Attachment 0001 PWS.pdf
PDF 229 KB Posted
- Attached to
- RFQ: USATA On-site Moving Mahr CiM EQ NG-0060-20
- Solicitation number
- W9124P20Q0018
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9124P20Q0018 RFQ memo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0001
Performance Work Statement
SERVICE AGREEMENT FOR
On-Site CALIBRATION & MOVING OF CiM Machine EQUIPMENT
1.0 GENERAL. The U.S. Army Primary Standards Laboratory (APSL), a component of the U.S. Army TMDE Activity (USATA) located at Redstone Arsenal, Alabama, has a requirement for a service agreement to conduct an on-site calibration & moving CiM Machine equipment out of a current renovated area and return the laboratory equipment back post renovation. Location is at Building 5435, Redstone Arsenal, Alabama.
2.0 CONTRACTOR TASKS.
2.1. The contractor shall furnish all labor, trailers, forklifts, transportation, and any necessary equipment required for movement and calibration of CiM Machine equipment out of the current renovated area and back in that area post renovation. No overtime nor work conducted over the weekend shall be approved unless USATA Technicians deem it necessary.
3.0 GOVERNMENT TASKS.
3.1 The U.S. Army TMDE Activity, Redstone Arsenal, AL (Acceptance DODAAC:
W80RA6) shall be responsible for receiving, inspection and acceptance in DFAS Wide Area Workflow (WAWF).
3.2 The Government shall provide adequate storage space for spare parts, tools and test equipment required by the Contractor in performance of Contractor tasks, as well as adequate working space, to include desks, chairs, heating, lighting, ventilation, electrical current and outlets for tools and test equipment for use by the Contractor’s customer support technicians. These facilities shall be within a reasonable distance of the equipment to be services and shall be provided at no additional cost to the Contractor.
3.3 Subject to applicable security regulations, the Government shall provide the Contractor access to the equipment to perform the installation and training services.
4.0 PLACE OF PERFORMANCE. U.S. Army TMDE Activity, Redstone Arsenal.
5.0 PERIOD OF PERFORMANCE. See Section B of contract.
6.0 GOVERNMENT-FURNISHED EQUIPMENT. None.
7.0 QUALITY REQUIREMENTS. Not Applicable.
Attachment 0001
8.0 CONTRACTOR MANPOWER REPORTING REQUIREMENT – SERVICE
CONTRACTS.
(NOTICE: MANDATORY REQUIREMENT)
8.1 Department of the Army requires reporting of all contractor labor hours associated with services, to include calibration and repair, provided to United States Army organizations; therefore,
8.2 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contractor for the U.S. Army TMDE Activity via secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DOD organization that is receiving or benefiting from the contracted services.
8.3 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30.
While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2019. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website.
http://www.ecmra.mil/
File details come from the government source that posted it. Updated .