This Performance Work Statement (PWS) details a non-personnel services contract for full elevator maintenance services at the Moncrief Army Health Clinic (MAHC) at Fort Jackson, South Carolina. The contract covers comprehensive maintenance for ten elevators in Building 4500, including preventive maintenance, repairs, inspections, and callbacks. The contract period spans five years, with a base year from August 1, 2025 to July 31, 2026, and four optional years extending through July 31, 2030.

The maintenance requirements include periodic inspections, cleaning, lubrication, adjustments, parts replacement, and repairs for all elevator system components such as machines, motors, controllers, safety mechanisms, door operators, and electrical systems. The contractor must perform weekly maintenance for gearless equipment, semi-monthly for geared equipment, and monthly for hydraulic equipment, spending a minimum of 4 hours per week on-site. Performance standards mandate maintaining the original manufacturer's design specifications, with zero deviation allowed from established performance thresholds. The contractor must also provide 24-hour callback service, comply with ANSI A17.1 Elevator and Escalator Code, and meet strict safety and operational requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

SERVICE ON 10 ELEVATORS

MONCRIEF ARMY HEALTH CLINIC

(MAHC) BLDG 4500 FORT JACKSON

SC 29207

8 Apr 2025

Part 1 General Information

1. General: This is a non-personnel services contract to provide all labor, material, and equipment to provide full maintenance of ten elevators in Building 4500, for Moncrief Army Health Clinic (MAHC) Fort Jackson, South Carolina 29207. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.

Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform full maintenance service contract as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.

1.2 Background: Under this contract, the contractor shall independently provide elevator maintenance and services to satisfy the overall operational objectives of Moncrief Army Health Clinic (MAHC).

1.3 Scope: The Contractor shall provide non-personal service(s). The (elevator maintenance) performance work statement (PWS) establishes the minimum requirements for a full maintenance program, which shall be contracted by the government with an approved contractor. The full maintenance contract shall cover the elevator as listed throughout this PWS. Contractor shall be required to provide full maintenance services. In addition, the contractor shall provide work estimates for services not covered in the contract.

1.3.1 Period of Performance: Base YR: 1 Aug 2025 - 31 July 2026

OPT YR 1: 1 Aug 2026 - 31 July 2027

OPT YR 2: 1 Aug 2027 - 31 July 2028

OPT YR 3: 1 Aug 2028 - 31 July 2029

OPT YR 4: 1 Aug 2029 - 31 July 2030

1.4 General Information:

1.4.1 Quality Control Plan (QCP): The Contractor’s existing quality assurance system shall be utilized in accordance with FAR 12.208. The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within 10 working days after the contract is awarded. The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is how he assures himself that his work complies with the requirement of the contract. The comprehensive written QCP shall be submitted to the KO and COR for review. Any changes made after must be submitted within 10 working days. After acceptance of the quality control plan the contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.

(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals).

(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses.

(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance.

(e) How the Contractor will ensure all keys issued will remain controlled items (Paragraph 1.7 Key Control).

(f) How the Contractor will inventory and track maintenance of all Government Provided

Equipment / Materials.

(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and

(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years. {Deliverable #1}.

(i) The Contractor shall inform the COR of issues or potential issues that might affect the performance within 1 hour of identifying those issues. Verbal reports shall be followed up by written reports within 2 working days. {Deliverable #2}.

1.4.3 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.4.4 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.

1.4.4.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.

When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st

Presidents’ Day 3rd Monday in February Juneteenth June 19th

Labor Day 1st Monday in September Veteran’s Day November 11th

Christmas Day December 25th

M. L. King Memorial Day 3rd Monday in Jan Memorial Day last Monday in May Independence Day July 4th

Columbus Day 2nd Monday in October Thanksgiving Day 4th Thursday in November

1.5 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.1 Government Facility Office Hours: The Government facility office hours are 0700 to 1630, (Monday through Friday) except U.S. Holidays identified in paragraph 1.4.4.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Government facility office hours are 0700 to 1630, (Monday through Friday) except U.S. Holidays identified in paragraph 1.4.4.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall provide support between the hours of 0700 to 1630, (Monday through Friday) except U.S. Holidays identified in paragraph 1.4.4.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall always maintain an adequate workforce, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.

