Clarification
Any ambiguities, questions, requests for clarification or discrepancies between sections of this purchase description, drawings, national or industry standards discovered by the contractor in reviewing this purchase description shall be reported by the bidder in writing to the contracting officer BEFORE THE DATE SCHEDULED FOR CLOSE OF BIDDING/receipt of proposal.
Submission of a proposal or bid shall be construed as evidence that such examination has been made. Therefore, later claims for labor, material, or equipment required, or for difficulties encountered, which could have been foreseen had such reasonable examination been made, may be denied.
2.2 National Standards and Specifications
The following specifications in effect on the Date of Invitation for Bid/Request for Proposal form a part of this purchase description. In the case of conflicting requirements, the more stringent shall apply. This is not an all-encompassing list. The contractor shall conform to all local and federal codes and standards applicable to the equipment they are providing. It is not the responsibility of the government to make modifications to ensure compliance.
2.2.1 Occupational Safety and Health Act of 1970 (OSHA).
2.2.2 American Society of Testing and Materials (ASTM).
2.2.3 American Society of Mechanical Engineers (ASME).
2.2.4 American National Standards Institute (ANSI).
2.2.5 National Electrical Manufacturers Association Standards (NEMA).
2.2.6 Electronic Industries Association (EIA).
2.2.7 Institute of Electrical and Electronics Engineers (IEEE).
2.2.8 American Code for Information Exchange (ASCII).
2.2.9 American Welding Society (AWS).
2.2.10 National Fire Protection Association (NFPA).
2.2.10.1 NFPA-70 National Electrical Code
2.2.10.2 NFPA-79 Electrical Standard for Industrial Machinery.
2.2.11 International Standards Organization (ISO).
3. DESIGN
3.1 Ownership
3.1.1 This equipment is a standard product of the manufacturer and shall require either no change or minor design changes to meet requirements of these specifications. Therefore, ownership of the design will remain with the manufacturer.
3.2 General Design Standards
3.2.1 ID DATA PLATE: The equipment shall include a main data plate which will include the following data as a minimum requirement (additional information is acceptable):
Manufacturer Name, Manufacturer’s Dunns and Bradstreet Number, Manufacturer’s Model Number, Manufacturer’s Serial Number, Year of Manufacture, Contract Number, Machine Weight. This information is necessary for compliance with the governments Unique Identification Program (UID).
3.2.2 DATA PLATES: All instruction, data, and identification plates and labels attached to this equipment and its controls shall be manufactured of corrosion and oil resistant metal or plastic material. All wording shall be in the English language using plain, bold face lettering.
Lettering shall be permanent and have a contrasting background.
3.2.3 ITEM UNIQUE IDENTIFICATION (IUID) REGISTRATION: The contractor shall register the equipment in the IUID Registry (as one single system). IUID registration requires the contractor to input Cage Code, Model Number, and Serial Number into a Government Database to allow for asset and inventory tracking. IUID Registry of the equipment shall be performed at http://dodprocurementtoolbox.com/site/uidregistry/. Training for IUID is available in https://wawftraining.eb.mil. IUID registration of this equipment is required prior to final payment in the Wide Area Work Flow (WAWF). The contractor shall also affix a machine readable 2-dimensional (2-D) matrix representing the IUID registry to the machine. The IUID 2-D matrix may be included on the ID Data Plate outlined in paragraph 3.2.4.
3.2.4 UTILITY CONNECTION: Equipment supplied to the Rock Island Arsenal will have single point shut-off for each utility supplied to a system. This means that equipment constituting a single system shall be wired to a single main electrical disconnect point, plumbed to a single pneumatic shut-off valve, etc… This will be referred to as the “point of first connection”. Each type of power source may have only one point of first connection. E.g. (1) pneumatic shut-off valve, (1) water supply shut-off valve, (1) electrical disconnect, etc… Each point of first connection shall be clearly labeled on the system and shown in the safety lockout portion of the documentation package. These points must be located on a stationary component and positioned such that they will not create a hazard to personnel during normal operation of the system. The first connection points shall be accessible from the shop floor without the use of ladders, steps, or stools. Access cannot be hampered by operation of the system.
