Attachment 0001 - ChooChoo Concrete Drawings.pdf
PDF 653 KB Posted
- Attached to
- Concrete Work for JMTC Federal contract opportunity
- Solicitation number
- W9098S22Q0010
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q and A Sheet - W9098S22Q0010.docx | DOCX document | |
| W9098S22Q0010 P00003.pdf | ||
| Q and A Sheet - W9098S22Q0010.docx | DOCX document | |
| W9098S22Q0002 P00002.pdf | ||
| Attachment 0002 - Site Visit Meeting Place Map.pdf | ||
| Attachment 0004 - Visitor Safety Card.pdf | ||
| Attachment 0002 - Site Visit Meeting Place Map.pdf | ||
| Attachment 0003 - Rock Island Arsenal Access Request Form.pdf | ||
| W9098S22Q0010 P00001.pdf | ||
| W9098S22Q0010.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PC
NOTES
21 29
30-G
70-G
2-G 3-G
4-G
6-G
50 52
62 64
102 104
157120144
301-G
314 312
220210
332333
204203
R O
C K
IS
L
A N
D
U .S . G
O V
E R
N M
E N
T
B R I D
G E
PARKING
RODMAN
D A V E N P
O R T
G
IL
L E
S P
IE
KINGSBURY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
TERRACE
PARKING PARKING PARKING
HEDGE
LANE
SOUTH AVENUE
NORTHAVENUE
PARKING
PARKING
PARKING
PARKING
E A
S T
RODMAN
DRIVE
BECK
SYLVAN
AV
EN
U E
KING
DRIVE
SHED
B L U
N T
R O
A D
PROSPECT
DRIV
E
D R
IV
E
C E
M E T E R
Y
D R
IV
E
DYKE
ROAD
R O
D M
AN
BLUNT
PARKING
PARKING
PARKING
PARKING
PARKING
79 83
S Y
V N
R
IV
E
AVE
BAUMBECK AVENUE
216212
LO
C
K
AND
DAM
NO
. 1
BETTENDORF
DAVENPORT
MOLINE
ROCK ISLAND
C A N A L
M
O
L
I N
E
S L O U G H
E. RIVER DR. GRANT ST.
2ND ST.
4TH ST.
3RD ST.
STATE ST.
X
X X
X
X X
X
X
X
X
M I S S
I P P
I R
I V E R
LOCATION ON ROCK ISLAND ARSENAL
of Discharge F (C) Concrete Temperature at Point
50-64 (10-17.5)
65-90 (18-32) - without retarder
65-90 (18-32) - with retarder
Haul Time
Hours Minutes
DUST DURING ENTIRE CONSTRUCTION.
1. THE CONTRACTOR WILL USE WATER TO ELIMINATE
CONSTRUCTION.
FLOOR OR THE UNDERLYING SOIL CAUSED BY THE
3. THE CONTRACTOR SHALL REPAIR ANY DAMAGE TO
WITH LOCAL REGULATIONS.
BLOCKS, CONCRETE AND REBAR OFF RIA IN ACCORDANCE
AS BOLTS, CANS, BEAMS, CONDUIT, PLATES, PIPES, WOOD
4. THE CONTRACTOR SHALL REMOVE ALL DEBRIS SUCH
CONVERTER ON ALL DIESEL ENGINES.
*CONTRACTOR SHALL HAVE CATALYTIC*
EQUIPMENT USED ARE GAS ENGINES.
5. CONTRACTOR SHALL VENT EXHAUST OUTSIDE. IF
AFTER COMPLETION OF THE PROJECT.
7. THE CONTRACTOR SHALL CLEANUP THE WORKSITE
FOR EQUIPMENT / TRUCKS GOING IN AND OUT OF BLDG.
12. CONTRACTOR WILL PROVIDE SPOTTER / GROUND MAN
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
GENERAL NOTES
A MIN. 5000 PSI.
6. NEW CONCRETE FOR MACHINE FOUNDATION SHALL BE
JOINT SEALANT SHALL BE BASF SONOLASTIC SL-1 OR EQUAL.
1/2" RIGID FOAM INSULATION FOR VIBRATION ISOLATION.
