Attach. 1 – Statement of Work.pdf
PDF 2 MB Posted
- Attached to
- FY23 Fuel Pit water removal
- Solicitation number
- FA462023QA135
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 003 - SF30.pdf | ||
| Amend 002 - SF30.pdf | ||
| Amend 001 - SF30.pdf | ||
| Attach. 2 – SCA WD 2015-5537 Rev 19 27DEC22.pdf | ||
| 23QA135 - Combo.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) For
Removal of Contaminated Fuel Pit Water Fairchild AFB, WA
1. DESCRIPTION OF SERVICE: The contractor shall provide all necessary tools, equipment and materials required by law to provide for the removal of contaminated water from the flightline fuel pits and dispose of contaminated water currently contained in a government owned vacuum truck on Fairchild AFB, WA.
2. SCOPE OF WORK: The Contractor shall complete all work, which includes furnishing all supervision, labor, material, equipment and services, unless otherwise specified herein, required under this contract. All work shall be performed in accordance with all Federal, State, local laws and regulations, manufacturer’s recommendations and this Statement of Work (SOW).
- Contractor shall provide appropriate certified personnel to properly dispose of contaminated water from a fuel pit(s) containing approximately 7665 gallons of contaminated water until the fuel pits are dry and approximately 600 gallons of contaminated water contained within a government owned vacuum truck, see attachment 1.
- Contractor shall properly characterize and remove contaminated water and properly container and dispose off base in accordance with all local, state and federal environmental laws.
- Contractor shall develop a detailed work plan. This work plan shall consist of, as a minimum, the scope and location of work performed, location map of the worksite noting locations of water removal, photographs of the worksite, notification records, employee training records, and waste shipment records.
- Contractor shall removal any debris generated at the completion of work and will be removed from the installation and disposed at an off-base facility designated for the material.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: The government will provide access to utilities and flightline escort as needed.
4. GENERAL INFORMATION
4.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with the MSgt Daniel Rey and/or MSgt Julio Chavez at 509- 247-4258, daniel.rey@us.af.mil or julio.chavez.1@us.af.mil, 509-247-4255.
January 1 New Year’s Day 3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 18 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas
FA462023QA135
4.2. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations.
5. PERFORMANCE PERIOD: Project shall proceed immediately but not exceed 5 days after contract award.
6. ATTACHMENT:
Attachment 1: Installation location map and Location of Work Area
1260419532A Line
1260419532A Line
1260419532A Line
1260419532A Sticky Note Fuel Pit 23
1260419532A Sticky Note Fuel Pit 24
1260419532A Sticky Note Fuel Pit 22
1260419532A Sticky Note Fuel Pit 21
1260419532A Sticky Note Fuel Pit 20
1260419532A Line
1260419532A Line
1260419532A Line
1260419532A Line
1260419532A Line
1260419532A Line
1260419532A Sticky Note Fuel Pit 19
1260419532A Sticky Note Fuel Pit 18
1260419532A Sticky Note Fuel Pit 17
1260419532A Sticky Note Fuel Pit 16
1260419532A Sticky Note Fuel Pit 15
1260419532A Line
1260419532A Sticky Note Isolation Pit
Line
Line
1260419532A Sticky Note
LP 14T
1260419532A Line
1260419532A Sticky Note Fuel Pit 50
1260419532A Line
1260419532A Sticky Note Fuel Pit 51
1260419532A Line
1260419532A Sticky Note Fuel Pit 52
1260419532A Line
1260419532A Line
1260419532A Sticky Note Fuel Pit 54
1260419532A Line
1260419532A Sticky Note Fuel Pit 55
1260419532A Sticky Note Fuel Pit 60
1260419532A Line
1260419532A Sticky Note Fuel Pit 62
1260419532A Line
1260419532A Line
1260419532A Sticky Note Fuel Pit 63
1260419532A Line
1260419532A Sticky Note Fuel Pit 64
1260419532A Line
1260419532A Sticky Note Fuel Pit 65
1260419532A Line
1260419532A Sticky Note Fuel Pit 66
1260419532A Line
1260419532A Sticky Note Fuel Pit 53
1260419532A Sticky Note Fuel Pit 67
1260419532A Sticky Note Fuel Pit 56
1260419532A Line
1260419532A Line
1260419532A Sticky Note Fuel Pit 57
1260419532A Line
1260419532A Sticky Note Fuel Pit 58
1260419532A Sticky Note Fuel Pit 59
1260419532A Line
1260419532A Line
1260419532A Sticky Note Fuel Pit 60
1260419532A Line
1260419532A Sticky Note High Point 5
| Statement of Work - Contaminated Water Removal Updated |
| 4. GENERAL INFORMATION |
| 5. PERFORMANCE PERIOD: Project shall proceed immediately but not exceed 5 days after contract award. |
| 6. ATTACHMENT: |
| Attachment 1 - Locations Maps Updated - no points |
| Area A Map |
| Area B Map |