Attach 4 - PM - LEVELS OF MAINTENANCE.pdf

PDF 166 KB Posted

Attached to
DDAA Vertical Lift Module Preventative/Corrective Maintenance Federal contract opportunity
Solicitation number
SP330025Q0080
Issued by
Defense Logistics Agency Distribution

About this file

This is a preventive maintenance schedule document from Modula Inc. outlining different maintenance levels for their vertical lift module equipment. The document specifies four maintenance levels with corresponding frequency requirements:

Level 1 PM requires annual maintenance to be performed at least once per year and before 15,000 missions, involving routine inspections, calibration, lubrication, and adjustments by certified technicians. Levels 2-4 involve parts replacement at specific mission intervals: Level 2 (every 30,000 missions) requires replacement of sprockets, chains, pawls, guides, and door parts; Level 3 (every 45,000 missions) requires replacement of wheel-tubes and external bay slides; and Level 4 (every 150,000 missions) requires replacement of vertical belts, pulleys, E-chains, cradle movement cables, motors, and gear motors. The document indicates the products are made in the USA from US and imported components.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PREVENTIVE MAINTENANCE LEVELS

Annual LVL 1 PM Maintenance The Scheduled LVL 1 Maintenance recommended by MODULA INC must be performed at least ONE a YEAR and not beyond No. 15,000 Missions.

During the LVL 1 PM the Certified Technicians will perform all routine inspections, calibration, lubrication, and adjustment activities to ensure the proper operation and increase the longevity of the machines.

Level 2,3,4 - PM parts replacement

The Maintenance KIT replacement program is design to ensure to the machine the proper operation during the years and to max its longevity, replacing some consumable parts at certain time.

• PM LVL 2 Every 30,000 missions (Replace Sprocket, Chains, Pawls, Guides, and Door parts if it is present)

• PM LVL 3 Every 45,000 missions (Replace Wheel-tubes, and external bay slides if an EB is present)

• PM LVL 4 Every 150,000 missions (Replace Vertical Belt, Vertical Pulleys, Vertical E-Chain, Cradle Movement

Cables, Motors, Gear motors)