Attachment 0001 2023-0739 SOW_Repair Davenport End of Government Bridge 2023_05_09.pdf

PDF 313 KB Posted

Attached to
Repair Davenport End of Government Bridge
Solicitation number
W519TC-23-R-2054
Issued by

About this file

This scope of work document outlines the requirements for a construction project to repair the roundabout and roadways at the end of the Government Bridge in Davenport, Iowa under solicitation number W519TC-23-R-2054 from the Department of the Army Materiel Command Contracting Command Rock Island Arsenal. The project includes removing existing pavement and sidewalks, grading, and repaving the roundabout, East 2nd Street, and Le Claire Street with Portland cement concrete and constructing splitter islands. It also requires relocating an existing "ARMY" sign, installing signage and striping, adjusting utilities, seeding and landscaping disturbed areas. The contractor must complete the work within 160 calendar days and is subject to liquidated damages of $1,000 per day for delays. The document provides specifications, drawings in Appendix A, and requirements for safety, environmental compliance, security, and energy conservation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project # 2023-0739 Repair Davenport End of Government Bridge

1 | P a g e

Rock Island Arsenal Scope of Work

PR #2023-0739

Repair Davenport End of Government Bridge

US Army Garrison‐Rock Island Arsenal

Directorate of Public Works Engineering and Services Division

AMIM‐RIP‐G

1 Rock Island Arsenal

Rock Island, IL 61299‐5000

2 | P a g e

PROJECT SUMMARY: The scope of this project consists of furnishing labor, equipment and material to remove the existing pavement, grade and fully repave a roundabout at the end of the Government Bridge at the City of Davenport location. The project is located at the end of the Government Bridge at intersection of East 2nd Street and Le Claire Street in Davenport, Iowa.

1. PART ONE: SPECIFIC PROJECT

PROJECT DESCRIPTION: US Army Garrison – Rock Island Arsenal (RIA) is seeking a construction project to remove the existing pavement, grade and fully pave at the end of the Government Bridge at the intersection of East 2nd Street and Le Claire Street in Davenport, Iowa. The Contractor shall provide construction services for the project. The premise for this project is to remove the existing pavement and sidewalk outlined in the plans, re-grade and pour a roundabout intersection. The roundabout, East 2nd Street and Le Claire Street shall be 9-inch Portland Cement Concrete (P.C.C.) with reinforcement at the joints with a standard 6-inch curb and gutter at 30-inch width and 9” depth, placed on a 12-inch modified subbase unless otherwise noted in the plan sheets found in Appendix “A”. The project includes removing the existing Army sign located along the edge of East 2nd Street by removing the existing foundation and building a new foundation and re-erecting the ARMY sign at the new location. Removing and replacing the existing sidewalk along East 2nd Street and Le Claire Street. Adjusting existing manholes and utility valves to the proposed final grades. Relocating existing road barrier blocks to the Rock Island Arsenal. The finish grade shall receive 6” of topsoil and hydro seed, fertilizer and mulch. The project shall be constructed using the Iowa State Urban Design and Specifications Program (SUDAS) 2023. The technical criteria contained and cited in this Scope of Work (SOW) and all accompanying appendices shall establish the minimum construction standards for this project. The Contractor shall make the Government aware in writing of any conflicts within these minimum standards by informing the Contracting Officer’s Representative (COR). The KO/COR reserves the right to determine how conflicting standards shall be resolved. This project will require the following work activities:

1.1.1 Demolition and removal of existing roadway of 2nd Street and Le Claire Street.

Limits of demolition can be found in Appendix “A” sheet D.01

1.1.2 Demolition and removal of the existing sidewalk and street scape along East 2nd

Street and Le Claire Street

1.1.3 Align and grade 2nd Street.

1.1.4 Align and grade Le Claire Street.

1.1.5 Align and grade the roundabout.

1.1.6 Align and grade the sidewalk along the east side of Le Claire Street.

1.1.7 The streets and roundabout paving shall consist of 9” PCC pavement with a 12” modified subbase along with joint epoxy coated reinforcement steel. See “B Sheets” and “D Sheets” for specifics and details in the plan set of Appendix “A”.

1.1.8 All driveway entrances and sidewalks shall be a 6” Portland Concrete Cement (P.C.C.) C-4 mix with 6”x6” welded wire fabric.

1.1.9 The curb and gutter shall be a 6” standard curb and gutter or 3” driveway drop curb see SUDAS Fig. 7010.102 (PV-102). The contracting authority reserves the

3 | P a g e right to change portions of the 6” curb and gutter to “Driveway Drop Curb” if it improves drainage or mobility.