3.2.5 UTILITY CONNECTION LABOR: Rock Island Arsenal shall provide only such labor and materials as will be needed to connect facility utilities to each point of first connection of the system. The supplier will be responsible for all connections beyond the point of first connection for each utility.
http://dodprocurementtoolbox.com/site/uidregistry/ https://wawftraining.eb.mil/
3.2.6 CONDUIT: Flexible conduit is not permitted in exposed areas. All wires, cables, and hoses will be enclosed by rigid, oil-proof protection, except where flexibility is necessary for operation of the equipment. Flexible wires, cables and hoses shall be arranged to prevent draping or tripping hazards.
3.2.7 NEW EQUIPMENT: The equipment furnished under this purchase description shall be new and unused.
3.2.8 COMPONENT ENVIRONMENT: Under no circumstances shall a component be used in an application not recommended by the component manufacturer. Components shall not be subjected to conditions of operation beyond the recommendations of the manufacturer, such as excessive heat, lack of lubrication, over-loading.
3.2.9 REPLACEMENT COMPONENTS: All replaceable components shall be manufactured to definite standards for tolerance, clearance, and finish, enabling components to be field installed without further machining.
3.2.10 FASTENING DEVICES: All screws, pins, bolts, and similar parts shall be installed in such a manner as to prevent change in tightness. Those devices subject to removal or adjustment shall not be swaged, peened, staked, or otherwise permanently deformed. They shall not be installed using permanent bonding adhesives.
3.2.11 FOUNDATION: The requirement for a separate foundation or floor alteration is not permissible. The system shall be capable of being installed on an existing concrete floor without modification to the system or the floor, except for installation of anchor bolts.
3.3 Safety, Security and Environmental
3.3.1 SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safeguards, various precautions, and plant protection measures. All of the below requirements will be necessary of contractors visiting RIA to satisfy requirements of this purchase description; Additional requirements will be placed on contractors requiring access to the Army Network, or Common Access Card (CAC), as specifically detailed below. At all times during the execution of this work, contractor personnel will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the island.
3.3.1.1 Access and General Protection/Security Policy and Procedures: The contractor and any associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Director of Emergency Services. All contractor employees must comply with all personal identity verification requirements (IAW FAR clause 52.204-9) as directed by Department of Defense (DoD), Headquarters Department of the Army (HQDA), and any local policy. If the Force Protection Condition (FPCON) changes, the Government may require changes in contractor installation access, security matters, or security processes.
3.3.1.1.1 Access to RIA: Contractor and all subcontractor employees performing work at RIA shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening
Database (TSDB) and any applicable installation, facility access screening and local security policies and procedures. The JMTC Representative shall provide guidance to complete the Access Control Records Check request Form though the Rock Island Arsenal Directorate of Emergency Services.
3.3.1.1.2 Random Antiterrorist Measures Program (RAMP) participation: Contractor personnel are subject to RAMP security program (i.e. vehicle searches, wearing of ID badges, etc.). Contractor shall comply with any, and all instructions issued by the Rock Island Arsenal Police Department. The RAMP is discussed in the RIA-JMTC Anti- Terrorism Training.
3.3.1.1.3 During FPCONs levels of Charlie or Delta, services may be discontinued/postponed due to a higher National or local security threat. Services will resume when FPCON Level is reduced to Bravo, or lower. FPCON levels are described in Anti-Terrorism Level I Training.
3.3.1.1.4 Contractor personnel shall return all Installation Badges and access passes as soon as possible prior to contract completion. RIA-JMTC electronic keys and access passes are accountable items, shad shall be returned within 24-hours of no longer being needed. Items will be returned to the COR, or paced in a drop box at a RIA-JMTC access point.