1.5.2 Contractor Work Plan: The contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

The Contractor’s need for overtime will be approved only by the KO. If the need for overtime is anticipated, the Contractor must receive approval from the Contracting Officer. The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within 10 days after date of contract award. {Deliverable #3}

The Government will review and either accept or return their comments to the Contractor within10 days. The Contractor shall then have 3 days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.

1.5.3 Training Holidays: Training Holidays are historically granted as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday. However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.

1.5.4 Place of Performance: The work to be performed under this contract will be performed Moncrief Army Health Clinic, Fort Jackson, SC 29207.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Security Program: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.6.2 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control

System (IACS) processing requirements. The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

1.6.2.1 Installation Pass Log: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within 3 days after contract award. The log must at a minimum contain the following information (full name, date of birth, & driver’s license number & state issued). The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log. The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within 3 days. Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 5 days. If applicable, the Contractor shall provide the following information: Last, First and Middle Names, government issued personal identifier (e.g.

Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) and any other necessary information required to obtain a CAC or installation access card, to the COR with 5 days after award, unless circumstances require otherwise and as directed by the Contracting Officer. {Deliverable #4}.

The Contractor shall receive base access badges that will be renewed every year. These base access badges will be obtained within the first 30 calendar days after contract award and within five (5) days after any changes are made unless circumstances require otherwise and as directed by the Contracting Officer. The COR will provide format and content for the log during the post award meeting. {Deliverable #5}.

1.6.2.2 Background Checks: Contractor personnel performing work under this contract may be subject to a background check and must maintain the level of security required for the life of the contract.

1.6.3 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13).

1.6.4 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the public.

1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.

These procedures shall be included in the Quality Control Plan.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government. The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.

Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The name of the Program Manager & the "certified on-site technician" shall be provided in writing to the Contracting Officer no later than five (5) days after contract award. {Deliverable #6}.

Acceptance by the Contracting Officer is required before these individuals are permitted to perform any task on this contract. The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between the hours, 8:00 a.m. to 4:30 p.m., Monday through Friday except Federal holidays or when the government facility is closed for administrative reasons.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12 Contractor workspace: (parts cabinet and cart inside elevator mechanical room, provided by customer) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance within 10 working days after contract award {Deliverable #7}.

Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.3.

1.12.1 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, Medical Facilities, and School Services where children are present, recommend personnel wear identification when children are present.) The Contractor (to include subcontractors) shall provide each of their employees an easily readable identification badge.

The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee. Companies with U.S.

Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes. {Deliverable #8}.

1.13 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractorwithout written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose.

This right does not abrogate any other Government rights.

1.14 Non-Disclosure Requirements: If applicable, performance under this contract may require the Contractor to access data and information proprietary to a government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others.

The Contractor and Contractor personnel shall not divulge, or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

1.15 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.16 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI.

The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.17 Safety: The following provides information pertaining to Safety and Accident Prevention.

The Contractor shall maintain employee safety as one of its most important concerns. The Contractor shall provide employees with information and supplies necessary to comply with the Occupational Safety and Health Act (OSHA) and procedures stated in the Elevator Industry Field Employees' Safety Handbook. The Contractor shall conduct regular and systematic safety http://www.dimoc.mil/resources/limitations/ meetings with employees to discuss new procedures and improve on safety awareness. Site security and safety shall be in accordance with this PWS, the primary contract and /or in accordance with the KO’s instructions. The Contractor shall be responsible for all activity, security and safety inside the project area(s). Adherence to Hazardous Communication (MSDS), Hot Work, Lockout Tag-out, Life Safety, OSHA, NFPA, & Joint Commission protocols is required and shall be enforced. In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes. The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, NLT 5 days that such notifications were made. {Deliverable #9}.

1.18 Environmental Compliance: The following provides information on Environmental Compliance. The Contractor shall ensure that all its operations and activities conform to the environmental policy requirements. The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on installations are conducted in accordance with the Fort Jackson, SC Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards, and applicable environmental laws/standards.

If contract requires the use of hazardous materials/substances, the Contractor shall, prior to mobilization, inform the Contracting Officer (KO)/Contracting Officer Representative (COR) of the types and number of hazardous materials needed to be brought onto the Garrison in order to fulfill their contractual requirements. Contractor shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material. The KO/COR shall provide a copy of this information to the Garrison Fire Department and the Environmental Division.

Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards and applicable environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the Department of Public Works (DPW) Environmental Division.

The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills for any spill larger than 5 gallons to the Garrison Fire Department at CIV 803-751-4142.