1.1.10 The existing “ARMY” sign is to be relocated to accommodate the new roundabout. The relocation of the existing sign includes a demolition of the existing foundation and constructing a new foundation.

1.1.11 Splitter islands shall be constructed of 9” red P.C.C. pavement at the intersections of East 2nd Street and Le Claire Street.

1.1.12 The existing brick street scape along the East 2nd Street shall be removed and replaced with red, brick stamped, 6” P.C.C. pavement.

1.1.13 The center island of the roundabout shall consist of 6” red concrete.

1.1.14 All disturbed areas shall be hydraulic seeded, fertilized and mulched. If construction ceases due to inclement weather, the contractor shall apply a temporary cool seed mix and cover to prevent erosion on exposed areas. Seed windows for a permanent seed application apply between March 1 and May 31 and between August 10 and September 30. Any seeding outside of this window requires the approval of the KO/COR or project engineer.

1.1.15 Reinstall existing and new signage and apply traffic striping and symbols.

1.1.16 Adjust existing sanitary manholes to finish grade.

1.1.17 Adjust existing utility valves to finish grade.

1.1.18 Remove and replace existing tree box grates.

1.1.19 Install signage and pavement markings.

1.1.20 Place 6” of topsoil in locations labeled in the plan set found in Appendix “A”.

1.1.21 Hydro seed, fertilize and mulch all disturbed green space areas.

1.2 SPECIAL SERVICES/REQUIREMENTS

1.2.1 Contractor shall provide all services, labor, materials, supervision, equipment, tools, etc. necessary to accomplish the work described in this SOW.

1.2.2 Disruption of the local businesses shall be minimized. Any potential interferences with the local businesses shall be coordinated with the KO/COR to minimize disruption. The contractor shall maintain and coordinate continued access to local businesses through the length of the project. Fire and emergency service access to local businesses must be maintained through the entire project.

1.2.3 The contractor shall submit a phasing plan of execution. A 48-hour notice must be given to the Department of Public works prior to any temporary closure or change in plan.

1.2.4 The contractor shall submit a pavement joint and saw cutting plan prior to paving.

1.2.5 This project shall be constructed in accordance with the 2023 edition of the

SUDAS Specifications unless otherwise noted.

1.2.6 It shall be the responsibility of the contractor to protect all existing utilities and paved streets, including any not shown on these drawings. The contractor shall verify all existing utilities prior to construction and notify the engineer of record and department of public works if any conflicts with the drawings occur. Any damage to existing utilities caused by trenching and grading operations shall be repaired at the contractor's expense. Existing utility locations shown on the drawings are approximate. It is possible that there are other utilities whose existence is presently not known or shown. It shall be the contractor's

4 | P a g e responsibility to determine the type and location of underground utilities and to avoid damage thereto. Minor conflict with underground utilities that are abandoned but not removed by the owner of the utility shall be removed as necessary for the construction of the project by the contractor. Removal shall be incidental to the job.

1.2.7 The contractor shall be responsible for field verifying all existing utility locations including but not limited to storm sewer, sanitary sewer, manholes, gas mains, fiber optic duct banks, water mains, and electrical and telecommunications.

1.2.8 The Department of Public Works (DPW) shall have access to the project for construction and to make extensions or adjustments of services.

1.2.9 All unsuitable material, construction debris resulting from construction operations shall be properly disposed of off-site in accordance with local, state and federal guidelines.

1.2.10 It shall be the contractor's responsibility to provide waste areas or disposal sites for excess or undesirable material. This material is not to be incorporated in the work involved in this project. Overhaul will not be accepted on this project.

1.2.11 The contractor shall prevent silt and debris from entering storm sewers and culverts and shall remove any such material that enters them. Care shall be taken to prevent storm water from undermining the pavement during construction. If areas become undermined, they shall be repaired in a manner acceptable to the engineer/KO/COR representative. Pressure grouting may be required.

1.2.12 The contractor shall be responsible for keeping adjacent streets free from excessive build-up of soil and/or granular material from the project. The contractor shall clean excess soil and other material from the adjacent streets as required by the engineer/KO/COR representative. Any damage done to existing streets shall be repaired at the contractor's expense.

1.2.13 The contractor shall take measures to prevent the spread of dust from the construction areas and haul routes, which include the application of water as directed by the engineer/KO/COR representative. This work shall be considered incidental to earth excavation.

1.2.14 When not initiated at an existing joint, removal of existing concrete pavement, asphalt or concrete drives and sidewalks shall be initiated with full depth saw cuts, exercising extreme care to avoid surface breaks and spalling. If surface breaks or spalling occur, additional removal and replacement shall be made at the contractor's expense. The cost of saw cuts shall be considered incidental to the cost of construction.

