Attachment 0001 Concrete Mtg Pads.pdf

PDF 623 KB Posted

Attached to
Concrete Pads Federal contract opportunity
Solicitation number
W519TC25Q2183
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document is a detailed set of technical drawings for concrete mounting pads at the Rock Island Arsenal Joint Manufacturing and Technology Center (RIA JMTC). The drawings, dated 21-JAN-25, provide comprehensive plans for six different laser and tube mounting pads in Building B299, including general locations, layout, demolition/cut plans, and elevation/construction specifications.

Key technical details include: mounting pads for North, Middle, and South Flat Lasers; North and South Tube Lasers; and an FTV Mounting Pad. The concrete specifications require 5000 PSI concrete, #5 rebar mesh 4" from top and bottom surfaces, 6" dowel embedment, and a 3/4" expansion joint. The plans specify careful installation procedures, including maintaining elevation within 1/4" deviation, avoiding disturbance to existing building columns and footings, and using precise cutting and demolition techniques for pad installation.

View the file

Other files for this federal contract opportunity

Other files attached to Concrete Pads, newest first.
File Type Posted
25Q2183 Amendment 0001.pdf PDF
25Q2183.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL LOCATIONS

CONCRETE MOUNTING PADS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

21-JAN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS

SHEET 1 OF 6B. McCLURE B. NILES

NONE

ELEVATION/CONSTRUCTION PLAN...6

DEMOLITION/CUT PLAN

LOCATION/LAYOUT PLAN

CONTRACTOR SECURITY NOTES

GENERAL NOTES

GENERAL LOCATIONS

INDEX

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

X

X

X

X

X

X

X

X X

X

X X

X

X

X

X

M I S S

I P P

I R

I V E R

LOCATIONS ON ROCK ISLAND ARSENAL

X

X

X

X

X

X

X X

X X

X

X X

X

X X X X X X X X X X X

X X

X

X

X

X X X

X

X

X

X

X X

X

X

X

X

X

X X

X

X X

X

X

21 29

30-G

70-G

2-G 3-G

4-G

6-G

50 52

62 64

102 104

157120144

301-G

314 312

220210

332333

204203

R O

C K

IS

L

A N

D

U .S . G

O V

E R

N M

E N

T

B R I D

G E

PARKING

RODMAN

D A V E N P

O R T

G

IL

L E

S P

IE

KINGSBURY

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

TERRACE

PARKING PARKING PARKING

HEDGE

LANE

SOUTH AVENUE

NORTHAVENUE

PARKING

PARKING

PARKING

PARKING

E A

S T

RODMAN

DRIVE

BECK

SYLVAN

AV

EN

U E

KING

DRIVE

SHED

B L U

N T

R O

A D

PROSPECT

DRIV

E

D R

IV

E

C E

M E T E R

Y

D R

IV

E

DYKE

ROAD

R O

D M

AN

BLUNT

PARKING

PARKING

PARKING

PARKING

PARKING

79 83

S Y

V N

R

IV

E

AVE

BAUMBECK AVENUE

216212

LO

C

K

AND

DAM

NO

. 1

BETTENDORF

DAVENPORT

MOLINE

ROCK ISLAND

C A N A L

M

O

L

I N

E

S L O U G H

E. RIVER DR. GRANT ST.

2ND ST.

4TH ST.

3RD ST.

STATE ST.

PC

X

XX

X

X

X

X

X

X X

X

X X

X

X X

X X

X

X

X

X

X

X X

X

B299-FIRST FLOOR ZONE-8

GUARD RAIL GUARD RAIL GUARD RAIL GUARD RAIL

WINDOW WINDOW

RIA#35073

1 1082 3 4 5 6 7 9 11 12 13 14 15 16 17

A

B

C

D

E

F

G

H

K

L

DN

DN

DN

DN DN

E L

E C

T R

IC

A

L G

E A

R

E L

E C

T R

IC

A

L G

E A

R

NORTH FLAT LASER MTG PAD

MIDDLE FLAT LASER MTG PAD

SOUTH FLAT LASER MTG PAD

FTV MTG PAD

NORTH TUBE LASER MTG PAD

SOUTH TUBE LASER MTG PAD

bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle

GENERAL NOTES

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

21-JAN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS

SHEET 2 OF 6B. McCLURE B. NILES

NONE

MANUAL PROCESSES.

ACCESS WITH COMMERCIAL CONCRETE PUMPING OR POWER DOLLY OR

10. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK SITE

OR TRUCK AGITATORS HALL BE ACCORDING TO THE FOLLOWING:

THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS

DISCHARGING.

WITHOUT THE ADDITION OF WATER OR WATER AND CEMENT PRIOR TO

WORKABLE CONDITION, SATISFACTORY FOR PLACEMETN IN THE WORK

SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND

9. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATIORS

SATURDAYS. FRAMING, TYING REBAR AND POURING WITH BE DAY SHIFT.