AFTER CLEANUP IS COMPLETE, LINE FOUNDATION WITH
8. EXPANSION JOINT MATERIAL UP TO 84" DEEP TYPICAL.
WITH SAW CUTS.
REBAR WILL BE PRESENT AND MUST BE CUT OFF EVEN
2. WHEN SAW CUTTING FLOOR AROUND WORK AREA,
FRAMING, TYING OF REBAR WILL BE DAY SHIFT WORK.
*POURING OF NEW CONCRETE WILL BE ON FRIDAY OR SATURDAY*
QUALIFIED WORKMENT.
WORK SHALL BE PERFORMED BY COMPETENT, EXPERIENCED,
CONSTRUCTION (AISC) STANDARDS AND SPECIFICATIONS. ALL
SHALL COMPLY WITH LATEST AMERICAN INSTITUTE OF STEEL
15. FABRICATION AND INSTALLATION OF STRUCTURAL STEEL
2:30 PM AND 11:00 PM OR SATURDAYS.
9. JACK HAMMERING / REMOVAL WILL BE DONE BETWEEN THE TIMES OF
OR TRUCK AGITATORS SHALL BE ACCORDING TO THE FOLLOWING:
THE MAXIMUM HAUL TIME FOR CONCRETE TRANSPORTED IN TRUCK MIXERS
WORKABLE CONDITION. SATISFACTORY FOR PLACEMENT IN THE WORK.
SHALL BE DELIVERED TO THE SITE OF THE WORK IN A PLASTIC AND
10. CONCRETE TRANSPORTED IN TRUCK MIXERS OR TRUCK AGITATORS
CONTRACTOR SHALL PROVIDE AND PLACE THE BARRICADES
11. BARRICADES WILL BE POSITIONED 6' FROM EACH SIDE OF THE WORK AREA.
INTO THE VERTICAL FACE OF THE EXISTING CONCRETE.
DIRECTION. DOWELS WILL BE DRILLED A MINIMUM OF 6"
SURFACE AND HAVE A MINUMUM OF 2 RODS IN EACH
SPACING. REBAR SHOULD BE A MIN OF 3" BELOW
13. SINGLE TIED LAYER OF #4 REBAR (1/2"), 12" X-W
RIA REPRESENTATIVE JOE CARPENTIER IMMEDIATELY.
SPECIFICATIONS, SHALL BE BROUGHT TO THE ATTENTION OF
16. ANY DISCREPANCIES IN PLANS, OR BETWEEN PLANS AND
211- CURRENT LAYOUT
SECURITY NOTES
211 - DEMO LAYOUT
INDEX
B. NILES
TARA-IFF
SHEET- 1 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
CONCRETE FOR CHOO CHOO
J. CARPENTIER
10-04-21
AND INTO FORMS.
IS WORKED AROUND REINFORCING AND OTHER EMBEDDED ITEMS
EQUIPMENT WITH HAND RODDING AND TAMPING SO THAT CONCRETE
14. CONSOLIDATE PLACED CONCRETE USING MECHANICAL VIBRATING
19. DRAWING NOT TO SCALE.
FILL MATERIAL.
AIR VOIDS OR BIODEGRADABLE MATERIAL IMPREGNATED IN THE
INCHES OR LESS AND LEAVE THE COMPLETE LAYERS WITH NO
17. FILL WILL BE COMPACTED BETWEEN EACH LIFT EQUALING 12
WILL BE CONCRETE.