1.2.15 Special care shall be taken forming at intersections so that the profiles and grades obtained are as shown on the plans and grade sheets. Short lengths of forms or flexible forms may be necessary at these locations.

1.2.16 All concrete shall utilize a SUDAS C-4 mix design and have a compressive strength of 3,500 psi at 14 days and 4,000 psi at 28 days.

1.2.17 The contractor shall notify the engineer immediately if any discrepancies are encountered between the plans and specifications and the existing filed conditions. Work warranting a change in scope shall be submitted to the KO/COR within 30 days of notice or the contractor will forfeit rights to compensation for the work.

5 | P a g e

1.2.18 Pumping ground water and/or storm water from open trenches shall be considered incidental to the contract.

1.2.19 Construction staking shall be the responsibility of the contractor. The contractor and survey crew and company shall be considered competent and responsible for reporting any discrepancies or unforeseen project errors before and during construction staking to ensure blunders and misinformation is not constructed in the field. If an apparent error in the design is discovered during construction staking of the project, the contractor and or survey crew and company shall cease construction and report it to KO/COR immediately so the error may be corrected as soon as possible. Any lost work time, labor or equipment fee will not be paid during work stoppage due to unforeseen error.

1.2.20 All existing storm and sanitary information shall be considered a reference and is the responsibility of the contractor verify in the field prior to construction.

1.2.21 The contracting authority reserves the right to keep any/all removed material that includes but is not limited to manholes and storm sewer pipe. If the contracting authority elects not to keep removed material, the material becomes the property of the contractor and is responsible for the disposal/removal from the project.

1.2.22 No overhaul on this project.

1.2.23 Do not damage or disturb any trees on this project.

1.2.24 The contractor shall submit a Storm Water Pollution Prevention Plan (SWPPP) to the KO/COR or project engineer, prior to the commencing of the project.

1.2.25 The contractor shall provide all labor, equipment and material required to execute the SWPPP.

1.3 BASE BID

The Base Bid consists of providing all labor and materials construct the roundabout and adjacent roadway corridors including East 2nd Street and Le Claire Street. Work includes, but is not limited to, removing the existing pavement, grading, construction of the new roadway and roundabout as identified in the attached plan set in Appendix “A”. This project shall be a working day contract. The contractor is allowed 100 working days to complete the project. The definition of a working day is defined in the SUDAS Specifications 1080. Failure in completing the project in the allotted 160 working days will result in a deduction at the liquidated damages rate of $1,000.00 (one thousand dollars) per working day until the project is completed.

1.4 ROUNDABOUT, STREET AND SIDEWALK CONSTRUCTION

1.4.1 Install 9” Portland concrete cement (P.C.C.) pavement with 12” modified subbase on geo grid type 2, steel reinforcement with a 30” curb & gutter on East 2nd Street, Le Claire Street and the proposed roundabout.

1.4.2 Place a 6” P.C.C. sidewalk with 6”x6” welded wire fabric (WWF) on 6” modified subbase along East 2nd Street and Le Claire Street.

1.4.3 Place a 6” P.C.C. pavement, red, brick stamped street scape sidewalk with 6”x6” WWF on 6” of modified subbase along East 2nd Street. See sheet D.03 in Appendix “A” for location details.

6 | P a g e

1.4.4 Place 9” P.C.C. red pavement on 12” modified subbase on geo grid type 2 at splitter islands located on East 2nd Street and Le Claire Street. See sheets D.03 and D.05 for specific locations.

1.4.5 Place 6” P.C.C. red pavement with 6”x6” WWF on 6” modified subbase on geo grid type 2 at the center island of the roundabout. See sheet D.04 in Appendix “A” for more details.

1.4.6 Place 6” of compacted gravel along Le Claire Street at locations defined on sheet D.05 in Appendix “A”.

1.4.7 Relocate the existing “ARMY” sign along East 2nd Street. The relocation includes demolishing and removing the existing foundation, constructing a new foundation, and re-erecting the existing sign.

1.4.8 The contractor shall coordinate sidewalk replacement with local businesses to minimize disruptions.

1.4.9 Remove and replace the existing tree box grates.

1.4.10 Adjust existing utility valves to finish grade.

1.4.11 Adjust sanitary manholes to finish grade.

1.4.12 Place pavement markings according to the “D sheets” in Appendix “A”.

1.5 DRAWINGS:

1.5.1 The design plans for this project are attached to this Statement of Work in

Appendix “A”.

