Attachment 0001 Concrete Mtg Pads and Caps.pdf

PDF 1 MB Posted

Attached to
Concrete Fill/Cap Utility Trench and Concrete Blast Equipment Pit
Solicitation number
W519TC24R2042
Issued by

About this file

This document is a set of drawings and specifications for concrete mounting pads and caps to be installed at the Rock Island Arsenal as part of a federal contract opportunity.

The key details are:

  • The contract requires the installation of concrete mounting pads, utility trench caps, and a blast machine pit at various locations throughout the Rock Island Arsenal facility.
  • The drawings provide the specifications for the concrete work, including material requirements, dimensional details, and construction methods.
  • The accompanying federal contract opportunity is Solicitation Number W519TC24R2042, titled "Concrete Fill/Cap Utility Trench and Concrete Blast Equipment Pit", issued by the Department of the Army Materiel Command Contracting Command Rock Island Arsenal.

View the file

Other files

File Type Posted
24R2042 Amendment U00002.pdf PDF
24R2042 Released Sol.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL LOCATIONS

CONCRETE MOUNTING PADS AND CAPS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 1 OF 10B. McCLURE B. NILES

NONE

BLAST MACHINE PIT CAP

UTILITY TRENCH CAP

DOUBLE COLUMN #1 AND #2

CONTRACTOR SECURITY NOTES

GENERAL NOTES

GENERAL LOCATIONS

INDEX

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

X

X

X

X

X

X

X

X X

X

X X

X

X

X

X

M I S S

I P P

I R

I V E R

LOCATIONS ON ROCK ISLAND ARSENAL

X

X

X

X

X

X

X X

X X

X

X X

X

X X X X X X X X X X X

X X

X

X

X

X X X

X

X

X

X

X X

X

X

X

X

X

X X

X

X X

X

X

21 29

30-G

70-G

2-G 3-G

4-G

6-G

50 52

62 64

102 104

157120144

301-G

314 312

220210

332333

204203

R O

C K

IS

L

A N

D

U .S . G

O V

E R

N M

E N

T

B R I D

G E

PARKING

RODMAN

D A V E N P

O R T

G

IL

L E

S P

IE

KINGSBURY

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

TERRACE

PARKING PARKING PARKING

HEDGE

LANE

SOUTH AVENUE

NORTHAVENUE

PARKING

PARKING

PARKING

PARKING

E A

S T

RODMAN

DRIVE

BECK

SYLVAN

AV

EN

U E

KING

DRIVE

SHED

B L U

N T

R O

A D

PROSPECT

DRIV

E

D R

IV

E

C E

M E T E R

Y

D R

IV

E

DYKE

ROAD

R O

D M

AN

BLUNT

PARKING

PARKING

PARKING

PARKING

PARKING

79 83

S Y

V N

R

IV

E

AVE

BAUMBECK AVENUE

216212

LO

C

K

AND

DAM

NO

. 1

BETTENDORF

DAVENPORT

MOLINE

ROCK ISLAND

C A N A L

M

O

L

I N

E

S L O U G H

E. RIVER DR. GRANT ST.

2ND ST.

4TH ST.

3RD ST.

STATE ST.

PC

X

XX

X

X

X

X

X

X X

X

X X

X

X X

X X

X

X

X

X

X

X X

X

RIA-34403

DOORS

DN

cage

WINDOW = 42"x48"

WINDOW = 42"x48"

Safety

9'WIDE x 12'h. ROLL-UPGUARD RAIL 9'WIDE x 12'h. ROLL-UP

WINDOW = 42"x48"

