Performance Work Statement (PWS) JRD Vault Toilet Pumping
Contents Project Title General Information
1.0 Background and Purpose
Contractor Requirements
2.0 Technical Requirements / Tasks
3.0 Deliverable / Schedule
4.0 Performance Requirement Measures
Project Title JRD Toilet Vault Pumping
General Information
1.0 Background and Purpose
There are 29 vault toilets located throughout the Juneau Developed Recreation Area that require pumping every year. Locations include the Auke Village Campground, Lena Beach Recreation Area, West Glacier Trailhead, Skaters Cabin, Auke Recreation Area, and Mendenhall Campground. All vault toilets are accessible from the Juneau road system. The longest hose requirement is a 200-foot hose needed at Auke Recreation area for Vault Toilets 2 and 3). All 29 vault toilets are pumped in early October after the summer season. Six of these vaults are also pumped in May before the summer season due to the high use throughout the winter.
The contractor will need to coordinate with the Contracting Officer’s Representation (COR) for access.
Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies.
Contractor Requirements
2.0 Technical Requirements / Tasks
Task 1: Fall Pump Task 2: Spring Pump
Exhibit #1 – see Attachment #1 JRD Vault Toilet Locations Map
Location Vault Approx Size
Fall Pump Spring Pump
Auke Village Campground Vault Toilet 1 380 gallon X Auke Village Campground Vault Toilet 2 380 gallon X
Lena Beach Recreation Area Vault Toilet 1 380 gallon X Lena Beach Recreation Area Vault Toilet 2 380 gallon X Lena Beach Recreation Area Vault Toilet 3 380 gallon X
West Glacier Trailhead Vault Toilet 1 380 gallon X X West Glacier Trailhead Vault Toilet 2 380 gallon X West Glacier Trailhead Vault Toilet 3 380 gallon X West Glacier Trailhead Vault Toilet 4 380 gallon X West Glacier Trailhead Vault Toilet 5 380 gallon X West Glacier Trailhead Vault Toilet 6 380 gallon X X
Skaters Cabin Vault Toilet 1 380 gallon X X Skaters Cabin Vault Toilet 2 380 gallon X X
Auke Recreation Area (200-foot hose) Vault Toilet 1 380 gallon X Auke Recreation Area (200-foot hose) Vault Toilet 2 380 gallon X Auke Recreation Area Vault Toilet 3 380 gallon X Auke Recreation Area Vault Toilet 4 380 gallon X
Mendenhall Campground Vault Toilet 1 380 gallon X Mendenhall Campground Vault Toilet 2 380 gallon X Mendenhall Campground Vault Toilet 3 380 gallon X Mendenhall Campground Vault Toilet 4 380 gallon X Mendenhall Campground Vault Toilet 5 380 gallon X Mendenhall Campground Vault Toilet 6 380 gallon X Mendenhall Campground Vault Toilet 7 380 gallon X Mendenhall Campground Vault Toilet 8 380 gallon X Mendenhall Campground Vault Toilet 9 380 gallon X Mendenhall Campground Vault Toilet 10 380 gallon X Mendenhall Campground Vault Toilet 11 380 gallon X X Mendenhall Campground Vault Toilet 12 380 gallon X X
3.0 Deliverable / Schedule
Upon request pump all vault toilets. Coordinate with COR for any access to vault toilets.
Key Deliverables Item No. Deliverable Objective Due Task 1:
Fall Pump
Pump all toilets in Exhibit #1 marked for Fall Pumping
Upon request conduct pumping.
Fall Pumping shall not exceed maximum quantity per task order.
No later than seven (7) business days after requested from COR.
Task 2:
Spring Pump
Pump all toilets in Exhibit #1 marked for Spring Pumping
Upon request conduct pumping.
Spring Pumping shall not exceed maximum quantity per task order.
No later than seven (7) business days after requested from COR.
4.0 Performance Requirement Measures
Performance Objective
Required Task or Deliverable
Performance Standard Method of Surveillance
Positive/Negative Incentive % for NOT meeting the Task
Task 1 & 2 Upon request of COR provide pumping.
Vaults 99% empty.
Invoice shall state gallons pumped.
Visual inspection by COR at time of pumping.
If vaults not pumped within seven (7) business days contractor shall re-perform services.
| Project Title |
| General Information |
| 1.0 Background and Purpose |
| Contractor Requirements |
| 2.0 Technical Requirements / Tasks |
| 3.0 Deliverable / Schedule |
| 4.0 Performance Requirement Measures |