1.6 SPECIFICATIONS

1.6.1 The contractor shall perform all work in accordance with the 2023 version of the Iowa State Urban Design and Specifications Program (SUDAS). The specifications can be found at the following website https://iowasudas.org/manuals/specifications-manual/. The contractor shall also follow the submittal procedures laid out in Appendix B.

1.6.2 All traffic control shall be in accordance with the Federal Highway Administration’s (FHWA) Manual on Uniform Traffic Control Devices (2009 with Rev 1 and 2) (MUTCD).

1.6.3 Notify the KO/COR immediately in writing if there is a discrepancy between the specifications and the referenced codes. If the Contractor fails to notify the KO/COR regarding conflicts within these documents, the more stringent requirements shall apply as determined by the KO/COR.

1.6.4 Place pavement markings according to the Iowa DOT Standard Road Plan PM- 110 Line types.

1.6.5 The new “ARMY” sign foundation shall be constructed according to the initial installation. The initial plans and specifications can be found in Appendix “C”.

1.6.6 The proposed tree grates shall be installed according to the manufacture’s recommendations.

1.6.7 A supplemental specification for Pavements that require red dye and or stamping or both can be found in Appendix “B” https://iowasudas.org/manuals/specifications-manual/

7 | P a g e

1.7 EXISTING CONDITIONS:

1.7.1 The existing roadway is a combination of concrete and asphalt that is in failed or failing condition.

1.7.2 SUBMITTALS

1.7.2.1 Copy of On-Site SWPPP Binder

1.7.2.2 Hot mix asphalt mix design

1.7.2.3 Shop Drawings

1.7.2.4 The contractor shall submit all items listed in part 2 of each section defined in the

SUDAS Standard Specifications pertaining to this project. This includes but is not limited to rock and pavement.

1.7.2.5 Safety Submittals

1.7.2.6 Form 1354 -Real Property Acceptance

1.7.2.7 Environmental Submittals

1.7.2.8 Construction Schedule

1.7.2.9 Construction Phasing Plan

2. PART TWO: GENERAL INFORMATION

2.1 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK:

2.1.1 The Contractor shall be required to (a) commence physical work under this contract within 45 working days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 160 days working days after receipt of the notice to proceed. Contractor submission of all closeout documentation is also included within this timeline. The time stated for completion shall include final cleanup of the premises.

2.2 SPECIAL CONDITIONS:

2.2.1 Staging Area: The construction area may be used as a staging area. Any additional staging area requires coordination with the KO/COR.

2.2.2 Construction Schedule and Closure Periods: The Construction Schedule shall be submitted to the KO/COR for approval in accordance with the SOW.

2.2.3 Access and Working Hours: Standard work hours for this project are 5:30 am on

Monday to 5:00 pm on Friday. The contractor’s schedule may deviate from these hours when approved by the KO/COR. The Federal Holidays are: New Year’s Day, January 1; Martin Luther King Day, 3rd Monday in January; President’s Day, 3rd Monday in February, Memorial Day, last Monday in May; Juneteenth, June 19; Independence Day, July 4; Labor Day, 1st Monday in September;

Columbus Day, 2nd Monday in October; Veteran’s Day, November 11, Thanksgiving Day, 4th Thursday in November; Christmas Day, December 25. If a holiday falls on Saturday, the preceding Friday is a holiday. If a holiday falls on Sunday, the following Monday is a holiday.

2.2.4 Miscellaneous: All site condition information provided by the Government shall be field verified by the contractor.

8 | P a g e

3.1 PART THREE: SECURITY

3.1.1 OPERATIONS SECURITY (OPSEC) REVIEW: In order to perform the project the contractor must do the following:

3.1.2 AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include sub-contractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and sub-contractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and sub-contractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil

3.1.3 Access and general protection/security policy and procedures. This standard language is for contractor employees with an area of performance within Army controlled installation, facility, or area. Contractor and all associated sub-contractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.

Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

3.1.4 For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with inquiries (NAC) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

3.1.5 For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractor employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable

9 | P a g e installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

3.1.6 AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language required U.S. based contractor employees and associated sub-contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525-13.

Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact.

3.1.7 iWATCH Training. This standard language is for contractor employees with an area of performance within and Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 5 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.

3.1.8 Army Training Certification Tracking System (ATCTS) registration for contractor employees who require access to government information systems. All contractor employees with access to a government information system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DoD Information Assurance Awareness training prior to access to the IS and then annually thereafter.

3.1.9 For contracts that require a formal OPSEC program. The contractor shall develop an OPSEC Standing Operating Procedure (SOP)/Plan within 90 calendar days of contract award, to be reviewed and approved by the responsible Government OPSEC officer. This plan will include a process to identify critical information, where it is located, who is responsible for it, how to protect it and why it needs to be protected. The contractor shall implement OPSEC measures as ordered by the commander. In addition, the contractor shall have an identified certified Level II OPSEC coordinator per AR 530-1.