INSPECTION

BREAK

AREA

FIRE

MAIN

FIRE

MAIN

FIRE

MAIN

TUNNEL

COVER

TUNNEL

COVERCOVER

TUNNEL

COVERCOVER

23 24 25 26 27 28 29

31 32 33 34 35 36 37 38 39 40 41

43 44 45

G

H

J

K

L

M

N

P

Q

R

U P

DN

UP

DN

UP

DN

UP

DN

UP

U P

U P

F I R

E C

O N

T R

O L

P A

N E

L S

B208-FIRST FLOOR

DOUBLE COLUMN #1

DOUBLE COLUMN #2

2 3 4 5 6 7 8 9 31 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

ROLL - UP

ACCOMMUNICATION

ITIT

A

B

C

D

E

F

G

H

K

L

M

N

O

P

R

S

T

S T

E A

M S

T E

A M

S T

E A

M

OPEN WELL

UTILITY TRENCH CAP

B220-FIRST FLOOR

B220-BASEMENT

b c d f h l m k g e a

TO

FORGE

SHOP

ELEVATOR

S T

E A

M

STATION

SUB

AIR CONDITIONER

ACCU-220-G-6

ACCU-220--1-1

T48

T47

T10

NID 1901477

AC

CHILLER

CODE 14159

AIR

COMPRESSOR

INTAKE

DECOMMISSIONED

GOVERNAIR

HVU-220-B-2

LEIBERT

AC

P

IP

IN

G

F O

R R

U B

B E

R R

O O

M

LEIBERT

C H

IL

L

E R

TRANE

T40

T41

T42RAISED CONCRETE

STEPPED

RAISED CONCRETE

STEPPED

RAISED CONCRETE

STEPPED

AC

C

U -2 -G -5

NEW PIT

SAME LEVEL

BLAST MACHINE PIT

bradley.niles Oval bradley.niles Oval bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle bradley.niles Rectangle

GENERAL NOTES

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 2 OF 10B. McCLURE B. NILES

NONE

MANUAL PROCESSES.

ACCESS WITH COMMERCIAL CONCRETE PUMPING OR POWER DOLLY OR

10. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK SITE

OR TRUCK AGITATORS HALL BE ACCORDING TO THE FOLLOWING:

THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS

DISCHARGING.

WITHOUT THE ADDITION OF WATER OR WATER AND CEMENT PRIOR TO

WORKABLE CONDITION, SATISFACTORY FOR PLACEMETN IN THE WORK

SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND

9. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATIORS

SATURDAYS. FRAMING, TYING REBAR AND POURING WITH BE DAY SHIFT.

ON 2ND SHIFT STARTING FROM 2:30 TO 11:00 AT NIGHT OR

8. DEMOLITION/JACK HAMMERING/REMOVAL WILL BE PERFORMED

SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.

RIGID FOAM INSULATION FOR VIBRATION ISOLATION. JOINT SEALANT

CLEAN UP IS COMPLETE, LINE MOUNTING PADS AND CAPS WITH 3/4"

7. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL. AFTER

SHALL BE A MINIMUM OF 5000-PSI.

6. NEW CONCRETE FOR MACHINE MOUNTING PADS AND CAPS

CONVERTER ON ALL DIESEL ENGINES.

USED ARE GAS ENGINES. CONTRACTOR SHALL HAVE CATALYTIC

5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE IF EQUIPMENT

REGULATIONS.

CONCRETE AND REBAR FROM RIA IN ACCORDANCE WITH LOCAL

BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD BLOCKS,

4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH AS

OR THE UNDERLYING SOIL CAUSED BY THE CONSTRUCTION.

3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO FLOOR

PRESENT MUST BE CUT OFF EVEN WITH SAW CUTS.

2. WHEN SAW CUTTING AROUND THE WORK AREA, REBAR

DUST DURING ENTIRE DEMOLITION AND CONSTRUCTION.

1. THE CONTRACTOR WILL USE WATER TO ELIMINATE DUST

OF DISCHARGE deg-F (deg-C)

CONCRETE TEMPERATURE AT POINT

HAUL TIME

HOURS MINUTE

50-64 (10-17.5)

65-90 (18-32) - WITHOUT RETARDER

1 30

1 3065-90 (18-32) - WITH RETARDER

21. DRAWING NOT TO SCALE.

RIA REPRESENTATIVES IMMEDIATELY.

SPECIFICATIONS SHALL BE BROUGHT TO THE ATTENTION OF

20. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND

OTHER EMBEDDED ITEMS AND INTO FORMS.

SO THAT CONCRTE IS WORKED AROUND REINFORCING AND

VIBRATING EQUIPMENT WITH HAND RODDING AND TAMPING

19. CONSOLIDATE PLACED CONCRETE USING MECHANICAL

PERFORMED BY COMPETENT, EXPERIENCED, QUALIFIED WORKMEN.

(AISC) STANDARDS AND SPECIFICATIONS. ALL WORK SHALL BE

COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL CONSTRUCTION

18. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL SHALL

OF THE EXISTING CONCRETE.