The Contractor shall contact the COR & the Directorate of Public Works-Environmental Division for any spill larger than 5 gallons @ 803-445-4117. For a copy of the Garrison Environmental Policy, Spill Prevention and Response Red Plan, Garrison Solid Waste Policy and Final Governing Standards.

1.19 Required Training: The following provides information on training requirements.

1.19.1 Anti-Terrorism (AT) Level I Training: All contractors coming on Fort Jackson are required to complete AT Level 1 Training, OPSEC Training, and iWatch Training for each person working under their contract (to include sub-contractors) NLT 14 calendar days after contract start date. The OPSEC Plan ensures the contractor knows what information they will have access to that needs to be protected, and that they have a plan to protect it. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer, if a COR is not assigned) within 7 calendar days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil. Contractor personnel shall complete refresher training every twelve (12) months except AOR specific AT Level I training which shall be completed as required by local AT policies. If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training. {Deliverable #10}.

1.19.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 calendar days of employment under this contract. Verification of the training shall be provided to the COR with 5 calendar days after completion of the training. OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html. Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the COR with 5 calendar days after completion of the training. If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training. Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR with 5 calendar days after completion of the training {Deliverable #11}.

1.19.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days after the contract is awarded and within 7 calendar days after new employees commence contract performance, with the results reported to the COR within 7 calendar days after the contract is awarded. {Deliverable #12}.

Training slides can be found on the Army OneSource we site:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx

PART 2

DEFINITIONS & ACRONYMS

2. Definitions and Acronyms

2.1 Definitions: Although not inclusive of every term used within this PWS, the following https://jkodirect.jten.mil/ http://www.cdse.edu/catalog/elearning/GS130.html http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx provides a list of definitions used throughout this PWS and commonly used in the acquisition field.

Contracting Officer – means a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

Contracting Officer's Representative (COR) – As defined in DFARS 202.101, means an individual designated and authorized in writing by the Contracting Officer to perform specific technical or administrative functions. DoD Instruction (DoDI) 5000.72, Part II Definitions states the following when defining a COR: “Defined in subpart 202.101 of Reference (f). Any individual delegated responsibilities pursuant to subpart 1.602-2 of Reference (e), regardless of local terminology, must be certified in accordance with this instruction. For example, local terminology can be COR, Contracting Officer’s technical representative, technical point of contact, technical representative, alternate COR, administrative COR, assistant COR, line item manager, task order manager, quality assurance personnel, quality assurance evaluator, or COR management.” In addition, Army Regulation 70-13, Chapter 2, paragraph 2-2g, states, in part, the following when providing other surveillance support personnel to assist the COR when needed, “…These other surveillance support personnel may serve as on-site representatives of the COR in performance of actual contract surveillance if they meet all COR requirements and have been appointed by the Contracting Officer as alternate CORs.”

Contractor – means a supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

Contractor-acquired Property - means property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.

Day – means, unless otherwise specified, a calendar day.

Defective Service – means a service output that does not meet the standard of performance associated with the Performance Work Statement.

Deliverable – means anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

Government-furnished Property – As reflected in FAR 52.245-1, Government-furnished Property “means property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes contractor-acquired property if the contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract

Government Property - means all property owned or leased by the Government. Government property includes both Government-furnished and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.

Property Administrator - means an authorized representative of the Contracting Officer appointed in accordance with agency procedures, responsible for administering the contract requirements and obligations relating to Government property in the possession of a Contractor.

High Level Objective (HLO) – means a key overarching result-based objective for a project necessary to achieve the project’s vision. HLOs are like Level 2 in a Work Breakdown Structure. Each HLO may contain several statements to flesh out the areas necessary to meet the objective.

Physical Security – means that part of security concerned with physical measures designed to safeguard personnel; to prevent unauthorized access to equipment, installations, material, and documents; and to safeguard against espionage, sabotage, damage, and theft.

Quality Assurance – (or Government contract quality assurance) means the various functions, including, inspection, performed by the Government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.

Quality Assurance Surveillance Plan (QASP) – means the key Government-developed surveillance process document and is applied to Performance-Based Service Contracting (PBSC). The QASP is used for managing Contractor performance assessment by ensuring that systematic quality assurance methods validate that Contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards (i.e., quality, quantity, timeliness) specified in the Performance Work Statement (PWS). It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document Contractor performance results to determine if the Contractor has met the required standards for each objective in the PWS. The QASP, with very few if any exceptions, is an internal to Government document.