3.1.10 For contracts that require OPSEC Training. Per AR 530-1 Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter.

3.1.11 For information assurance (IA)/information technology (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD IA training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoD 8570.01, DoD 8570.01-M and AR 25-2 within six months of appointment to IA/IT functions.

10 | P a g e

3.1.12 For information assurance (IA)/information technology (IT) certification. Per DoD 8570.01-M, DFARS 252.239.7001 and AR 25-2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award.

The baseline certification as stipulated in DoD 8570-.01-M must be completed upon contract award.

3.1.13 For contractors authorized to accompany the force. DFARS Clause 252.225- 7040, Contractor Personnel Authorized to Accompany U.S. Armed Forces Deployed Outside the United States. The clause shall be used in solicitations and contracts that authorize contractor personnel to accompany U.S. Armed Forces deployed outside the U.S. in contingency operations; humanitarian or peacekeeping operations; or other military operations or exercises, when designated by the combatant commander. The clause discusses the following AT/OPSEC related topics: required compliance with laws and regulations, pre-deployment requirements, required training (per combatant command guidance), and personnel data required.

3.1.14 For Contract Requiring Performance or Delivery in a Foreign Country.

DFARS Clause 252.225-7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and noncontingency support. The key AT requirement is for non-local national contractor personnel to comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task force commander policies and directives.

3.1.15 For contracts that require handling or access to classified information.

Contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified "Confidential", "Secret", or "Top Secret" and requires contractors to comply with (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M); (2) any revisions to DOD 5220.22-M, notice of which has been furnished to the contractor.

3.1.16 Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.

3.1.17 For contracts that require delivery of food and water. This standard language is for contractor employees with an area of performance delivering food and water within an Army-controlled installation, facility or area. The supplies delivered under this contract shall be transported in delivery conveyances maintained to prevent tampering with and/or adulteration or contamination of the supplies, and if applicable, equipped to maintain a prescribed temperature. All delivery vehicles will also be subject to inspection at all times and all places by the Contracting Officers Representative, Post Veterinarian, and/or Law Enforcement Officials.

When the sanitary conditions of the delivery conveyance have led, or may lead to product contamination, adulteration, constitute a health hazard, the delivery conveyance is not equipped to maintain prescribed temperatures or the transport

11 | P a g e results in product "unfit for intended purpose", supplies tendered for acceptance may be rejected without further inspection. As the holder of a contact with the Department of Defense, it is incumbent upon the awardee to insure that all products and/or packaging have not been tampered with or contaminated.

Delivery conveyances will be locked or sealed at all times, except when actively loading or unloading. Unsecured vehicles will not be left unattended. All incoming truck drivers will provide adequate identification upon request. In the event of an identified threat to an installation, or a heightened force protection/Homeland Security threat Level, the contractor may be required to adjust delivery routes to minimize vulnerability risks and enable direct delivery to DOD facilities.

4 PART FOUR: ROCK ISLAND ARSENAL SUPPLEMENTAL GUIDANCE

4.1 SAFETY REQUIREMENTS:

4.1.1 Contractor shall comply with Engineering Manual EM-385-1-1 “Safety and

Health Requirements Manual”.

4.1.2 Contractor shall designate a Site Safety and Health Officer (SSHO) in accordance with EM 385-1-1, Section 01.A.17. SSHO shall also be responsible to coordinate contract employees in the event of an emergency.

4.1.3 The following safety submittals are required prior to performing work:

4.1.3.1 Accident Prevention Plan (APP) (EM 385-1-1, Section 01.A.12)

4.1.3.2 Activity Hazard Analysis (AHA) (EM 385-1-1, Section 01.A.15)

4.1.3.3 Emergency Plan (EM 385-1-1, Section 01.E)

4.1.3.4 Supplemental plans in accordance with EM 385-1-1 shall be required as dictated by the types of work being performed (e.g. Hazardous Energy Control Program, Hot Work, Hazardous Material Abatement)

4.1.4 The Contractor shall adhere to the most current requirements of NFPA 241, EM 385-1-1 and local Fire Department requirements as supplemented below. If a conflict between requirements occurs the most stringent shall apply.

4.1.4.1 Fires, regardless of size, will be reported to the fire department.

4.1.4.2 Contractor storage areas in RIA buildings shall be inspected and approved by the

RIA Fire Department prior to use.