DOWELS WILL BE DRILLED A MINIMUM OF 6" INTO THE VERTICAL FACE

BOTTOM SURFACE AND HAVE A MINIMUM OF 2 RODS IN EACH DIRECTION.

SPACING. REBAR SHOULD BE A MINIMUM OF 4" AWAY FROM TOP OR

17. DOUBLE TIED LAYERS OF #4 REBAR MESH (1/2"). 12" X-W

COMPLETION OF THE PROJECT.

16. CONTRACTOR SHALL CLEAN UP THE WORKSITE AFTER

SITE UNDER CONSTRUCTION.

15. CONTRACTOR SHALL PROVIDE BARRICADES AROUND JOB

PEDESTRIAN INTERACTIONS.

WITHIN THE BUILDING TO ENSURE SAFE TRAFFIC AND

EQUIPMENT/TRUCKS GOING IN/OUT OF THE BUILDING AND

14. CONTRACTOR WILL PROVIDE SPOTTER/GROUND MAN FOR

GRADE TO ALLOW FOR PROPER GROUNDING OF MACHINE.

INTO MOUNTING PADS AND LEFT EXPOSED 6-INCHES ABOVE

13. CONTRACTOR WILL PROVIDED ONE GROUND ROD DRIVEN

UTILIZE PROPER PPE.

SAFETY RULES OF THE TRAD AND ENSURE ALL PERSONNEL

12. CONTRACTOR WILL FOLLOW AND APPLY ALL STANDARD

REPRESENTATIVE FOR GATE PASS AND FUNCTIONALITY.

11. CONTRACTOR WILL COORDINATE WITH CONTRACTING OFFICER

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

The RAMP program is discussed in the RIA-JMTC AT training.

Department.

Contractors will comply with any instructions given by the Rock Island Arsenal Police installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc.).

Contractor personnel working on Rock Island Arsenal are subject to participation in change.

The COR will keep the contractors informed on the current FPCON or any possible FPCON

The FPCON descriptions will be provided in the RIA-JMTC AT training.

threat. Services will resume when FPCON level is reduced to level Bravo or lower.

During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher iWATCH program. The iWATCH training will be provided in the RIA-JMTC AT training.

The Contractor and all associated subcontractors shall brief all employees on the local support of any future contract.

Contractors who routinely fail to return these items will not be issued them in placed in a drop box at a RIA-JMTC access point.

within 24 hours of no longer being needed. Items will returned to the COR or

RIA-JMTC electronic keys and access passes are accountable items and will be returned contractor5#32s employment.

IF00015 IF00015 at the end of the contract or the last day of an individual

Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause

Contractor will acquire and need to return all issued U.S. Government Common Access thru the RIA Directorate of Emergency Services.

will provide guidance to complete the Access Control Records Check request Form security policies and procedures (provided by government representative). The COR

(Army Directive 2014-05/AR 190-13), applicable installation, facility access and local identification Index (NCIC-III) and Terrorist Screening Database (TSDB) standards and procedures using the National Crime Information Center interstate

Contractor and all associated subcontractor employees shall comply with adjudication training will be provided in the RIA-JMTC AT training.

all employees on the local iWATCH program. The iWATCH

The Contractor and all associated subcontractors shall brief be issued them in support of any future contract.

Contractors who routinely fail to return these items will not box at a RIA-JMTC access point.

needed. Items will returned to the COR or placed in a drop items and will be returned within 24 hours of no longer being

RIA-JMTC electronic keys and access passes are accountable individual contractor�s employment.

IF00015 at the end of the contract or the last day of an access passes. Use FAR 52.204-9 or PADDS Clause IF00015 Government Common Access Cards, installation badges, and/or Contractor will acquire and need to return all issued U.S.

Form thru the RIA Directorate of Emergency Services.

guidance to complete the Access Control Records Check request (provided by government representative). The COR will provide facility access and local security policies and procedures Directive 2014-05/AR 190-13), applicable installation, Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army National Crime Information Center interstate identification comply with adjudication standards and procedures using the Contractor and all associated subcontractor employees shall require changes in contractor security matters or processes.

individual facility or installation change, the Government may contract, should the Force Protection Condition (FPCON) at any changes otherwise authorized by the change clause of this directed by DoD, HQDA, and/or local policy. In addition to the Personal Identity Verification of Contractor Personnel) as identity verification requirements (FAR clause 52.204-9, The contractor workforce must comply with all personal the installation Director of Emergency Services.

to meet installation access requirements to be accomplished by shall provide all information required for background checks The contractor and all associated subcontractors employees access pass being issued.