Quality Control – means all necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

Statement – means the specific results-based activities required to satisfy HLOs. A statement contains a result, the context of the statement, and the required action(s). Statements focus on “what” is to be accomplished; however, they are not prescriptive in describing “how” the outcome is to be achieved. Each HLO may have several statements to flesh out the areas necessary to meet the objective. Statements are like Level 3 in a Work Breakdown Structure.

Subcontractor – means one that enters a contract with a prime Contractor. The Government does not have privity of contract with the subcontractor.

Workday - The number of hours per day the Contractor provides services in accordance with the contract.

Work Week - Monday through Friday, unless otherwise specified.

2.2 Acronyms: Although not inclusive of every term used within this PWS, or that may be included in an acquisition, the following provides a list of acronyms commonly used in the acquisition field.

ACOR Alternate Contracting Officer's Representative AE Army in Europe AFARS Army Federal Acquisition Regulation Supplement AHA Activity Hazard Analysis AOR Area of Responsibility AR Army Regulation AT Anti-terrorism ATCTS Army Training Certification Tracking System CAC Common Access Card CCE Contracting Center of Excellence CFE Conventional Forces Europe CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer’s Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DoD Department of Defense FAR Federal Acquisition Regulation FRG Federal Republic of Germany GFP Government Furnished Property HLO High Level Objective HIPAA Health Insurance Portability and Accountability Act of 1996 IA Information Awareness IAC Installation Access Control IACO Installation Access Control Office ID Identification IGCE Independent Government Cost Estimate IT Information Technology JTR Joint Travel Regulation JPAS Joint Personnel Adjudication System KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operations Security PA Property Administrator PII Personally Identifiable Information PIPO Phase In/Phase Out

POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RA Requiring Activity RCO Regional Contracting Office SIGE Safety and Health Protection Plan TE Technical Exhibit USAG United States Army Garrison USAREUR United States Army Europe UOM Unit of Measure

PART 3

GOVERNMENT PROPERTY (GP) AND SERVICES

3. Government Property and Services

3.1 Utilities: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves, light switches, etc. after using the required amount to accomplish tasks requiring the use of the utilities.

3.2 Training: The Government will provide the following training: AT Level 1 Awareness, OPSEC, iWATCH, etc.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. Contractor Furnished Property and Services

4.1 General: The Contractor shall furnish all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall furnish to MAHC an approved Material Safety Data Sheet for all cleaning solvents, lubricants, oils, greases, paints, etc. used during their performance of the elevator preventive maintenance. A copy of the applicable Material Safety Data Sheets shall be visibly mounted in each elevator equipment room that contains these items in a protective cover.

4.2 Materials: If contract acquired property is anticipated, consultation with garrison or installation Property Administrator is required to ensure compliance with FAR 52.245-1. The Contractor shall provide Personal Protective Equipment, PPE, office supplies and materials such as, paper, printer cartridges, and all other office supplies and materials needed in the performance of this contract.

4.3 Vehicles and Equipment: The Contractor shall provide all necessary vehicles (no GSA vehicles provided to Contractor for use on this contract) and equipment to perform the work described in this PWS. All Contractor provided vehicles, and equipment shall have the company name prominently displayed on both sides of the vehicle or equipment and present a neat, professional appearance. Contractor's vehicles and equipment used in the performance of this contract shall meet all local traffic, safety, and environmental requirements. Vehicles and equipment found to be unsafe shall be removed from the installation and replaced. The Contractor shall not use any Government-owned tools, materials, or parts to maintain Contractor vehicles and equipment without prior written approval of the Contracting Officer.

The COR may inspect the Contractor’s vehicles and equipment at any time.

4.4 Background Checks): Contractor personnel performing work under this contract must have a background check at time of the proposal submission and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the Office of Personnel Management (OPM) Tier 1 investigation (uses the SF-85 form).

