Attachement 1 -Pricing List.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- NAPLES CHILLER REPLACEMENT Federal contract opportunity
- Solicitation number
- 191T7026Q0032
- Issued by
- Department of State
About this file
This is a Pricing List template for the Naples Chiller Replacement solicitation issued by the Department of State for the U.S. Consulate General in Naples, Italy. The pricing list is organized into seven categories with 53 contract line items (CLINs) requiring vendor cost proposals in Euros.
The pricing structure encompasses: (A) Demolition and Removal Works—16 line items covering site preparation, removal of existing chiller units, condensers, pumps, piping, electrical systems, and flooring, totaling EUR 0; (B) Temporary Cooling/Heating for Service Continuity—3 items for temporary heat pump rental and installation, totaling EUR 0; (C) HVAC & Hydraulic Systems—13 items including reversible heat pumps, piping, buffer tanks, expansion vessels, valves, insulation, and system startup services, totaling EUR 0; (D) Electrical & Electronic—10 items covering LED lighting, circuit breakers, electrical cables, main electrical panel, network infrastructure, and BAS integration, totaling EUR 0; (E) Civil Works—8 items for screed, drainage, flooring, structural modifications, and painting, totaling EUR 0; (F) Safety Costs—1 item with a fixed EUR 10,000.00 price; and (G) Close-Out Documentation—2 items for shop drawings, as-built documentation, testing, and commissioning, totaling EUR 0. The overall total price shown is EUR 10,000.00, with all other cells highlighted in green requiring vendor completion. Vendors must fill only the designated green cells to provide their cost proposals for each CLIN.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers.pdf | ||
| Amendment no. 0001.pdf | ||
| Attachment 5 - Drawings.pdf | ||
| Attachment 3 - Technical Specifications.pdf | ||
| Attachment 2 - Statement of Work.pdf | ||
| SF 1449.pdf | ||
| Prospective Offerors Cover Letter.pdf | ||
| Attachment 4 - Photographic Report.pdf | ||
| RFQ 191T7026Q0032.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN
| CLIN | Description | Unit | Quantity | Total | Please fill out ONLY the cells highlighted in GREEN. |
| A. DEMOLITION AND REMOVAL WORKS | |||||
| 1 | Site preparation fencing and protection measures | LS | 1 | € - 0 | |
| 2 | Removal and storage of furniture | LS | 1 | € - 0 | |
| 3 | Protection of existing finishes | LS | 1 | € - 0 | |
| 4 | Draining and recovery of R407c refrigerant | LS | 1 | € - 0 | |
| 5 | Disconnection and removal of existing chiller unit | LS | 1 | € - 0 | |
| 6 | Removal of two remote condensers | LS | 1 | € - 0 | |
| 7 | Removal of primary pumps | LS | 1 | € - 0 | |
| 8 | Removal of existing refrigerant and hydraulic piping valves and instrumentation | LS | 1 | € - 0 | |
| 9 | Removal of expansion vessels and buffer tanks | LS | 1 | € - 0 | |
| 10 | Authorized disposal and recycling certification | LS | 1 | € - 0 | |
| 11 | Removal of existing electrical panel and all circuits | LS | 1 | € - 0 | |
| 12 | Removal of wiring from concealed and exposed conduits | LS | 1 | € - 0 | |
| 13 | Dismantling of obsolete cable conduits | LS | 1 | € - 0 | |
| 14 | Demolition of existing flooring and raised platforms | LS | 1 | € - 0 | |
| 15 | Core drilling for hydraulic pipes horizontal and vertical | LS | 1 | € - 0 | |
| 16 | Core drilling for electrical cable ducts | LS | 1 | € - 0 | |