3.3.1.2 Security Training: The contractor shall complete the following training:
3.3.1.2.1 Anti-Terrorism, Level I: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Anti-Terrorism (AT) Level I Awareness training. The COR will be provided a copy of the Rock Island Arsenal –Joint Manufacturing and Technology Center (RIA-JMTC) AT Level I Awareness Training and assure that the training is complete.
The contractor shall sign a memorandum of record for each contractor employees and subcontractor employee to the RIA-JMTC Operations Center prior issuing any electronic keys, or access pass being authorized.
3.3.1.2.2 iWatch (See Something, Say Something) Training: The Contractor and all associated subcontractors shall complete iWatch Training. iWatch Training shall be provided during the Anti-Terrorism Training.
3.3.1.3 For Contractors requiring Common Access Card (CAC): Before CAC issuance, the contractor employee requires a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05.
The contractor employee will be issued a CAC only if duties involve one of the following:
(1) Both physical access to a DoD facility and access, via logon, to DoD networks onsite, or remotely or (2) Remote access via logon, to a DoD network using DoD-approved remote access procedures, or (3) Physical access to multiple DoD facilities or multiple Non-DoD Federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6-months, or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management. Contractors needing a NACI or equivalent investigation or higher investigation will coordinate this investigation through their COR.
Contractor personnel shall turn in CAC cards upon completion of their contractual obligations, or at the request by the COR, or at the request of the Contracting Officer.
3.3.2 FEDERAL MARIJUANA LAWS REMAIN UNCHANGED: Note: Rock Island Arsenal is under the exclusive federal jurisdiction of the United States. Under federal law, marijuana is still defined as a Schedule I drug, and possession and use of marijuana is still illegal. Any person using or in possession of marijuana on Rock Island Arsenal may be criminally prosecuted in federal district court. In addition, such individuals may be permanently barred from entering Rock Island Arsenal.
3.3.3 REAL ID: Starting 03-May-2025 all personnel entering Rock Island Arsenal will be required to show a Real ID form of identification.
3.3.4 FIRE PREVENTION AND PROTECTION: The contractor shall comply with all fire prevention measures prescribed in the installation Fire Regulations, a copy of which is on file in the office of the Contracting Officer. A written fire permit shall be obtained from the installation Fire Marshall for use of open flame devices, such as torches, portable furnaces, tar kettles, or gas and electric welding and cutting equipment, in, on, or within 15-ft of the building. The contractor shall be liable for any fire loss to the Government properly attributable to negligence on the part of the contractor, including failure to comp1y with fire prevention measure described by the terms of this purchase description.
3.3.5 INDUSTRY AND REGULATIONS: The equipment shall comply with the most current of all local, state, and federal laws and regulations listed in Standards and Publications.
3.3.6 MATERIAL EXCLUSIONS: The equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.
3.3.7 SAFETY REGULATION COMPLIANCE: The contractor shall comply with standard OSHA and RIA safety standards, including conforming to confined space work requirements when applicable.
3.4 Responsibilities
3.4.1 SITE INSPECTION: Any site inspections and/or measurements, which must be taken in order to determine the suitability of the proposed location or to perform the design of the system, are the sole responsibility of the contractor. This may begin prior to completing the bidding process. Rock Island Arsenal will support this function through the POC (point of contact) by guiding personnel, facilitating security registration, and providing general assistance. The contractor will be responsible for providing any and all equipment necessary for this process.
4. COMPONENT SPECIFICATION
The design and materials shall incorporate the use of components to be assembled on site and provide the ability to disassemble this system at a later date and relocate to a new location. The supplier shall furnish all equipment normally considered by him to be standard for his equipment unless identified in this requirement to be of specific manufacture.
4.1 Dimensions:
4.1.1 SIZE: The equipment described in this section shall be nominally approximately 20-ft x 30-ft. Existing building structure will dictate exact dimensions and will be the responsibility of the contractor. It is understood that the exact interior or exterior dimensions may vary based upon the thickness of the walls provided.