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS

5.1 BASIC SERVICES: This PWS provides for complete maintenance coverage including examinations, cleaning, painting, lubrication, adjusting, parts replacement, repairs and testing on all parts of the elevator equipment including, but not limited to, machines, worms, gears, thrust bearings, drive sheaves, sheave bearings, brake pulleys, brakes, brake coils, linings, rope grippers, motors, SCR, VVVFD, hydraulic power units, hydraulic pumps and valves, silencers, mufflers, controllers, selectors, relays, contactors, solid state devices, transformers, resistors and all related control equipment. It also includes safety governors, governor sheaves, car safeties, hydraulic plunger, bolster plate, jack packing, deflector and secondary sheaves, bearings, car and counterweight buffers, car and counterweight guide rails, limit switches, guide shoes (slide and roller), door operators, car and hatch door hangers, contacts, interlocks, auxiliary door closing devices, safety edges, photo eyes, emergency light systems including batteries, car fans, car lighting fluorescent tubes, light diffusers, lay-in ceiling panels, handrails, car frames, platforms and all other elevator related devices.

This PWS does not include car enclosures (including removable panels, door panels, car gates, plenum chambers, mirrors, bulletin boards, carpets and tile flooring), hoist way enclosure, hoist way gates, doors, frames and sills, underground hydraulic jack cylinders including underground piping and fittings, muzak, two-way communications equipment, fluorescent ballasts, and smoke sensors. These items are the responsibility of the Government.

5.2 SCHEDULED MAINTENANCE: All preventive maintenance performed by the Contractor shall be scheduled elevator by elevator prior to commencement of the contract and subject to final approval of the COR. Minimum preventive maintenance frequency visits shall be weekly for gearless equipment, semimonthly for geared equipment and monthly for hydraulic equipment. The Contractor shall spend a minimum of 4 hours a week doing on-site preventative maintenance. The preventive maintenance schedule, as prepared by the Contractor, shall show building name, elevator serial numbers, examination frequency, examination hours and be keyed to a preventive maintenance schedule prepared for the specific equipment covered by this PWS. Maintenance schedules shall be permanently located in the equipment rooms for each elevator. The schedules shall be accessible for MAHC’s monitoring. Schedules shall be maintained by indicating the work performed, signature of the mechanic performing the work and dated the day the work was performed. Contractor will record all visits using the Contractor provided roster located on the 9th floor of MAHC, outside RM 9-31. Removal of elevators from service shall be coordinated with and approved by MAHC. To the extent possible all preventive maintenance which requires removal of elevator from service shall be scheduled during off peak hours of building operation. No elevator shall be taken out of service during the normal business day without prior notification to MAHC except under emergency conditions. The Contractor shall not remove from service more than one elevator at a time in any bank of elevators (except in emergencies). Emergency circumstances are understood to be those that pose imminent possibility of equipment damage or passenger injury as judged by the Contractor's employees. Elevators taken out of service shall be identified by placing signage at every floor-indicating elevator is out of service. Signs shall be removed after service is restored.

5.3. EXAMINE: The Contractor shall examine the equipment at regular intervals sufficient to preserve the life of the equipment. When, as a result of examination, corrective action is determined to be the responsibility of the Contractor, the Contractor shall proceed immediately to make (or cause to be made) replacements, repairs and corrections. When such work is determined not to be the Contractor's responsibility, a written report signed by the Contractor, shall be delivered to the COR. If the COR disagrees with the Contractor's determination, the COR and the Contractor shall use their best efforts to resolve the disagreement in a manner mutually agreeable to the parties. If an agreement is not achieved, the COR and the Contractor shall meet with the Contracting Officer (KO) to resolve the issue.

Items of an emergency nature shall be communicated by the Contractor to the COR immediately and followed up in written form if requested. Examinations of the equipment shall follow the basic procedures recognized by the elevator service industry. (Paragraph 5.2 states minimum visits).

5.4. CLEAN: The Contractor shall clean all the elevator equipment as well as the elevator equipment room, hoist ways and pits. Cleaning of the equipment shall occur at regular intervals sufficient to maintain a professional appearance and preserve the life of the equipment. Minimum cleaning intervals shall be as set forth in paragraph 5.26 of this PWS.

The Contractor shall report to the COR the need for cleaning and/or janitorial services for any items not covered by this contract or which are otherwise not the responsibility of the Contractor.

5.5. PAINT: The Contractor shall paint the elevator equipment at intervals to maintain a professional appearance, prevent rusting and preserve the equipment. All paint shall be suitable for the purpose intended and be of a high quality. Paint shall not emit hazardous or offensive odors. Application of the paint shall, in all circumstances, comply with applicable local codes and/or current ANSI Elevator and Escalator Codes.

5.6. LUBRICATE: The Contractor shall lubricate all moving parts of the equipment. Lubricants shall be applied at intervals recommended by the equipment manufacturer or as dictated through use of the equipment.