Operations Center prior to a RIA-JMTC electronic keys and contractor employee and subcontractor employee to the RIA-JMTC The contractor shall sign a Memorandum of Record for each completed.

Level I awareness training and assuring the training is training. The COR will be provided a copy of the RIA-JMTC AT controlled access areas shall complete AT Level I awareness requiring access to Army installations, facilities, or All contractor employees,including subcontractor employees, SECURITY NOTES

CONCRETE MOUNTING PADS AND CAPS

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 3 OF 10B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

B208 DOUBLE COLUMN #1 AND #2 LAYOUT

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 4 OF 10B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

3432534464

AIR INLET

CHILLER UNIT

40 TOOL MAGAZINE

SPINDLE CENTER

S/N 228271

MIST COLLECTOR

POWER INLET

CHIPS

MIST COLLECTOR

AIR INLET

POWER INLET

CHILLER UNIT

40 TOOL MAGAZINE

SPINDLE CENTER

CHIPS

S/N 207800

32687

34416 3419133996 34181

TRANS

FTV 8

40/

CHIP

TUBS

OPERATOR

CONTROL

STATIO

N

TRANS

FTV 8

50/

CHIP

TUBS

OPERATOR

CONTROL

STATIO

N

TRANS

FTV

0/

CHI

P

TUBS

OPERATOR

CONTROL

STATI

ON

TRANS

FTV

0/

CHI

P

TUBS

OPERATOR

CONTROL

STATI

ON

S/ N=7

9-

F0 0-

KM02

S/ N=7

9-

F0 0-

KM02

AIR

33883

T R

A N

S

HLD

H A

A S

S L

-2

CHIPS

DOOR HEIGHT 8'

DROP

AIR

DROP

AIR

DROP

AIR

DROP

AIR

PLEX

QUAD

120v

PLEX

QUAD

120v

PLEX

QUAD

120v

480v buss bar plug buss

DUPLEX

120v

Granite Table

7900183 R-90-254

DISCONNECT

FUSED

480v

SAFETY SWITCH

fused 3 phase

230V

SAFETY SWITCH

SINGLE phase

230V fused

FLOOR MOUNT

3 phase location transformer purposed

TRANSFORMER

WALL MOUNT

SINGLE phase

230V

RECEPTICAL

SINGLE phase

230V 20A

LINE

NETWORK

CHIPS

T O

O L

S

EC 300

33813

31947

B F

B F

B H

B F

RIA#35055

RIA#35056

26025

SUPERFLOW

M A

Z A

K H

C N

A

X I S

M

IB

32397

32475

C H

IP

S

HAAS SL30

RIA#34299

31099

S

BREAK

AREA

DN

UP

DN

UP

U P

LP-208-17a

L P b

L P

L P

K39K38K37K36K35K34K33K32 K40 K41

6"34'36'

CORNER OF EXISTING SLAB

#1

COLUMN

DOUBLE

#2

COLUMN

DOUBLE

bradley.niles Rectangle

B208 DOUBLE COLUMN #1 AND #2 DEMOLITION/CUT PLAN

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 5 OF 10B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

CURRENT VIEW CUT LINE VIEW

1" EXPANSION JOINT1" EXPANSION JOINT

12" EXISTING FOUNDATION 8"-12" EXISTING FOUNDATION 12" EXISTING FOUNDATION

NEW MOUNTING PAD

DEMO AS NEEDED TO INSTALL

PAD AND WORK WEST AND NORTH.

THE EXISTING SE CORNER OF THE EXISTING MOUNTING

MOUNTING PAD INSTALLED 2-3 YRS AGO. START FROM

DOUBLE COLUMN #2 WILL REMOVE PRIMARILY A 12" THICK

CONCRETE AND MISCELLANEOUS FOUNDATIONS.