4.1.2 HEIGHT: The equipment provided shall provide for an interior height of at least 16-ft.
There will be a piece of equipment that has an installed height of slightly over 12-ft. There will need to be a hoist installed that has clearance above the machine and therefore the value of 16-ft was determined. The 16-ft requirement does not include any additional height necessary for potential insulated drop ceilings in order to meet the insulation requirements.
4.1.3 R-VALUE: The equipment will provide a thermal insulation value of at least R-11 (includes walls, windows, and ceiling/roof). While the intention is that this equipment will be located inside of manufacturing and warehouse buildings, the interior of the provided building will be air conditioned and the surrounding building will not be air conditioned.
4.1.4 STC RATING: The office will provide a sound transmission class of at least STC-30.
4.2 Wall Framing System
The intent of this office solution is to provide a non-permanent means of separating and conditioning a portion of a pre-existing manufacturing environment. In our experience, this can be done via a modular building solution. Other methods of pre-engineered buildings are acceptable as long as they meet the performance specifications listed within this document. The constraints are that the building solution must be installed on the existing concrete floor via means of anchoring into the concrete or via anchored raceways for panels.
4.2.1 FRAMING: The wall framing system shall be of anodized aluminum construction of 6063-T5 grade
4.2.2 RACEWAY POSTS: Posts shall be positioned 48-in OC. Each post along the wall shall be designed to be interchangeable and to act as a raceway for electrical and communications wiring. Each raceway will include removable snap-in cover plates to allow installation and servicing of the wiring on both sides of the post during and after set-up without disturbing the structural integrity of the wall system. The raceways shall accept standard electrical boxes.
Posts will be designed to allow removal of the adjacent wall panels without disturbing the structural integrity of the wall system. Corner posts will not be required to act as raceway posts.
4.2.3 TRIM: Vinyl trim components shall cover all fasteners.
If providing a different form of pre-engineered building, the wall framing system must be designed to handle the environment in which it is going to be utilized. The system must be designed in such a way that electrical and communication lines can be easily ran throughout the structure. Outlets will be available along the interior walls of the structure at least every 6-8 ft.
4.3 Wall Panels:
4.3.1 CONSTRUCTION: The walls shall be constructed of impact resistant, non-flammable material. The equipment shall include an outer skin as well as an inner skin over the framework of the structure. Internally there will be some method of insulation to achieve the insulation requirements listed in this RIPD.
4.4 Door:
4.4.1 SIZE: The door shall be a standard door size nominally 36-in x 80-in.
4.4.2 LOCATION: The door shall be designed for the southern corner of the west wall of the structure.
4.4.3 TYPE: The door shall be of steel construction with a minimum 24-ga material thickness.
The color shall match the wall skin.
4.4.4 WINDOW: The door will include a built in window. The windows shall be 3/16-in thick minimum tempered safety glass. The frame shall be designed with a removable gasket allowing easy replacement of the glass. The window will be at least 20-in wide x 24-in tall. The bottom edge of the window shall be between 46-in and 48-in from the floor.
4.4.5 HARDWARE: Door will include hinges, all hardware, closure and door sweep, door stops and a transition strip. The contractor is require to use Yale 5407 lever lock w/ Y8 keyway with 26D finish on the door set and provide (3) keys.
4.4.6 OVERHEAD DOOR: The equipment shall include a 12ft x 12ft motor controlled roll up door for access on the west corner of the south facing wall. Frame shall be of steel construction.
The door shall be constructed/ insulated so the door incorporated an R rating of 6.5 or greater in insulation material. The unit shall be installed with weather-strip material to ensure proper seal between the door and the building floor and the rough opening of the structure.
4.5 Lighting
The structure shall incorporate 2 feet x 4 feet Light Emitting Diode (LED) lighting with modular wiring. Lighting intensity shall be a minimum of 75- fc at 2.5 feet from the floor. Contractor shall provide al bulbs for all new fixtures. Light switches shall be located within reach of the man door threshold.