FROM THE TOP OF FINISHED GRADE. THE REMAINING 12 INCHES
18. RECYCLED FILL WILL NOT BE ADDED TO MORE THAN 12 INCHES
CONCRETE FOR CHOO CHOO
211 - NEW CONCRETE LAYOUT
211 - CUT VIEW
211 - NEW CONCRETE SIDE VIEW
21 29
30-G
70-G
2-G 3-G
4-G
6-G
50 52
62 64
102 104
157120144
301-G
314 312
220210
332333
204203
R O
C K
IS
L
A N
D
U .S . G
O V
E R
N M
E N
T
B R I D
G E
PARKING
RODMAN
D A V E N P
O R T
G
IL
L E
S P
IE
KINGSBURY
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
TERRACE
PARKING PARKING PARKING
HEDGE
LANE
SOUTH AVENUE
NORTHAVENUE
PARKING
PARKING
PARKING
PARKING
E A
S T
RODMAN
DRIVE
BECK
SYLVAN
AV
EN
U E
KING
DRIVE
SHED
B L U
N T
R O
A D
PROSPECT
DRIV
E
D R
IV
E
C E
M E T E R
Y
D R
IV
E
DYKE
ROAD
R O
D M
AN
BLUNT
PARKING
PARKING
PARKING
PARKING
PARKING
79 83
S Y
V N
R
IV
E
AVE
BAUMBECK AVENUE
216212
LO
C
K
AND
DAM
NO
. 1
BETTENDORF
DAVENPORT
MOLINE
ROCK ISLAND
C A N A L
M
O
L
I N
E
S L O U G H
E. RIVER DR. GRANT ST.
2ND ST.
4TH ST.
3RD ST.
STATE ST.
PC
X
X X
X
X X
X
X
X
X
M I S S
I P P
I R
I V E R
LOCATION ON ROCK ISLAND ARSENAL
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
CONCRETE FOR CHOO CHOO
The RAMP program is discussed in the RIA-JMTC AT training.
Department.
Contractors will comply with any instructions given by the Rock Island Arsenal Police installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc.).
Contractor personnel working on Rock Island Arsenal are subject to participation in change.
The COR will keep the contractors informed on the current FPCON or any possible FPCON
The FPCON descriptions will be provided in the RIA-JMTC AT training.
threat. Services will resume when FPCON level is reduced to level Bravo or lower.
During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher iWATCH program. The iWATCH training will be provided in the RIA-JMTC AT training.
The Contractor and all associated subcontractors shall brief all employees on the local support of any future contract.
Contractors who routinely fail to return these items will not be issued them in placed in a drop box at a RIA-JMTC access point.
within 24 hours of no longer being needed. Items will returned to the COR or
RIA-JMTC electronic keys and access passes are accountable items and will be returned contractor5#32s employment.
IF00015 IF00015 at the end of the contract or the last day of an individual
Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause
Contractor will acquire and need to return all issued U.S. Government Common Access thru the RIA Directorate of Emergency Services.
will provide guidance to complete the Access Control Records Check request Form security policies and procedures (provided by government representative). The COR
(Army Directive 2014-05/AR 190-13), applicable installation, facility access and local identification Index (NCIC-III) and Terrorist Screening Database (TSDB) standards and procedures using the National Crime Information Center interstate
Contractor and all associated subcontractor employees shall comply with adjudication
SECURITY NOTES
training will be provided in the RIA-JMTC AT training.
all employees on the local iWATCH program. The iWATCH
The Contractor and all associated subcontractors shall brief be issued them in support of any future contract.
Contractors who routinely fail to return these items will not box at a RIA-JMTC access point.
needed. Items will returned to the COR or placed in a drop items and will be returned within 24 hours of no longer being
RIA-JMTC electronic keys and access passes are accountable individual contractors employment.
IF00015 at the end of the contract or the last day of an access passes. Use FAR 52.204-9 or PADDS Clause IF00015
Government Common Access Cards, installation badges, and/or
Contractor will acquire and need to return all issued U.S.
Form thru the RIA Directorate of Emergency Services.
guidance to complete the Access Control Records Check request
(provided by government representative). The COR will provide facility access and local security policies and procedures
Directive 2014-05/AR 190-13), applicable installation, Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army
National Crime Information Center interstate identification comply with adjudication standards and procedures using the
Contractor and all associated subcontractor employees shall require changes in contractor security matters or processes.
individual facility or installation change, the Government may contract, should the Force Protection Condition (FPCON) at any changes otherwise authorized by the change clause of this directed by DoD, HQDA, and/or local policy. In addition to the
Personal Identity Verification of Contractor Personnel) as identity verification requirements (FAR clause 52.204-9, The contractor workforce must comply with all personal the installation Director of Emergency Services.
to meet installation access requirements to be accomplished by shall provide all information required for background checks
The contractor and all associated subcontractors employees access pass being issued.