NOTE: DOUBLE COLUMN #1 WILL REMOVE OLDER

B208 DOUBLE COLUMN #1 AND #2 ELEVATION/CONSTRUCTION PLAN

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 6 OF 10B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

12" EXISTING CONCRETE

LAYERS. 6" DOWEL EMBEDMENT STANDARD.

AND 3RD LAYER MIDWAY BETWEEN TOP AND BOTTOM

#4 REBAR MESH 4" FROM TOP AND BOTTOM SURFACES

" CA6

3/4" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT

ELEVATION.

THE FINAL 12" CAN BE SLOPED TO MEET THE EXISTING

OVER 10'. IF THIS CANNOT MEET EXISTING CONCRETE

MUST MAINTAIN NO GREATER THAN 1/4" DEVIATION

ALWAYS BE THE SAME ELEVATION. MOUNTING PADS

AREA SURROUNDING MOUNTING PADS WILL NOT

NOTE:

5000 PSI CONCRETE

B220 UTILITY TRENCH FILL & CAP LAYOUT

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 7 OF 10B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

34062

S/N=204077

TOOL CHANGER

MIE

34157

34163 34174

34179

COOLANT

CHILLER 34260

SUPERFLOW

GR

GR

T U

B

C H

I P

MAZAK

CHIP CONV.

REMOVAL OF

S/N 214442

H C

N

CHIP

TUB

S/N 213367

S/N 213311

P O

W E

R

TOOL

CHANGER

INTEGREX 300

MAZAK

S U

P E

R F

L O

W

C H

I P

C O

N V

R E

M O

V A

L O

F

CHIP TUB

C H

I P

T U

B

MAZAK

E-500 INTEGREX

DOUBLE SPINDLE

GR

Machining Cell #1

Finishing

Machining Cell #2

Finishing

Paint Booth and Finished Part Removal

Rough Part Installation

Dipping Station

Finished Part Tilting

Rough Part and

Dripping Station

Overhead Crane

Part Handling

S h u tt le C a r r ia g e

S ta n d b y S ta ti o n

S ta n d b y S ta ti o n

S ta n d b y S ta ti o n

S ta n d b y S ta ti o n

S ta n d b y S ta ti o n

P15 P16 P17 P18

O18O17O16O15O14

P14

T14 T15 T16 T17 T18 x 58' LONG x 2'DEEP

EXISTING TRENCH IS 2' WIDE

EXISTING TRENCH. NO ADDITIONAL DEMO REQUIRED

B220 UTILITY TRENCH FILL & CAP ELEVATION/CONSTRUCTION PLAN

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 8 OF 10B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

EXISTING CONCRETE 12" TO 24" THICK

TO MINIMIZE MOVEMENT. 6" DOWEL EMBEDMENT STANDARD.

#4 REBAR MIDWAY BETWEEN TOP AND BOTTOM

SAND

1/2" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT

5000 PSI CONCRETE

U P

T O

BLAST MACHINE PIT FILL & CAP LAYOUT

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 9 OF 10B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

SHELVES

ELEVATOR #3

M E N S

W O

M E N S

32707

DEL TECH

32055

NEW PIT

SAME LEVEL

K8

L8

M8 M9 M10 M11

L11

K11

TOP THAT CAN BE LEFT IN PLACE

THERE IS I-BEAM EDGING AROUND THE

PIT IS APPROXIMATELY 9' DEEP.

5' 18'

3'-6" 6'

2'-1"

EXISTING PIT. NO ADDITIONAL DEMO REQUIRED

bradley.niles Rectangle bradley.niles Rectangle

BLAST MACHINE PIT FILL & CAP ELEVATION/CONSTRUCTION PLAN

PLANT ENGINEERING

ROCK ISLAND ARSENAL JMTC

11-FEB-24

DRAWN

SCALE DATE

APPROVED

NO.

DRAWING

TARA-LGC

PLANT ENGINEERING DIVISION

ROCK ISLAND ARSENAL

CONCRETE MOUNTING PADS AND CAPS

SHEET 10 OF 10B. McCLURE B. NILES

NONE

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.

12" EXISTING CONCRETE

SAND

CREATE A SAFE EDGE TO AVOID TRIPPING HAZARD

3/4" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT

4000 PSI MINIMUM CONCRETE

FILL PIT WITH SAND AND CAP WITH APPROXIMATELY 12" OF CONCRETE