Attachment 0001 - PWS 80th TC Portable Latrines.pdf
PDF 225 KB Posted
- Attached to
- Field Latrines Lease - 80th Training Command - Fort Hunter Liggett, CA Federal contract opportunity
- Solicitation number
- W15QKN23Q5127
About this file
This performance work statement outlines requirements for a non-personal services contract to lease portable latrine systems for field training at Fort Hunter Liggett. The contractor shall provide 15 trailer-mounted portable latrine units, each with two stalls and a hand washing station, and service them twice weekly by cleaning, restocking supplies, and replacing broken parts. The period of performance is one base year plus four option years. The contractor must store and maintain the equipment at Building 252 on the installation and move the trailers to designated training sites as needed.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002- Q and A- 09-12-2023.pdf | ||
| Amendment 0001- Questions and Answers- 09-07-2023.pdf | ||
| Attachment 0002- WD- 2015-5633 REV 18- 07-25-2023.pdf | ||
| Attachment 0003- TTC FHL Latrine Map 8 Aug.pdf | ||
| Solitation- 80th Latrines- Fort Hunter- Liggett- CA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(CUI)
PERFORMANCE WORK STATEMENT (PWS)
Date: 08/31/2023
Part 1
General Information
1. GENERAL: This is a non-personal services contract to lease field latrines for Fort Hunter Liggett, The Army School System (TASS) Training Center (TTC). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and supply of field latrines as defined in this Performance Work Statement (PWS). The contractor shall perform to the standards in this contract. NAICS Code: 562991. Period of Performance base, plus 4 option years.
1.2 Background: Provide and maintain field latrines to Soldiers conducting field training during courses run by the Fort Hunter Liggett TTC located at Bldg 284 Infantry Road, Jolon, CA 93928. Historically the TASS TTC has utilized portable latrines for the 100 classes held that service approximately 2000 Soldiers per fiscal year in various remote training locations that do not have permanent latrines or running water.
1.3 Scope: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform maintenance and supply of field latrines as defined in this Performance Work Statement. Contractor shall provide 15 trailed portable latrine systems. Each trailer mounted system will consist of 2 portable latrines and 1 hand washing station (total of 30 portable latrines) and all required supplies to maintain such facilities as water, soap, paper towels, toilet paper, etc. Trailers shall have a Pintle Hitch to be connected to a military tactical vehicle with the appropriate trailer hitches for standalone usage. Contractor shall clean and service portable latrines each Tuesday and Friday for the duration of this contract as described in this PWS. Servicing of equipment will include cleaning and restocking with necessary supplies to support until the next servicing date.
1.4 Reserved.
1.5 General Information
1.5.1 Period of Performance: The period of performance shall be for one (1) Base Year and four (4) 12-month option years. The estimated Period of Performance reads as follows:
Base Year 30 September 2023 through 29 September 2024 Option Year I 30 September 2024 through 29 September 2025 Option Year II 30 September 2025 through 29 September 2026 Option Year III 30 September 2026 through 29 September 2027 Option Year IV 30 September 2027 through 29 September 2028
1.5.2 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which it assures that the work complies with the requirement of the contract. The Contracting Officer’s Representative (COR) will communicate with the contractor and schedule quarterly quality control meetings to discuss actions that need to change or be improved as well as good business practices and lessons learned. After acceptance of the quality control (QC) plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system.
1.52.1 The Contractor shall inform the COR of issues or potential issues that might affect the performance within 24 hours of identifying those issues. Verbal reports shall be followed up by written reports within seven days.
1.5.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g., deliverables, submittals, etc.) deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day, January 1st M. L. King Memorial Day, 3rd Monday in Jan Presidents Day, 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.4 Hours of Operation: The Government facility operating hours occur between the hours of 0800 - 1630 Monday thru Friday except Federal holidays identified in paragraph
1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.1 Contractor Support Hours: The contractor is responsible for conducting business, between the hours of 0800 - 1630 Monday thru Friday except federal holidays. The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5.5 Reserved.
1.5.6 Place of Performance: The work to be performed under this contract will be performed at all training areas located within Fort Hunter Liggett, California to include AV Ranch, Milpitas TTB, Training Area 10, the motor pool of Bldg. 252 and other training areas and cantonment utilized by the TASS Training Center. Contractor will visit each training site that has portable latrines being utilized at that location.
Scheduling and maps of the training area will be provided once the contract is awarded.
1.6 Security Requirements:
1.6.1 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings, and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.6.2 Type of Contract: The government will award a non-personal services contract to lease field latrines for Fort Hunter Liggett, The Army School System (TASS) Training Center (TTC).
1.6.3 Security Requirements: Contractor personnel performing work under this contract must have the ability to pass a screening with the Fort Hunter Liggett Police department and can obtain access to the military installation without escort, at time of the proposal submission, and must maintain the level of security required for the life of the contract.
1.6.4 Physical Security: The contractor shall safeguard all Government equipment, information and property provided for Contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.7 Key Control: Not Applicable
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.
The contracting officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.9 Contracting Officer’s Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially about changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any terms and conditions of the resulting contract.
1.10 Key Personnel: The following personnel are considered key personnel by the government: N/AThe Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
The contract manager or alternate shall be available between 0800 - 1630, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.11 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.12 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). “The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations.
The Contractor shall collect all ID badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes
1.13 Contractor Travel: Not Applicable
1.14 Other Direct Costs: Not Applicable
1.15 Data Rights: Not Applicable
1.16 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.17 Phase In /Phase Out Period: The Contractor shall become familiar with performance requirements to commence full performance of services on the contract start date.
1.18 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g., U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel. Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1- 1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1).
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.