ON 2ND SHIFT STARTING FROM 2:30 TO 11:00 AT NIGHT OR

8. DEMOLITION/JACK HAMMERING/REMOVAL WILL BE PERFORMED

SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.

RIGID FOAM INSULATION FOR VIBRATION ISOLATION. JOINT SEALANT

CLEAN UP IS COMPLETE, LINE MOUNTING PADS AND CAPS WITH 3/4"

7. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL. AFTER

SHALL BE A MINIMUM OF 5000-PSI.

6. NEW CONCRETE FOR MACHINE MOUNTING PADS AND CAPS

CONVERTER ON ALL DIESEL ENGINES.

USED ARE GAS ENGINES. CONTRACTOR SHALL HAVE CATALYTIC

5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE IF EQUIPMENT

REGULATIONS.

CONCRETE AND REBAR FROM RIA IN ACCORDANCE WITH LOCAL

BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD BLOCKS,

4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH AS

OR THE UNDERLYING SOIL CAUSED BY THE CONSTRUCTION.

3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO FLOOR

PRESENT MUST BE CUT OFF EVEN WITH SAW CUTS.

2. WHEN SAW CUTTING AROUND THE WORK AREA, REBAR

DUST DURING ENTIRE DEMOLITION AND CONSTRUCTION.

1. THE CONTRACTOR WILL USE WATER TO ELIMINATE DUST

OF DISCHARGE deg-F (deg-C)

CONCRETE TEMPERATURE AT POINT

HAUL TIME

HOURS MINUTE

50-64 (10-17.5)

65-90 (18-32) - WITHOUT RETARDER

1 30

1 3065-90 (18-32) - WITH RETARDER

21. DRAWING NOT TO SCALE.

RIA REPRESENTATIVES IMMEDIATELY.

SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF

20. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND

OTHER EMBEDDED ITEMS AND INTO FORMS.

SO THAT CONCRTE IS WORKED AROUND REINFORCING AND

VIBRATING EQUIPMENT WITH HAND RODDING AND TAMPING

19. CONSOLIDATE PLACED CONCRETE USING MECHANICAL

PERFORMED BY COMPETENT, EXPERIENCED, QUALIFIED WORKMEN.

(AISC) STANDARDS AND SPECIFICATIONS. ALL WORK SHALL BE

COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL CONSTRUCTION

18. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL SHALL

OF THE EXISTING CONCRETE.

DOWELS WILL BE DRILLED A MINIMUM OF 6" INTO THE VERTICAL FACE

BOTTOM SURFACE AND HAVE A MINIMUM OF 2 RODS IN EACH DIRECTION.

SPACING. REBAR SHOULD BE A MINIMUM OF 4" AWAY FROM TOP OR

17. DOUBLE TIED LAYERS OF #5 REBAR MESH (5/8"). 12" X-W

COMPLETION OF THE PROJECT.

16. CONTRACTOR SHALL CLEAN UP THE WORKSITE AFTER

SITE UNDER CONSTRUCTION.

15. CONTRACTOR SHALL PROVIDE BARRICADES AROUND JOB

PEDESTRIAN INTERACTIONS.

WITHIN THE BUILDING TO ENSURE SAFE TRAFFIC AND

EQUIPMENT/TRUCKS GOING IN/OUT OF THE BUILDING AND

14. CONTRACTOR WILL PROVIDE SPOTTER/GROUND MAN FOR

GRADE TO ALLOW FOR PROPER GROUNDING OF MACHINE.

INTO MOUNTING PADS AND LEFT EXPOSED 6-INCHES ABOVE

13. CONTRACTOR WILL PROVIDED ONE GROUND ROD DRIVEN

UTILIZE PROPER PPE.

SAFETY RULES OF THE TRAD AND ENSURE ALL PERSONNEL

12. CONTRACTOR WILL FOLLOW AND APPLY ALL STANDARD

REPRESENTATIVE FOR GATE PASS AND FUNCTIONALITY.

11. CONTRACTOR WILL COORDINATE WITH CONTRACTING OFFICER

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

The RAMP program is discussed in the RIA-JMTC AT training.

Department.

Contractors will comply with any instructions given by the Rock Island Arsenal Police installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc.).

Contractor personnel working on Rock Island Arsenal are subject to participation in change.

The COR will keep the contractors informed on the current FPCON or any possible FPCON

The FPCON descriptions will be provided in the RIA-JMTC AT training.

threat. Services will resume when FPCON level is reduced to level Bravo or lower.

During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher iWATCH program. The iWATCH training will be provided in the RIA-JMTC AT training.

The Contractor and all associated subcontractors shall brief all employees on the local support of any future contract.

Contractors who routinely fail to return these items will not be issued them in placed in a drop box at a RIA-JMTC access point.

within 24 hours of no longer being needed. Items will returned to the COR or

RIA-JMTC electronic keys and access passes are accountable items and will be returned contractor5#32s employment.

