Attach 6 Self Performed Work Calc.docx

DOCX document 28 KB Posted

Attached to
STX Install Electrical Generator Fisher House
Solicitation number
36C25725B0007
Issued by

About this file

This document is instructions for calculating the percentage of self-performed work for a federal contract opportunity set aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The instructions outline the required calculations for determining the amount of work the SDVOSB prime contractor can subcontract to non-SDVOSB firms, based on the service type. For A/E services, the SDVOSB prime cannot subcontract more than 50% of the contract value, excluding materials. For general construction, the SDVOSB prime cannot subcontract more than 85% of the contract value, excluding materials. For special trade construction, the SDVOSB prime cannot subcontract more than 75% of the contract value, excluding materials.

The related federal contract opportunity is for installing a 200 kW electrical generator at the Fisher House for the Audie L. Murphy Hospital in San Antonio, Texas. The solicitation is set aside for 100% SDVOSBs under NAICS code 238210 with a size standard of $19 million. The period of performance is 180 days after the notice to proceed is issued, and the magnitude of construction is between $500,000 and $1,000,000.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A.4 OFFEROR’S SELF PERFORMED CALCULATIONS

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-75 Notice of Limitations on Subcontracting)

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Cost of Materials $ __________

c) Total excluding materials (a-b) $ __________

d) Amount projected to be paid to Non-VetCert listed SDVOSBs: $ __________ (not including materials)

e) Offeror’s percentage of estimated Non-VetCert work (d/c X 100 = %) __________%

f) Offeror’s percentage of estimated self-performed work (100 – e = %) __________%

A/E-Services. In the case of a contract for services (except construction), the SDVOSB prime contractor will not pay more than 50% of the amount paid by the government to the prime for contract performance to firms that are not certified VetCert SDVOSBs.

General construction. In the case of a contract for general construction, the SDVOSB prime contractor will not pay more than 85% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, to firms that are not certified VetCert SDVOSBs.

Special trade construction contractors. In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime for contract performance, excluding the cost of materials, may be paid to firms that are not certified VetCert SDVOSBs.