This attachment requests approval for the use of prohibited materials on an Army contract for the M870A4 Semitrailer Lowbed, Construction Equipment Transporter. The contractor must provide details on the prohibited materials, associated health hazards, alternatives considered, technical justification for use, program risks if denied, and a get well plan to integrate alternatives. The government environmental and safety representatives will then evaluate the request and make a recommendation, requiring concurrence from the chief engineer and approval from the project manager. If approved, the contractor may use prohibited materials as described on 360 semitrailers to be produced over three years under contract number W56HZV-21-R-0149, awarded as a fixed price IDIQ to Schutt Industries, with an initial delivery order of 10 semitrailers due 390 days after award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| attach1.docx | DOCX document | |
| W56HZV21R0149.pdf | ||
| attach9.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
Attachment 0006 – Request for Use of Prohibited Material
Attachment 0006 Request for Use of Prohibited Material Distribution Statement A – Approved for Public Release; distribution unlimited
(*Distribution Statement A only applies when form is not filled in. Once filled check the [Program] Security Class Guide for proper distribution statement/markings)
1. General Information
Requesting Company
Date of Request
Point of Contact
Prohibited material for which waiver is requested
2. Explanation of Use
Instructions: Provide a description of the parts/processes where the prohibited material will be used. Identify all components/parts which will contain the prohibited materials upon vehicle delivery including quantities of these parts. Indicate the specific variant and/or trailer the components/parts are on. Identify whether or not the material will be required for operation or maintenance (including during vehicle rebuild). A separate spreadsheet may be attached listing the specific parts/processes, if needed.
3. Health Hazard
Instructions: Provide an explanation of any health hazards associated with the use or presence of the prohibited material. Include likely routes of exposure to both the operator and the maintainer. Identify if any personal protective equipment (PPE) that would be required as a result of using this material. Include the type of PPE and under what circumstances it would be required (manufacturing, operation, maintenance, etc.).
4. Analysis of Alternatives
Instructions: Identify all alternative which were considered for the prohibited material. If the alternative is only for specific applications, identify what type of parts it is a potential alternative for.
5. Technical Justification
Instructions: Provide technical justification for the use of prohibited material. Explain why it is necessary and why it cannot be eliminated. Note cost, schedule, and use of non-developmental items (NDI) are not technical justifications.
6. Program Risk
Instructions: Describe the program risk(s) (cost, schedule, and performance) associated with denial of this request by the Government.
7. Get Well Plan
Instructions: Identify which parts where an alternative may be integrated at a later date. Provide a get well plan explaining how this will be accomplished. Also, indicate which parts you will not be able to eliminate and provide a brief explanation.
The following Sections will be filled in by the Government
8. Environmental Safety and Occupational Health Representative Evaluation/ Recommendation
Instructions: Government ESOH Representative to provide evaluation of the above information and a recommendation to the Product Director/Project Manager regarding approval/disapproval of the prohibited material request.
ESOH Representative Date
9. Concurrence
I concur that use of {prohibited material} as described in this form under the {Contractor Name} Contract –{Contract Number} is acceptable and justified:
Chief/Lead Engineer Product Director
10. Approval
Upon the basis of the findings above, I hereby determine that use of {prohibited material} as identified in Section 2 of this form for the {Contractor Name} Contract {Contract Number} is acceptable and justified.
Project Manager
UNCLASSIFIED
File details come from the government source that posted it. Updated .