4.6 HVAC
4.6.1 HVAC SYSTEM: The contractor will be responsible for providing an appropriate HVAC system for the building. It shall be comprised of ductless mini split systems or window units. The system shall be capable of maintaining a temperature of 68 degrees F ± 3 degrees F when occupied by (2-3) personnel using standard office equipment.. The contractor is required to make any and all penetrations for HVAC purposes. Additional equipment to be located within the structure could be a Coordinate Measuring Machine and an Optical Comparator
4.7 Electrical
Wiring for power, lighting, and branch circuits shall be copper type. All branch, feeder, and lighting circuits shall be provided with a separate insulated ground wire. Disconnect switches shall be heavy duty type, with quick make, quick break blades.
4.7.1 DISTRIBUTION PANEL: The contractor will conform to all current NEC codes. The contractor shall provide an appropriately sized breaker panel on the exterior of the structure. All breakers will be identified with proper location and typed into the panel directory.
4.7.2 OUTLETS: No more than (5) outlets shall exist on a single circuit. Lighting shall be on a separate circuit as well as the ductless mini split system(s) (If chosen). Outlets shall be located nominally 18-in above the floor.
4.8 Fire Suppression:
4.8.1 Installation of sprinkler heads for this unit will be the contractor’s responsibility to meet the Rock Island Arsenal’s current requirements.
4.8.2 The contractor shall provide and install one new A/V fire alarm in compliance with fire code RIA 420-2. Fire Alarms will be Simplex 4903 Horn/ Visible Units. The contractor shall supply the mounts of the unit. RIA will runs the line connection from the structure to the building network.
4.8.3 The contractor shall provide and install compact emergency lights and an LED exit light with battery backup where necessary inside the structure.
5. INFORMATION TECHNOLOGY SYSTEMS AND SUPPORT
5.1 Installation IT Support:
5.1.1 PERSONNEL: RIA-JMTC will not provide the technician credentials to access the workstation. Access to the workstation will be provided by the RIA-JMTC IT Support Staff escort. Removable Media e.g., CD/DVD/USB/SD/External hard drive will be scanned prior to use. Programs and software must be ran from RIA-JMTC approved/provided media or CD/DVD(s). Contractor Devices will not be allowed to connect to the RIA-JMTC network nor will they be allowed to connect to RIA-JMTC equipment other than to scan and transfer media.
5.2 INSPECTION/FINAL ACCEPTANCE:
5.2.1 LICENSING: The software/ hardware license shall not have an internet connection. A license dongle or license file must be provided for offline use.
5.3 Media/ Devices
5.3.1 REMOVABLE MEDIA: Removable media consists of the following: CD, DVD, USB, SD, and External Hard Drives. Removable media shall be scanned prior to use. Programs and software must be ran from RIA-JMTC approved/ provided media or CD/ DVD(s).
5.3.2 CONTRACTOR DEVICES: Contractor Devices will not be allowed to connect to the RIA-JMTC network and they will not be allowed to connect to RIA-JMTC equipment other than to scan and transfer media.
5.3.3 NON-GOVERNMENT OWNED SYSTEMS OR DEVICES: The contractor shall comply with AR 25-1 and AR 25-2. The contractor shall not install or connect non-
Government-owned computing systems or devices to Government networks without the COR’s coordination and obtaining the proper authorization from the appropriate Information System Security Manager (ISSM), ensuring that all software has a Government Assess Only Authorization. The non-Government-owned computing systems or devices include, but are not limited to, personal or Contractor-owned thumb drives e.g., memory sticks, flash drives, Universal Serial Bus (USB) drives, jump drives, pen drives, removable or external hard drives, Personal Digital Assistants (PDA), PC Cards/Express Cards, MP3 players, cell phones, digital media, floppy disks, compact disc (CD)/digital video disk (DVD) burners, optical recordings, photo flash cards, laptops, or any devices that can store data.
