Attachement 1 -Pricing List.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
NAPLES CHILLER REPLACEMENT Federal contract opportunity
Solicitation number
191T7026Q0032
Issued by
Department of State

About this file

This is a Pricing List template for the Naples Chiller Replacement solicitation issued by the Department of State for the U.S. Consulate General in Naples, Italy. The pricing list is organized into seven categories with 53 contract line items (CLINs) requiring vendor cost proposals in Euros.

The pricing structure encompasses: (A) Demolition and Removal Works—16 line items covering site preparation, removal of existing chiller units, condensers, pumps, piping, electrical systems, and flooring, totaling EUR 0; (B) Temporary Cooling/Heating for Service Continuity—3 items for temporary heat pump rental and installation, totaling EUR 0; (C) HVAC & Hydraulic Systems—13 items including reversible heat pumps, piping, buffer tanks, expansion vessels, valves, insulation, and system startup services, totaling EUR 0; (D) Electrical & Electronic—10 items covering LED lighting, circuit breakers, electrical cables, main electrical panel, network infrastructure, and BAS integration, totaling EUR 0; (E) Civil Works—8 items for screed, drainage, flooring, structural modifications, and painting, totaling EUR 0; (F) Safety Costs—1 item with a fixed EUR 10,000.00 price; and (G) Close-Out Documentation—2 items for shop drawings, as-built documentation, testing, and commissioning, totaling EUR 0. The overall total price shown is EUR 10,000.00, with all other cells highlighted in green requiring vendor completion. Vendors must fill only the designated green cells to provide their cost proposals for each CLIN.

View the file

Other files for this federal contract opportunity

Other files attached to NAPLES CHILLER REPLACEMENT, newest first.
File Type Posted
Questions and Answers.pdf PDF
Amendment no. 0001.pdf PDF
Attachment 5 - Drawings.pdf PDF
Attachment 3 - Technical Specifications.pdf PDF
Attachment 2 - Statement of Work.pdf PDF
SF 1449.pdf PDF
Prospective Offerors Cover Letter.pdf PDF
Attachment 4 - Photographic Report.pdf PDF
RFQ 191T7026Q0032.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN

CLINDescriptionUnitQuantityTotalPlease fill out ONLY the cells highlighted in GREEN.
A. DEMOLITION AND REMOVAL WORKS
1Site preparation fencing and protection measuresLS1€ - 0
2Removal and storage of furnitureLS1€ - 0
3Protection of existing finishesLS1€ - 0
4Draining and recovery of R407c refrigerantLS1€ - 0
5Disconnection and removal of existing chiller unitLS1€ - 0
6Removal of two remote condensersLS1€ - 0
7Removal of primary pumpsLS1€ - 0
8Removal of existing refrigerant and hydraulic piping valves and instrumentationLS1€ - 0
9Removal of expansion vessels and buffer tanksLS1€ - 0
10Authorized disposal and recycling certificationLS1€ - 0
11Removal of existing electrical panel and all circuitsLS1€ - 0
12Removal of wiring from concealed and exposed conduitsLS1€ - 0
13Dismantling of obsolete cable conduitsLS1€ - 0
14Demolition of existing flooring and raised platformsLS1€ - 0
15Core drilling for hydraulic pipes horizontal and verticalLS1€ - 0
16Core drilling for electrical cable ductsLS1€ - 0
SUBTOTAL DEMOLITION WORKS€ - 0
B. TEMPORARY COOLING/HEATING (Service Continuity)
17Temporary rental heat pump (incl. delivery & return)LS1€ - 0
18Install/connect temp HP: temporary piping, manifolds, hosesLS1€ - 0
19Temporary power: cable from chiller breaker to MDP + connectionsLS1€ - 0
SUBTOTAL TEMPORARY COOLING/HEATING€ - 0
C. HVAC & HYDRAULIC
20Reversible heat pumps with accessoriesNo2€ - 0
21Carbon steel piping PN16 including fittings welding supportsLS1€ - 0
22Vertical stainless steel buffer tanks 1500L with insulationNo2€ - 0
23Pressurized membrane expansion vessels 400L PN16No2€ - 0
24Gate valves ball valves check valves strainers complete setLS1€ - 0
25Thermometers 0-90C Class 1LS1€ - 0
26Pressure gauges 0-6 bar Class 1LS1€ - 0
27Flexible closed-cell insulation AF/Armaflex Class 0 with MicrobanLS1€ - 0
28Aluminum finishing for insulation 6/10mmLS1€ - 0
29Automatic filling valve with backflow preventer BA typeNo1€ - 0
30Steel magnetic dirt separator DN 80 PN 16 with insulationNo1€ - 0
31System preparation filling with anti-corrosive additiveLS1€ - 0
32Initial startup by authorized service center with 4-hour trainingLS1€ - 0
SUBTOTAL HVAC & HYDRAULIC€ - 0
D. ELECTRICAL & ELECTRONIC
33LED lighting fixtures replacement in chiller roomNo4€ - 0
34Molded-case circuit breaker with GFCI 4P 320A adjustable IdnLS1€ - 0
35Electrical cable FG16OM16 0.6/1kV 4x(1x185)+1G95LS1€ - 0
36New main electrical panel 1931x920x437mm complete with devicesNo1€ - 0
37Electrical cables FG16OM16 various sizesLS1€ - 0
38Shielded RS485 data transmission lines with terminationsLS1€ - 0
39Shielded CAT6 data transmission linesLS1€ - 0
408-port network switch in dedicated panelNo1€ - 0
41BAS integration by SCHNEIDER ELECTRIC authorized technicianLS1€ - 0
42Cable conduits supports and accessoriesLS1€ - 0
SUBTOTAL ELECTRICAL & ELECTRONIC€ - 0
E. CIVIL WORKS
43New screed sloped (min 1%) toward the drainLS1€ - 0
44New p-trapped drainLS1€ - 0
45New porcelain stoneware tiles R11 slip resistanceLS1€ - 0
46Fastening and anchoring of pipes ducts and equipmentLS1€ - 0
47Modification of existing steel structures for heat pump installationLS1€ - 0
48Beam treatment paint removal rust removal anti-corrosive coatingLS1€ - 0
49Skim coating and complete painting of chiller room including ceilingLS1€ - 0
50Daily and final professional cleaningLS1€ - 0
SUBTOTAL CIVIL WORKS€ - 0
F. SAFETY
51Safety CostsLS1€ 10,000.00
G. CLOSE OUT DOCUMENTATION
52Shop drawings and as-built documentationLS1€ - 0
53Testing and commissioningLS1€ - 0
SUBTOTAL SAFETY & DOCUMENTATION€ - 0
TOTAL PRICE FROM CLIN A TO G€ 10,000.00