IF00015 IF00015 at the end of the contract or the last day of an individual

Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause

Contractor will acquire and need to return all issued U.S. Government Common Access thru the RIA Directorate of Emergency Services.

will provide guidance to complete the Access Control Records Check request Form security policies and procedures (provided by government representative). The COR

(Army Directive 2014-05/AR 190-13), applicable installation, facility access and local identification Index (NCIC-III) and Terrorist Screening Database (TSDB) standards and procedures using the National Crime Information Center interstate

Contractor and all associated subcontractor employees shall comply with adjudication training will be provided in the RIA-JMTC AT training.

all employees on the local iWATCH program. The iWATCH

The Contractor and all associated subcontractors shall brief be issued them in support of any future contract.

Contractors who routinely fail to return these items will not box at a RIA-JMTC access point.

needed. Items will returned to the COR or placed in a drop items and will be returned within 24 hours of no longer being

RIA-JMTC electronic keys and access passes are accountable individual contractor�s employment.

IF00015 at the end of the contract or the last day of an access passes. Use FAR 52.204-9 or PADDS Clause IF00015 Government Common Access Cards, installation badges, and/or Contractor will acquire and need to return all issued U.S.

Form thru the RIA Directorate of Emergency Services.

guidance to complete the Access Control Records Check request (provided by government representative). The COR will provide facility access and local security policies and procedures Directive 2014-05/AR 190-13), applicable installation, Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army National Crime Information Center interstate identification comply with adjudication standards and procedures using the Contractor and all associated subcontractor employees shall require changes in contractor security matters or processes.

individual facility or installation change, the Government may contract, should the Force Protection Condition (FPCON) at any changes otherwise authorized by the change clause of this directed by DoD, HQDA, and/or local policy. In addition to the Personal Identity Verification of Contractor Personnel) as identity verification requirements (FAR clause 52.204-9, The contractor workforce must comply with all personal the installation Director of Emergency Services.

to meet installation access requirements to be accomplished by shall provide all information required for background checks The contractor and all associated subcontractors employees access pass being issued.

Operations Center prior to a RIA-JMTC electronic keys and contractor employee and subcontractor employee to the RIA-JMTC The contractor shall sign a Memorandum of Record for each completed.

Level I awareness training and assuring the training is training. The COR will be provided a copy of the RIA-JMTC AT controlled access areas shall complete AT Level I awareness requiring access to Army installations, facilities, or All contractor employees,including subcontractor employees, SECURITY NOTES

CONCRETE MOUNTING PADS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

21-JAN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS

SHEET 3 OF 6B. McCLURE B. NILES

NONE

B299 LAYOUT

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

21-JAN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS

SHEET 4 OF 6B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

GUARD RAIL GUARD RAIL GUARD RAIL GUARD RAIL

WINDOW WINDOW

RIA#35073

DN

DN

DN

DN DN

E L

E C

T R

IC

A

L G

E A

R

T

Y P

T

Y P

64' TYP

TYP

20'

T

Y P

18'

SOUTH FLAT LASER

MIDDLE FLAT LASER

NORTH FLAT LASER

S O

U T

H T

U B

E L

A S

E R

N O

R T

H T

U B

E L

A S

E R

F T

V

3'

2' TYP

bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle

CURRENT VIEW CUT LINE VIEW

1" EXPANSION JOINT

4"-8" EXISTING CONCRETE 4"-8" EXISTING CONCRETE

NEW MOUNTING PAD

DEMO AS NEEDED TO INSTALL

DISTURBED.

COLUMNS AND FOOTINGS WILL BE AVOIDED AND NOT

THICK WITH A 3/4" THICK EPOXY COATING. BUILDING

EXISTING CONCRETE FLOORS THAT ARE BETWEEN 4" AND 8"

NOTE: LASER MOUNTING PADS WILL REQUIRE REMOVAL OF

B299 DEMOLITION/CUT PLAN

CONCRETE MOUNTING PADS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

21-JAN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS

SHEET 5 OF 6B. McCLURE B. NILES

NONE

B299 ELEVATION/CONSTRUCTION PLAN

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

21-JAN-25

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS

SHEET 6 OF 6B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

4"-8" EXISTING CONCRETE

LAYERS. 6" DOWEL EMBEDMENT STANDARD.

#5 REBAR MESH 4" FROM TOP AND BOTTOM SURFACES

" CA6

3/4" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT

ELEVATION.

THE FINAL 12" CAN BE SLOPED TO MEET THE EXISTING

OVER 10'. IF THIS CANNOT MEET EXISTING CONCRETE

MUST MAINTAIN NO GREATER THAN 1/4" DEVIATION

ALWAYS BE THE SAME ELEVATION. MOUNTING PADS

AREA SURROUNDING MOUNTING PADS WILL NOT

NOTE:

5000 PSI CONCRETE

File details come from the government source that posted it. Updated .