5.3 INFORMATION ASSURANCE AND ACCREDITATION:
5.3.1 Non-Government-Owned computing systems or devices: The Contractor shall comply with AR 25-1 and AR 25-2. The Contractor shall not install or connect non-Government-owned computing systems or devices to Government networks without a government representative coordinating and obtaining proper authorization from the appropriate Information System Security Manager (ISSM), ensuring that all software has a Government Assess Only Authorization. The non-Government-owned computing systems or devices include, but are not limited to, personal or Contractor-owned thumb drives e.g., memory sticks, flash drives, Universal Serial Bus (USB) drives, jump drives, pen drives, removable or external hard drives, Personal Digital Assistants (PDA), PC Cards/Express Cards, MP3 players, cell phones, digital media, floppy disks, compact disc (CD)/digital video disk (DVD) burners, optical recordings, photo flash cards, laptops, or any devices that can store data.COMPONENT SPECIFICATION
5.3.2 System Accreditation and Re-Accreditation: The Contractor shall assist in providing system accreditation documentation such as required artifacts and shall answer technical questions required for registration for accreditation. All documents shall be IAW Chapter 5, and Appendices D and E, AR 25-2, Information Systems Security (dated 3 August 2007) and DOD Instruction 8510.01, Risk Management Framework (RMF) Program or future DOD regulation that supersedes these regulations. The Contractor shall assist in performing yearly reviews of the accreditation, or whenever changes/additions are made to the system. The Contractor will assist in preparing risk assessments, as required.
6. APPROVAL/SHIPPING
6.1 Shipping
6.1.1 RESPONSIBILITY: The contractor is responsible for delivery of the equipment to the Rock Island Arsenal. Adequate preserving of equipment surfaces, packing, marking, and skidding of materials for shipment shall be the responsibility of the contractor. If special lifting devices, such as hooks or eyes, are required for ease of handling, they shall be supplied with the equipment. Any special devices shall be returned to the contractor upon request only if they will not be required for future movement of the equipment, and at the contractor’s expense.
6.1.2 SHIPPING SCHEDULE: Be aware, the Rock Island Arsenal will only off-load equipment arriving between 6:00 am and 12:00 am (noon), local time on Mondays through Thursdays except holidays. For information concerning holidays, the contractor should consult the contracting officer. There is no place to stage transporting vehicles awaiting the arrival of contractors. All equipment shall be delivered at the same time, meaning the same day (multiple trucks are acceptable) unless pre-authorized to deliver on multiple days by the RIA-JMTC contracting officer.
6.1.3 RECEIVER: All shipments to Rock Island Arsenal including installation tools and/or replacement parts, as well as the original shipment of the equipment, shall be marked “ATTN:
Mr. Robert Mcclure or Mr. Dave Holgorsen TARA-LGC”. Items not correctly marked are subject to being returned at the vendor’s expense.
6.1.4 ARRIVAL INSPECTION: Upon receipt of equipment at Rock Island Arsenal, a preliminary inspection shall be performed to determine condition and/or count. This inspection shall be performed by Rock Island Arsenal personnel.
6.2 Installation
6.2.1 SITE PREPARATION REQUIREMENTS: The contractor shall be solely responsible for any necessary site inspections required for determining the specifications of work that must be completed prior to final system installation. The contractor will then provide detailed information of any preparation work that the vendor must perform prior to system installation to Rock Island Arsenal.
6.2.2 SITE PREPARATION EXECUTION: The contractor will be solely responsible for site preparation except as specifically excluded in this document. This includes but is not limited to excavation, foundation work, and surface preparation. This work may be performed through the use of a sub-contractor, but the specification, supervision, and certification of the work remains the responsibility of the primary contractor.
6.2.3 PREPARATION EXECUTION SUPPORT: Rock Island Arsenal will support the preparation portion of the installation by providing utilities to the points of first connection.
6.2.4 LABOR AND MATERIAL: The supplier is solely responsible for providing all labor, materials, hardware, tools, and equipment necessary for complete installation of this system except as specifically listed in this document as being provided by the Rock Island Arsenal.
6.2.5 SUPERVISION: Supervision of the installation process will be the responsibility of the contractor. Rock Island Arsenal shall retain the right to periodic inspection and evaluation of the process, as it deems necessary.