| SUBTOTAL DEMOLITION WORKS | € - 0 | ||||
| B. TEMPORARY COOLING/HEATING (Service Continuity) | |||||
| 17 | Temporary rental heat pump (incl. delivery & return) | LS | 1 | € - 0 | |
| 18 | Install/connect temp HP: temporary piping, manifolds, hoses | LS | 1 | € - 0 | |
| 19 | Temporary power: cable from chiller breaker to MDP + connections | LS | 1 | € - 0 | |
| SUBTOTAL TEMPORARY COOLING/HEATING | € - 0 | ||||
| C. HVAC & HYDRAULIC | |||||
| 20 | Reversible heat pumps with accessories | No | 2 | € - 0 | |
| 21 | Carbon steel piping PN16 including fittings welding supports | LS | 1 | € - 0 | |
| 22 | Vertical stainless steel buffer tanks 1500L with insulation | No | 2 | € - 0 | |
| 23 | Pressurized membrane expansion vessels 400L PN16 | No | 2 | € - 0 | |
| 24 | Gate valves ball valves check valves strainers complete set | LS | 1 | € - 0 | |
| 25 | Thermometers 0-90C Class 1 | LS | 1 | € - 0 | |
| 26 | Pressure gauges 0-6 bar Class 1 | LS | 1 | € - 0 | |
| 27 | Flexible closed-cell insulation AF/Armaflex Class 0 with Microban | LS | 1 | € - 0 | |
| 28 | Aluminum finishing for insulation 6/10mm | LS | 1 | € - 0 | |
| 29 | Automatic filling valve with backflow preventer BA type | No | 1 | € - 0 | |
| 30 | Steel magnetic dirt separator DN 80 PN 16 with insulation | No | 1 | € - 0 | |
| 31 | System preparation filling with anti-corrosive additive | LS | 1 | € - 0 | |
| 32 | Initial startup by authorized service center with 4-hour training | LS | 1 | € - 0 | |
| SUBTOTAL HVAC & HYDRAULIC | € - 0 | ||||
| D. ELECTRICAL & ELECTRONIC | |||||
| 33 | LED lighting fixtures replacement in chiller room | No | 4 | € - 0 | |
| 34 | Molded-case circuit breaker with GFCI 4P 320A adjustable Idn | LS | 1 | € - 0 | |
| 35 | Electrical cable FG16OM16 0.6/1kV 4x(1x185)+1G95 | LS | 1 | € - 0 | |
| 36 | New main electrical panel 1931x920x437mm complete with devices | No | 1 | € - 0 | |
| 37 | Electrical cables FG16OM16 various sizes | LS | 1 | € - 0 | |
| 38 | Shielded RS485 data transmission lines with terminations | LS | 1 | € - 0 | |
| 39 | Shielded CAT6 data transmission lines | LS | 1 | € - 0 | |
| 40 | 8-port network switch in dedicated panel | No | 1 | € - 0 | |
| 41 | BAS integration by SCHNEIDER ELECTRIC authorized technician | LS | 1 | € - 0 | |
| 42 | Cable conduits supports and accessories | LS | 1 | € - 0 | |
| SUBTOTAL ELECTRICAL & ELECTRONIC | € - 0 | ||||
| E. CIVIL WORKS | |||||
| 43 | New screed sloped (min 1%) toward the drain | LS | 1 | € - 0 | |
| 44 | New p-trapped drain | LS | 1 | € - 0 | |
| 45 | New porcelain stoneware tiles R11 slip resistance | LS | 1 | € - 0 | |
| 46 | Fastening and anchoring of pipes ducts and equipment | LS | 1 | € - 0 | |
| 47 | Modification of existing steel structures for heat pump installation | LS | 1 | € - 0 | |
| 48 | Beam treatment paint removal rust removal anti-corrosive coating | LS | 1 | € - 0 | |
| 49 | Skim coating and complete painting of chiller room including ceiling | LS | 1 | € - 0 | |
| 50 | Daily and final professional cleaning | LS | 1 | € - 0 | |
| SUBTOTAL CIVIL WORKS | € - 0 | ||||
| F. SAFETY | |||||
| 51 | Safety Costs | LS | 1 | € 10,000.00 | |
| G. CLOSE OUT DOCUMENTATION | |||||
| 52 | Shop drawings and as-built documentation | LS | 1 | € - 0 | |
| 53 | Testing and commissioning | LS | 1 | € - 0 | |
| SUBTOTAL SAFETY & DOCUMENTATION | € - 0 | ||||
| TOTAL PRICE FROM CLIN A TO G | € 10,000.00 |