(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen (15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt
(ii) Long trousers
(iii) Steel-toed safety boots; and
(iv) Hard hat
1.19 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
1.20 Required Training: The following provides information on training requirements.
http://www.usace.army.mil/
1.20.1 Anti-Terrorism (AT) Level I Training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer if a COR is not assigned) within 7 days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve (12) months except area of responsibility (AOR) specific AT Level I training which shall be completed as required by local AT policies
If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within 7 days after completion of the training.
1.20.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 days of employment under this contract.
Verification of the training shall be provided to the COR within 30 days after completion of the training. OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every twelve (12) months. Verification of the training shall be provided to the COR within 7 days after completion of the training.
If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within 7 days after completion of the training.
1.20.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 days after the contract is awarded and within 30 days after new employees commence contract performance, with the results reported to the COR within 7 days after the contract is awarded and within 7 days after new employees commence contract performance.
Verification of the training shall be provided to the COR within 7 days after completion of the training. Training slides can be found on the Army OneSource we site:
http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.as px https://jkodirect.jten.mil/ http://www.cdse.edu/catalog/elearning/GS130.html http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx
1.21 Information Assurance (IA) Training
1.21.1 All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the DoD IA Cyber Awareness Training within 30 days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel. Verification of the training shall be provided to the COR within 7 days after completion of the training.
1.21.2 All Contractor employees, including subcontractors, working information technology (IT)/IA functions shall comply with DoD and Army training requirements per Information Assurance Training Certification and Workforce Management DoD Directive (DoDD) 8570.01, Information Assurance Workforce Improvement Program DoD 8570.01-M, and Information Assurance AR 25-2 within thirty 30 calendar days of employment. Training is available at https://ia.signal.army.mil/DoDIAA/default.asp .
1.21.3 All Contractor employees, including subcontractors, performing services under this contract with access to a Government information system must be registered in the Army Training Certification Tracking System (ATCTS),. Verification of registration shall be provided to the COR within 30 days after registration. Contractor personnel must complete refresher training every twelve (12) months. Verification of the training shall be provided to the COR within 7 days after completion of the training.
1.22 Notice to Proceed: If applicable, the notice to proceed will be provided as indicated below.
☐The effective date of contract will constitute the date of notice to proceed ☐A notice to proceed letter will be issued ☐The date of the letter transmitting the contract will constitute the date of the notice to proceed
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or contractor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
https://ia.signal.army.mil/DoDIAA/default.asp
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations.
This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Not Applicable
2.1.7. PHYSICAL SECURITY. means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.
2.1.8. QUALITY ASSURANCE. (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). means the key Government-developed surveillance process document and is applied to Performance- Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS.
The QASP, with very few if any exceptions, is an internal to Government document.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor.
The Government does not have privity of contract with the subcontractor.
2.1.12. WORKDAY. Contractor will perform duties as long as it takes on specified dates of service in order to meet expectations in line with the QASP and meet the guidelines of this PWS.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: The Government will provide adequate space in the motor pool of building 252 to store the portable latrine trailers and enough space for contractor to conduct regularly scheduled maintenance on the piece of equipment.
3.2 Facilities: The Government will provide storage for the equipment and will provide the movement of trailers from Bldg. 252 to the training sites that the government will use.
3.3 Utilities: The Contractor shall instruct employees in utilities conservation practices.
The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.
3.4 Equipment: There will be no Government Furnished Equipment in performance of this contract.
3.5 Materials: There will be no Government Furnished Materials in the performance of this contract.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this
PWS.
4.2 Secret Facility Clearance: Not applicable
4.3. Equipment and Materials: Contractor shall lease 15 portable latrine units which will include two stalls with wash station, mounted on a trailer, and serviced twice weekly (Tuesdays and Fridays) by the contractor. This servicing includes cleaning toilets with a wash down, load dispensers with toilet paper, seat covers, soap, and paper towels, chemical for toilets, fragrance spray, and replacement of broken parts on toilets and trailer. Contractor is also responsible for washing down of interior stalls to ensure that cleanliness and sanitation standards are met.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
5.1. Basic Services. The contractor shall provide services for Field Latrines for Military Occupational Specialty (MOS-T) and Non-Commissioned Officer Professional Development Courses (NCOPDS) courses conducted by TASS Training Center (TTC) Fort Hunter Liggett (FHL) to support the Army program of individual training (ARPRINT) Mission: Each field latrine unit consists of two stalls with wash station, either trailer-mounted or placed on the ground, and serviced twice weekly by the Contractor. This servicing includes cleaning toilets (both interior and exterior) with a wash down, load dispensers with toilet paper, seat covers, soap, and paper towels, chemical for toilets, fragrance spray, and replacement of broken parts on toilets.
Cleaning will be conducted ever Tuesday and Friday for the life of the contract.
Contractor will replace broken or malfunctioned latrines at no additional cost to the government. The trailers will remain in the TTC parking lot for usage of the TTC at any time during the duration of this contract. Government will not request each date of usage as this contract will require full usage of latrines at any time desired by the government and contractor shall leave equipment onsite for usage. Contractor will not be required to move trailers from Bldg. 252 to training sites, the government will move these as needed.
5.2. Task Heading: Not Applicable
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
N/A
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1. Technical Exhibit 1 – Performance Requirements Summary
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
PRS # 1.
The contractor shall provide 15 Portable Latrine Systems as outlined in the PWS.
The contractor provided adequate serviceable portable latrine systems
Zero Deviation Random
PRS # 2
Contractor shall service latrine systems 2 times weekly on Tuesday and Friday at the location of the portable latrine regardless of the training area or obstacles
The contractor provided service and cleaning to the equipment which includes all items outlined in PWS
95 % Periodic
File details come from the government source that posted it. Updated .