Attachement 3 - Task Order One PWS.pdf

PDF 135 KB Posted

Attached to
WATER WASTE TREATMENT SERVICES FOR JACOB CREEK JCC
Solicitation number
1282A723Q0021
Issued by

View the file

Other files

File Type Posted
Attachment 1 - Wage Determination 2015-4339.pdf PDF
Attachment 2 - IDIQ Pricing Model.xlsx XLSX spreadsheet
Attachment 4 - Task Order pricing model.xlsx XLSX spreadsheet
1282A723Q0021 - IDIQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Jacobs Creek Job Corps Center Wastewater Hauling

Task Order One (1) SOW

Introduction The contractor shall provide all labor, material, equipment, and transportation to pump and haul excess influent to prevent overflow from the Jacobs Creek wastewater treatment plant. It is anticipated that hauling will be required daily and may require multiple trucks/trips to prevent overflow of the plant.

Period of Performance This task order is anticipated to include hauling needs from June 1, 2023, through July 31, 2024.

Background The wastewater treatment plant is a Titan Membrane Filtration plant. In a typical year, sludge must be periodically removed. During heavy rain events or when the membranes are undergoing routine cleaning, excess influent must be pumping and hauled to a municipal plant. Additionally, municipal waste may need to be hauled into the plant to provide seeding to allow the plant to operate more efficiently.

In November 2022, the plant experienced a total membrane failure and is currently non-operational. The average volume hauled since the plant failure has been 15,000 gallons per day. There will be higher than normal volumes until May 2023 while the plant is under repair. The center is continuing efforts to control infiltration and inflow into the sewer system; therefore, it is expected that the hauling requirements will decrease significantly by the fall of 2023, the anticipated volumes after repairs are made will be 10,000 gallons per month.

Location Jacobs Creek Job Corps Center 984 Denton Valley Road Bristol, TN 37620 Center Point of Contact: Anthony Colobro 423-217-6417 anthony.colobro@usda.gov Contracting Officer Representative: Deborah Valles 720-450-6191 deborah.valles@usda.gov

Technical Requirements All sludge and wastewater removed from the Center under this task order shall be disposed of by the contractor in accordance with Federal, State of Tennessee, and local regulations. For each truck load pumped, the contractor shall grab and provide a sample to the wastewater treatment operator to submit for State required testing.

The contractor shall provide copies of manifest from the location(s) at which the sludge is disposed at the time of invoicing.

On the day of completion of pumping, the contractor shall provide notification to the Contracting Officer's Representative by email reporting the number of gallons hauled. Designated Points of Contact at the Center will be allowed to schedule the pumping.

Deliverables

• Samples: For each truck load pumped, the contractor shall grab and provide a sample to the wastewater treatment operator to submit for State required testing.

• Volume reporting: On the day of completion of pumping, the contractor shall provide notification to the Contracting Officer's Representative by email reporting the number of gallons hauled.

• Manifests: The contractor shall provide copies of manifest from the location(s) at which the sludge is disposed at the time of invoicing.