Attachement 1 - Specifications.pdf
PDF 273 KB Posted
- Attached to
- Large Turntable Federal contract opportunity
- Solicitation number
- NB672050-21-00658
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ NB672050-21-00658.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Re qu ire m en ts
Sp ec ifi ca tio n Do cu m en t
Use this document to detail the specifications/requirements for an item and/or ancillary services.
TITLE: Large Turntable
Requesting Laboratory / Division / Group:
Communications Technology Laboratory Radio Frequency Technology Division Shared Spectrum Metrology (672.05)
General Statement of Need:
NIST requires a remote-controllable, freestanding rotating platform (turntable) to be placed on the floor surface of a reverberation chamber for testing wireless-enabled internet-of-things devices. The turntable platform shall be made of metal to minimize RF-energy loss in the chamber during a measurement. The turntable shall be capable of both stepped and continuous rotation operation.
Items and Ancillary Services:
Item 1: 1.5 m Metal-Platform Turntable Quantity: 1 Specifications: 1.1 Positioning accuracy of at least +/- 1 degree in stepped-rotation operation.
1.2 Remote-controllable over fiber-optic lines by an existing Maturo
NCD control unit.
1.3 Metal plate for low RF absorption.
1.4 Free-standing support for portable mounting on chamber floor.
1.5 Continuous-rotation operation shall cover the speeds ranging from 0.1 RPM to 2 RPM.
1.6 Turntable assembly capable of supporting loads up to 200 kg.
Item 2: Fiber-optic cable assembly to connect turntable to existing NIST
Maturo NCD controllers Quantity: 1 Specifications: 2.1 Appropriate connectors to mate to the turntable and the Maturo
NCD controller.
2.2 At least 9 m in length.
Service Requirements / Item Specifications:
Section Requirements/Specifications Planning Considerations ☒ N/A
☐ List any visits required to allow potential vendors to see site specific constraints.
[Explain requirements here.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)
☐ Vendor Representative On-Site more than three (3) days.
☐ Other Considerations:
[List other considerations to ensure an accurate quote.] Shipping & Delivery ☐ N/A
☐ FOB Shipping shall be included in this procurement request.
NIST-BOULDER
325 Broadway Boulder, CO 80301
Shipping Criteria:
☒ Partial Delivery Acceptable
[Enter Shipping and Delivery information by item here.] ☒ Direct Delivery to Building Required Building 1
Room 4080 Turntable will be too heavy to transport by researcher Pallet Jack may be required ☒ Building has Loading Dock
Containerization Preference: [Choose Container] Other Requirements: [List any other requirement here.] Delivery Date Criteria:
☐ Delivery of Goods, Installation, and Training shall be competed no later than: Click or tap to enter a date.
☐ Delivery No Earlier Than: Click or tap to enter a date.
☐ Other:
[List other shipping, delivery or special requirements here.] Electronic Media ☒ N/A
[Enter Electronic Media Requirements by item here.]
☐ Software ☐ Electronic Manuals
☐ License Key ☐ Other:
[List any other Electronic Media requirements here.] ☐ Email address for Software Delivery:
[Enter address here.] Installation ☒ N/A
[Enter Installation Requirements by item here.]
☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:
[Enter details here.] NOTE: When installation is required, TPOC or COR shall be the coordination point.
Facility / Utility Considerations ☒ N/A
[List Site Specific Utility Considerations by item here.] ☐ OFPM Work Order Numbers
[List any Work Order Numbers here.] ☐ Power Available Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:
[List any other power considerations here.] ☐ Utility Connections:
[List relevant available utilities, pressure(s) and flowrate(s) here.] ☐ Other Considerations:
[List other considerations to ensure an accurate quote.]
Warranty ☐ N/A
Base Manufacturer Warranty is acceptable
[If you require an Extended Manufacturer Warranty, describe the warranty requirements per item here.]
What is included?
☐ Labor ☒ Parts ☐ Travel ☐ Cost and Liability for Returns ☐ Other [Enter other requirements here] ☒ Warranty Length: 2 Years Training ☒ N/A
[Training Requirements (Who, When, What, Where here.] ☐ On-Site
Is Travel Required: [Choose Answer]
☐ Off-Site Location: [Enter Location(s) here] ☐ Number of Trainees: [Enter Number of Trainees here] Scope of Training ☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other [Enter Other Scope Requirements here] ☐ Training materials to be provided:
[Describe Requirements here] ☐ Other [Enter Other Training Requirements here] NOTE: When training is required, TPOC or COR shall be coordinator.
Inspection and Acceptance ☐ N/A
1. Visual inspection for damage.
2. Ensure control with existing Maturo controller through fiber-optic cable.
☐ On-Site
[Enter Inspection Requirements Per Item here] ☒ Planned Government Acceptance Testing: (7 Business Days) ☐ Government Acceptance Expected to Exceed 7 Business Days [Duration] ☐ Inspection and Acceptance Plan:
[Explain here] ☐ Other:
[Enter Other Requirements here] Maintenance [Describe Maintenance Requirements Per Item here]
☒ N/A Service Plan Length: [i.e. 3 - Years] What is Included?
☐ Labor ☐ Spare Parts ☐ Consumables ☐ Travel
☐ Cost and Liability for Returns ☐ Software Updates ☐ Manuals l
☐ Other [Enter Other Requirements here] ☐ Requirements:
[Enter Requirements here] (i.e.: On-Site Within 72 hours, etc.)
☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum) Government Furnished Material / Equipment ☒ N/A
[List Any Government Furnished Material / Equipment Per Item here] ☐ Samples for Testing
☐ Government Equipment which will leave Government Site (TPOC must coordinate with Division Property Custodian)
Description: [Enter Description here] Serial Number: [Enter Serial Number here]
NIST Property Number: [Enter NIST Property Number here] ☐ Other:
[Enter Other Details here] Travel ☒ N/A
[Describe any Travel Requirements Per Item here] ☐ Explain:
[Enter Justification / Requirement here] ☐ Other:
[Enter Other Requirements here] NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.
File details come from the government source that posted it. Updated .