Operations Center prior to a RIA-JMTC electronic keys and contractor employee and subcontractor employee to the RIA-JMTC
The contractor shall sign a Memorandum of Record for each completed.
Level I awareness training and assuring the training is training. The COR will be provided a copy of the RIA-JMTC AT controlled access areas shall complete AT Level I awareness requiring access to Army installations, facilities, or
All contractor employees,including subcontractor employees, SECURITY NOTES
B. NILES
TARA-IFF
SHEET- 2 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
CONCRETE FOR CHOO CHOO
J. CARPENTIER
10-04-21
FOOTING
COLUMN
FOOTING
COLUMN
FOOTING
COLUMN
CONCRETE FOR CHOO CHOO
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
B. NILES
TARA-IFF
SHEET- 3 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
CONCRETE FOR CHOO CHOO
J. CARPENTIER
10-04-21
CURRENT LAYOUT
PIT
PIT WALL
PIT WALL
PIT WALL
PIT WALL
PIT WALL
PIT WALL PIT WALL
PIT WALL
CONCRETE FOR CHOO CHOO
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
B. NILES
TARA-IFF
SHEET- 4 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
CONCRETE FOR CHOO CHOO
J. CARPENTIER
10-04-21
DEMO LAYOUT
10 17
FOOTING
COLUMN
FOOTING
COLUMN
10 17
FOOTING
COLUMN
FOOTING
COLUMN
CONCRETE FOR CHOO CHOO
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
B. NILES
TARA-IFF
SHEET- 5 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
CONCRETE FOR CHOO CHOO
J. CARPENTIER
10-04-21
NEW CONCRETE LAYOUT
1" EXPANSION JOINT
12"-18" EXISTING CONCRETE
CURRENT VIEW CUT LINE VIEW
12" DEEP MACHINE PIT
PIT WALL
8" THICK 12" DEEP MACHINE PIT
12"
DEMO BELOW
1" EXPANSION JOINT
MEET PAD DIMENSIONS
DEMO AS NEEDED TO
12"-18" EXISTING CONCRETE
B. NILES
TARA-IFF
SHEET- 6 OF 7
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
CONCRETE FOR CHOO CHOO
J. CARPENTIER
10-04-21
CONCRETE FOR CHOO CHOO
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
CUT VIEW
CA6 OR EXISTING CONCRETE IF BELOW 12"
NOTES:
EXISTING ELEVATION.
MEET TO SLOPED BE CAN 12" FINAL THE SLAB
EXISTING MEET NOT CAN THIS IF DEVEATION. 10'
OVER 1/4" A THAN GREATER NO MAINTAIN MUST
FOUNDATION ELEVATION. SAME THE BE ALWAYS
NOT WILL FOUNDATION SURROUNDING AREA 1.)
B. NILES
TARA-IFF
SHEET- 2 OF 4
DRAWN BY
SCALE DATE
APPROVED
ROCK ISLAND ARSENAL
NA
PLANT ENGINEERING DIRECTORATE
NO.
DRAWING
CONCRETE FOR CHOO CHOO
J. CARPENTIER
10-04-21
CONCRETE FOR CHOO CHOO
ROCK ISLAND ARSENAL JMTC
PLANT ENGINEERING
NEW CONCRETE SIDE VIEW
12"-18" EXISTING CONCRETE12"
6" CA6
5000 PSI CONCRETE
PRODUCT WILL BE USED IN TOPICAL CRACK
1/2" EXPANSION JOINT MATERIAL - SL-1 OR EQUIVALENT
6" DOWEL EMBEDMENT
#4 BAR
REINFORCING BAR NOTES:
4" DOWN FROM SURFACE OF CONCRETE
2 EVENLY SPACED LONGITUDINAL BARS
| 211 - ChooChoo Concrete - Page 1 |
| 211 - ChooChoo Concrete - Page 2 |
| 211 - ChooChoo Concrete - Page 3 |
| 211 - ChooChoo Concrete - Page 4 |
| 211 - ChooChoo Concrete - Page 5 |
| 211 - ChooChoo Concrete - Page 6 |
| 211 - ChooChoo Concrete - Page 7 |
File details come from the government source that posted it. Updated .