4.1.4.3 Extinguishers for hot work shall be a minimum of 10 lb. ABC Type (UL Rating

4A:80B:C). Building extinguishers shall not be used to meet this requirement.

4.1.4.4 Contractors shall provide flameproof tarps or shields to protect combustible material during hot work.

4.1.4.5 Tar kettles shall not be located any closer than 20 feet to any building or 100 feet to an ammunition/explosive storage area.

4.1.4.6 The Contractor shall make requests in writing to the KO/COR no less than two weeks in advance for approval to connect to a fire hydrant. The contractor is responsible for installing the water meter/back flow preventer and providing their own hose, hose connections, and hydrant wrenches for opening/closing fire hydrants. The Contractor shall not use pipe wrenches, channel locks, etc. for opening/closing of fire hydrants.

12 | P a g e

4.1.5 Contractor shall comply with all emergency communication instructions provided through official channels to include the outdoor speaker system, building notification systems, direction by emergency service personnel, or the

KO/COR.

4.1.5.1 Upon award, the Government will provide further information regarding building points of contact, areas of refuge, and access restrictions.

4.1.5.2 Contractor vehicles and/or equipment shall not block fire department access, hose connections, alarm panels, access roads, fire hydrants, building safety features, etc. without prior approval. Requests shall be made in writing 30 days prior to the request and shall include proposed length of closure.

4.1.5.3 Contractor shall adhere to and follow safety policy as written in the latest editions of the National Electrical Safety Code and National Electrical Code.

4.2 ENVIRONMENTAL PROTECTION:

The Contractor shall follow all environmental requirements in accordance with this

SOW.

4.2.1 Compliance with Environmental Laws and Regulations: Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of- Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).

4.2.2 Compliance with Green Procurement Requirements: Contractor shall follow Federal EPA Comprehensive Procurement guidelines (www.epa.gov/cpg) and Army Contracting Command Quick Guide (https://acc.aep.army.mil/accapps/ACCMAP/Documents/Quick-Guide-for- Sustainable-Procurement.docx) for acquisition of building materials and products and select materials that have a long life cycle; the least toxic materials;

recyclable materials; materials that are resource-efficient; materials with the maximum recycled content; materials harvested on a sustained yield basis; and products causing the least pollution during their manufacture, use, and reuse.

4.2.3 Compliance with License and Certification Requirements: Contractor shall obtain all licenses and certifications required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.

4.2.4 Notification of Federal and State Regulators: Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival

13 | P a g e on site of any Federal, State, and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from a Federal or State environmental agency.

4.2.5 Inspections of Work Sites: Contractor shall submit to potential Federal, State, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.

4.2.6 Reporting Noncompliance: Contractor shall immediately report any nonconformance and/or noncompliance with applicable Federal, State or Local environmental laws, Army and installation environmental regulations or policies to the COR and DGR.

4.2.7 Verification of National Environmental Policy Act Documents. Contractor shall obtain from the COR or DGR a copy of the National Environmental Policy Act (NEPA) environmental analysis and/or status of the NEPA review done if analysis was not required. NEPA review and analysis is done in accordance with 32 CFR Part 651 and addresses actions to be taken by contractor prior to and during commencement of contract actions. The NEPA process consists of evaluating the environmental effects of a federal action including its alternatives.

There are three levels of analysis depending on whether or not the construction activity or project could significantly affect the environment. These three levels are: categorical exclusion determination; preparation of an environmental assessment/finding of no significant impact (EA/FONSI); and preparation of an

EIS.

4.2.8 Assignment of Environmental Compliance Designee (ECD): Contractor shall appoint an ECD for all contract work periods exceeding 180 consecutive days.

Contractor shall appoint a primary and alternate ECD for each production, shop or work area that uses and/or stores hazardous materials and/or generates hazardous wastes. Contractor ECDs shall monitor implementation of all environmental regulatory requirements, report all environmental noncompliance to the work site supervisor, correct all environmental noncompliance, and verify implementation of directed actions to correct identified environmental noncompliance. Contractor shall have at least one ECD on duty at all times at each shop or work area. Contractor shall require all personnel designated as ECDs to complete the initial ECD training through the installation within 15 days of the start of contract performance. Contractor personnel appointed as ECDs may perform other duties provided they do not prevent the performance of ECD duties. Contractors may request a waiver of this requirement through the COR and DGR, if using and/or storing very small quantities of hazardous materials.

14 | P a g e

4.2.9 Competency Training for Contractor Personnel: Contractor shall not allow personnel to perform any activities and/or tasks on installation without proper and adequate qualifications or job competency training. In the event of any identified noncompliance, the Contractor shall, if requested, provide proof of contract personnel training or qualification (individual name, training/qualification type, training/qualification certificate, and date of training/qualification) to perform those contract activities associated with the identified noncompliance.