6.2.6 OFF-LOADING/PLACEMENT: Off-loading of the equipment from the delivery vehicle, and placement of the equipment in position for the installation is the responsibility of the contractor. The contractor shall not be allowed to use government equipment to accomplish this work.
6.2.7 OFF-LOADING/PLACEMENT OPTION: At the request of the contractor, Rock Island Arsenal will perform the off-loading and placement of the equipment.
6.2.7.1 Any special requirements or precautions to be observed shall be the responsibility of the contractor to provide.
6.2.7.2 The contractor or his representative may be present during this process; however, such person will be responsible for being present upon arrival of the equipment at Rock Island Arsenal. Off-loading and placement shall not be delayed to allow arrival of the contractor or his representative.
6.2.7.3 If, due to contractor caused difficulties, the equipment or components of the equipment must be moved, removed or replaced by Rock Island Arsenal after initial placement, the contractor shall be billed for such work at current Rock Island Arsenal labor and overhead rates.
6.2.8 LIABILITY: In any case, the equipment remains the property of the contractor, and the contractor shall assume all responsibility and liability for the equipment and the work performed upon it. The government shall be held harmless for any damage done to the equipment at any time up until final acceptance of the equipment by Rock Island Arsenal, except in the case of intentional damage and/or gross negligence on the part of Rock Island Arsenal personnel.
6.2.9 SET-UP: The contractor shall be responsible for set-up and connection of the equipment beyond connections of the utilities to the points of first connection.
6.2.10 SECURITY: The RIA-JMTC is an Army installation subject to Department of Defense safe guards, various precautions, and plant protection measures. At all times during the execution of this SOW, the contractor will maintain adequate plant protection devises to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal. Rock Island Arsenal Island-wide Force Protection levels may be adjusted/changed at any time, which may cause possible delays and will directly affect procedures for accessing the Island.
6.2.11 Delivery Hours or Service Hours: Service calls, equipment installation, training, and equipment delivery (where the contractor offloads) will only be allowed from 0600 – 1530, Monday through Thursday, except for Government Holidays. Deliveries of items where the contractor has opted for Government “off-loading option”, must be received before 1200 hours.
These hours are subject to change, however, the Government will notify the contractor of such changes. The vendor will contact the designated Performance Certifier/ COR to obtain an electronic key for their representative (i.e. delivery driver) in order to have access to the facility.
Deliveries and service calls outside the normal hours stated above will be coordinated with the Performance Certifier/ COR to address any emergency situations."
6.3 Completion
6.3.1 Final acceptance of the equipment shall occur after the following:
6.3.1.1 Set-up completion by the contractor.
6.3.1.2 Successful completion of performance testing at Rock Island Arsenal.
6.3.1.3 Final inspection approval by the government representative or inspector. This is to verify full compliance with this description to include amendments and modifications to the final contract. The government representative shall perform any and all tests he deems necessary to insure compliance with this description and industry standards to include, but not limited to ease of control, convenience of operation, safe operation, and adequacy of lubrication devices.
6.3.1.4 All required training is complete.
6.3.1.5 Complete documentation packages are delivered.
7. TRAINING
The contractor shall provide instruction in proper operation and maintenance of the equipment without additional cost to the government. Training shall be of sufficient duration that the recipients are able to demonstrate a reasonable level of competence as determined by the equipment installer and/or the inspector. Acceptance may be delayed as a result of inadequate training.
7.1 Schedule
Training shall training shall be coordinated with the Rock Island Arsenal. Daily training shall begin no later than 6:30 a.m. CST and shall continue until at least 2:15 p.m. CST. This is required to get full coverage of the 1st shift of operation at RIA-JMTC. If training does not begin until after the stated time, RIA-JMTC may at its option require additional training at a different time to compensate for the loss of training caused by the late start. This may include more time than what is represented by the delay (e.g. a 1-hr delay may require 2-hrs later to impart the knowledge lost).
7.2 Location
All training shall be performed at the Rock Island Arsenal. It shall be performed using the equipment purchased in this description.
