Attachment 0001 - PWS.pdf
PDF 3 MB Posted
- Solicitation number
- W15QKN-21-Q-0E12
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ W15QKN-21-Q-0E12.pdf | ||
| Attachment 0002 - Wage Determination 2015-5623 Rev. No. 15_21JUL2021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grills:
Disassemble top to expose all dirt and grease build up, degrease, scrub clean and wipe down top and components, catch trays cleaned, reassemble top, clean all stainless steel to polish, entire exterior wiped clean including all sides and top.
Griddle:
Grease trap cleaned out, entire exterior wiped clean including all sides and top.
Deep-Fryers:
Remove all debris from inside, polish, and dry inside, entire exterior wiped clean including all sides and top.
Dish-Pit:
Dishwasher interior cleaned and filters cleaned out, entire exterior wiped clean including all sides and top, all shelving is cleaned and polished top and bottom, sinks cleaned, walls wiped down, and exterior of hoods completely wiped clean and polished to shine.
Classrooms & Offices:
Remove furniture including desks, chairs, and podium to do a carpet cleaning and vacuum floors.
Wipe down desks, windows, and window blinds.
Hallways, Stairways and Entry Doors Sweep and wax hallways and stairway, wipe down stairway guards, clean off doors and glass doors.
Bathrooms:
Wiped down toilets, scrub toilet bowl, wipe down sinks, wax bathroom floors.
1.5 Period of Performance: The period of performance including all options are Base Year, with dates of 1 September 2021 - 30 September 2021; Option Year 1, with dates of 1 September 2022- 30
September 2022. The contractor shall accomplish all tasks during the time period specified.
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which they assures themselves that their work complies with the requirement of the contract. The Contractor will do a walk-around with a responsible officer or appointed personnel who will oversee the job performance to ensure that furniture is returned to its original positions, there are no dirt, dust, and grim left in the kitchen area, griddles, furniture, floors, refrigerator, hallways and stairways, elevator, classroom, offices, dish-pit, deep fryers, griddles, grills, cook-lines and bathrooms that are visible to the eye. The contractor will have 3 business day to rectify the action. After acceptance of the quality control plan the contractor shall receive the contracting officer's acceptance in writing of any proposed change to their Quality Control system.
1.6.2 Quality Assurance: The government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: The contractor is not required to perform services on holidays.
New Year's Day Martin Luther King Jr.' s Birthday
Labor Day Columbus Day
File details come from the government source that posted it. Updated .