4.2.10 Generation of Solid Waste: Contractor shall remove from the installation and dispose of all solid waste generated, which cannot be recycled to an approved and permitted off-post disposal facility.

- Contractor shall make every effort to divert construction, demolition debris, and all other solid waste to comply with the Army Integrated Solid Waste Management Policy.

- Prior to removing any waste from the installation for disposal, the Contractor shall coordinate with the installation Qualified Recycling Program (QRP) Manager, DGR, and COR to arrange for recyclable materials to be removed and diverted from the waste stream.

- Submit in writing the quantities of waste removed and recycled to the DGR and/or COR on a monthly basis. The submittal shall include the date of disposal/recycling, the disposal/recycling facility, the types of material disposed/recycled and the quantities of materials disposed/recycled by weight.

- The Contractor shall establish a program to promote cost-effective waste reduction in all operations and facilities covered by the contract. This includes collection, separation, and processing products or other materials recovered from solid waste streams for use in the form of raw materials.

- The Contractor shall make maximum effort to reduce and prevent waste.

4.2.11 Generation of Hazardous Waste: Contractor shall assign all hazardous waste management responsibilities to the appointed ECD. Contractor shall contact the DGR and/or COR to obtain technical assistance from the Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous waste storage and disposal requirements. Contractor shall properly profile all waste generated as part of this contract to determine if any waste is hazardous waste as defined by 40 CFR. Contractor shall accumulate hazardous waste prior to disposal shipment in a satellite accumulation point at or near the point of generation or in a lessthan-90-day site, in accordance with Federal, State, Army, and installation regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement or Status- of-Forces Agreement. The Contractor shall properly package the hazardous waste and complete the hazardous waste manifest, then take the manifest to DGR for approval and signature prior to removing any hazardous waste from the installation. Contractor shall contact DGR to obtain the installation’s hazardous waste EPA ID number for the hazardous waste manifest. The Contractor shall notify the DGR 24 hours prior to removing any hazardous waste from the installation. The

15 | P a g e contractor shall remove and dispose of manifested hazardous waste generated by contract activities from the installation to an approved off-post permitted hazardous waste disposal facility. The DGR shall assist contractors with profiling their waste upon request.

4.2.12 Use of Hazardous Materials: Contractor shall assign all hazardous materials management responsibilities to the appointed ECD. Contractor shall contact the DGR or COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list without prior written approval from DGR and/or COR.

4.2.13 Prevention of Storm Water Pollution: The Contractor shall perform, track, participate, implement, and comply with storm water pollution prevention minimum control measures, protocols, and best management practices (BMP) and ensure that water quality standards are not violated in accordance with all regulations and policies as applicable to the National Pollutant Discharge Elimination System (NPDES) general permit requirements.

- Applicable permits include:

1.) The General NPDES Permit for Storm Water Discharges from Industrial Activities (Iowa DNR – General Permit No. 2).

• Contractors will comply with the permit when the activity is identified as a permitted industrial activity.

BMPs include, but are not limited to:

• Practicing spill prevention and good housekeeping.

• Installing and managing erosion and sediment control.

2.) The General NPDES Permit for Storm Water Discharges from

Construction Site Activities. The minimum control measures for construction sites include, but are not limited to:

- Public Education and Outreach on Storm Water Impacts

- Public Involvement and Participation

- Illicit Discharge Detection and Elimination

- Construction Site Storm Water Run-off Control

16 | P a g e

- Post Construction Storm Water Management in New Development and Redevelopment

- Contractors will obtain permit coverage for construction activities disturbing over one acre of land (total acreage is cumulative across all portions of the project). Requirements include, but are not limited to:

Preparing and implementing a site-specific Storm

Water Pollution Prevention Plan (SWPPP) as outlined in the permit and prior to any soil disturbance.

Installing and managing erosion and sediment control.

Make available, upon request, permit associated documentation.

Practicing spill prevention and good housekeeping.

Schedule inspections and provide corrective actions for noted deficiencies.

4.2.14 Storm Water Management Low Impact Design/Development (LID):

The Contractor shall perform, track, participate, implement, and comply with Section 438 of the Energy Independence and Security Act; Executive Order 13514; and the DOA memorandum (2010) for full implementation of low impact design/development (LID) techniques to restore predevelopment hydrology to the maximum extent technically feasible for both new and renovation construction projects. In support of LID, Contractors will adhere to installation landscape codes and the guidance found in the Installation Design Guide concerning Low Impact Design/Development for storm water management. The following LID practices include, but are not limited to:

• Restoring predevelopment hydrology to the maximum extent technically feasible

• Promoting natural removal of pollutants such as nutrients, oil and grease, and sediments from storm water

• Managing rainfall at the point where it falls

• Meeting the requirements of the MS4 permit

• Important Note: Utilization of permanent retention/detention ponds is prohibited without authorization from the Installation Planning Division.