7.3 Type
Each type of training shall be given independently. Rock Island Arsenal shall coordinate with the contractor to provide the proper personnel for each type of training. The following types of training shall be provided by the contractor.
7.3.1 OPERATOR: Training shall be provided by the contractor for (5) operators. This shall include instruction on the safe, efficient operation of the equipment delivered. The trainees supplied by RIA-JMTC shall be familiar with machine operation, but not necessarily with the style or type of controls provided with the equipment. (E.g. for a new CNC lathe, the operator will be familiar with CNC lathe operation, but may have no experience with a Fanuc control system.)
7.3.2 PROGRAMMING: If the equipment includes a programmable controller, programmer training shall be provided, separate from the operator training for (2) personnel. If programming is normally performed by the operator only, then this training may be combined with the operator training.
7.3.3 MAINTENANCE: Mechanical and electrical control and diagnostic maintenance training shall be provided by the contractor. This shall include information on troubleshooting and preventive maintenance procedures. This shall be provided for (2) personnel.
7.3.4 METHODS: Methods Training shall be provided by the contractor. The Methods Division of JMTC traditionally workload parts across various machines within the JMTC factory. The contractor shall provide a general overview of the machine capabilities during this training. This training shall define basic information such as material capable of manufacture with the machine, maximum and/or minimum part size, speeds and feeds, and accuracies of the machine provided. It shall also provide overview of the controls, instructions for basic edit commands, and accessing histories. This training shall be no longer than 4 hours, and provide training for 4 students.
8. SERVICE
8.1 Service/Support Requirements
The contractor shall have as a minimum, a verifiable service/repair capability which meets or exceeds the following requirements:
8.1.1 STAFF: Staffed by qualified, English speaking personnel fully knowledgeable in the service/repair of the equipment offered.
8.1.2 TELEPHONE ACCESS: Telephone access to service/repair personnel shall be available for consultation during Rock Island Arsenal normal working hours. Rock Island Arsenal normal working hours are 8:00 am CST to 3:00 pm CST, Monday through Friday, except legal federal holidays.
8.1.3 ON-SITE RESPONSE: Physical, on-site response shall be possible within 48-hrs of notification that service/repair of the equipment is necessary.
8.1.4 MAINTENANCE PARTS: Parts necessary for periodic replacement such as belts, hoses, filters, and other parts normally considered as spare parts, by the manufacturer, shall be stocked and available for shipment.
8.1.5 PRIOR HISTORY: Said service/repair capability shall have been available to the general public prior to the issue date of this purchase description. Adequate proof of prior availability shall be provided upon request.
| GREEN HIGHLIGHT = decision must be made or data filled in. |
| Blue HIGHLIGHT = For Turnkey Projects Only |
| 1. GENERAL SYSTEM DESCRIPTION |
| 2. STANDARDS AND PUBLICATIONS |
| 2.1 Clarification |
| 2.2 National Standards and Specifications |
| 3. DESIGN |
| 3.1 Ownership |
| 3.2 General Design Standards |
| 3.3 Safety, Security and Environmental |
| 3.4 Responsibilities |
| 4. COMPONENT SPECIFICATION |
| 4.1 Dimensions: |
| 4.2 Wall Framing System |
| 4.3 Wall Panels: |
| 4.4 Door: |
| 4.5 Lighting |
| 4.6 HVAC |
| 4.7 Electrical |
| 4.8 Fire Suppression: |
| 5. INFORMATION TECHNOLOGY SYSTEMS AND SUPPORT |
| 5.1 Installation IT Support: |
| 5.2 INSPECTION/FINAL ACCEPTANCE: |
| 5.3 Media/ Devices |
| 5.3 INFORMATION ASSURANCE AND ACCREDITATION: |
| 6. APPROVAL/SHIPPING |
| 6.1 Shipping |
| 6.2 Installation |
| 6.3 Completion |
| 7. TRAINING |
| 7.1 Schedule |
| 7.2 Location |
| 7.3 Type |
| 8. SERVICE |
| 8.1 Service/Support Requirements |