4.2.15 Use of Pesticides: Contractor shall submit the type and quantity of pesticides to be applied, the application purpose, and location to the DGR and COR for approval 10 working days prior to the initial application. The Contractor shall submit the actual quantities applied via DD1532, Pest Management Report, to the DGR and COR within 2 working days (48 hours) after each approved application. The Contractor shall utilize Integrated Pest Management (IPM) technology and procedures in strict compliance with all applicable Federal, State, Army, and installation

17 | P a g e regulations, to include the installation's Integrated Pest Management Plan and DODI 4150.07. Pesticide applicators shall be certified and licensed by the State of Illinois in the applicable pesticide application categories. The Contractor shall provide evidence of personnel licenses and certifications to the Contracting Officer and the DGR prior to the initial application of pesticides. Only those pesticides registered with the US Environmental Protection Agency (EPA) and approved by USAG-RIA Integrated Pest Management Coordinator shall be utilized, and then only in strict accordance with product labeling. The installation reserves the right to prohibit and limit the amount and type of pesticides used.

4.2.16 Protection of Work Site Resources: Contractor shall confine all activities to areas defined by the drawings and specifications. Prior to the beginning of any work, the Contractor shall identify any land resources to be preserved within the work area. Except in areas indicated on the drawings or specified to be cleared, the Contractor shall not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms. The Contractor shall provide effective protection for land and vegetative resources at all times. Prior to site clearing and grubbing, the Contractor shall coordinate harvesting of saleable timber with the DGR and/or COR. Contractor shall notify the DGR and/or COR if any trees are required to be disposed or removed. The Contractor is not authorized to remove or dispose of any tree greater than 6 inches in diameter unless permission has been granted in writing by the DGR or

COR.

4.2.17 Prevention of Spills: Contractor shall adopt the installation's Spill Prevention Control and Countermeasures Plan (SPCC) if transporting, processing, storing, or in any way managing hazardous waste, hazardous material, petroleum-oils- lubricants, or other restricted items. In case of a spill, the person in control of the spill site or their designated representative shall take appropriate action to protect workers and bystanders; contain the spill (if it can be done safely); secure the spill site; restrict ignition sources;

and immediately contact the installation Fire and Emergency Services (Fire Department).

4.2.18 Protection of Sensitive Areas: Contractor shall comply with all installation designated sensitive and/or off-limit area restrictions. Sensitive areas are generally demarked indicating what activities (e.g., driving, digging, foot traffic) are prohibited. The Contractor shall also adhere to the following installation sensitive areas requirements:

- 18.1. Cultural Resources Sites: Do not excavate, remove, damage, or otherwise deface any archeological resource located on public lands.

- 18.2 Endangered Species Habitats: Do not initiate any action that may disturb, endanger, or damage to any degree the habitat of a threatened or endangered species.

- 18.3 Wetlands: Do not excavate or take any action that could fill or damage any wetland unless working under a project specific Corps of

18 | P a g e

Engineers 404 permit. Wetlands include streams, riparian areas, bogs, marshes, and swamps.

4.2.19 Corrective Action for Noncompliance: Contractor shall when given a verbal and/or written notice of environmental noncompliance or nonconformance by the COR, take immediate corrective action. Failure or refusal to comply promptly may be grounds for the Contracting Officer to invoke the appropriate contractual remedies. This may cause all or part of the work to be stopped immediately until satisfactory corrective action has been taken.

4.2.20 Noise: Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or use of explosives will not be permitted without written permission from the Contracting Officer, and then only during the designated times. Pile-driving operations shall be coordinated through the DGR and COR.

4.2.21 Mercury: Mercury is prohibited, unless specified otherwise, and with the exception of mercury vapor lamps and fluorescent lamps. Dumping of mercury-containing materials and devices such as mercury vapor lamps, fluorescent lamps, and mercury switches, in rubbish containers is prohibited. Remove without breaking, pack to prevent breakage, and transport out of the activity in an unbroken condition for disposal as directed. Immediately report to the DGR and COR instances of breakage or mercury spillage. Clean mercury spill area to the satisfaction of the Contracting Officer. Cleanup of a mercury spill shall not be recycled and shall be managed as a hazardous waste for disposal.

4.2.22 Universal Waste / e-Waste Management: Universal…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .