This is a preventive maintenance schedule document from Modula Inc. outlining different maintenance levels for their vertical lift module equipment. The document specifies four maintenance levels with corresponding frequency requirements:
Level 1 PM requires annual maintenance to be performed at least once per year and before 15,000 missions, involving routine inspections, calibration, lubrication, and adjustments by certified technicians. Levels 2-4 involve parts replacement at specific mission intervals: Level 2 (every 30,000 missions) requires replacement of sprockets, chains, pawls, guides, and door parts; Level 3 (every 45,000 missions) requires replacement of wheel-tubes and external bay slides; and Level 4 (every 150,000 missions) requires replacement of vertical belts, pulleys, E-chains, cradle movement cables, motors, and gear motors. The document indicates the products are made in the USA from US and imported components.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0001 SF30 SP330025Q0080.pdf | ||
| Attach 13 - DOL Wage Determination 2015-4587 dtd 23Dec2024.pdf | ||
| Attach 12 - QASP - CAP- VLMs Mntc.pdf | ||
| Attach 10 - TE 1.1 Contractor Personnel Sec.pdf | ||
| Attach 8 - DL1591 Supervisor Mishap Report.pdf | ||
| Attach 11 - TE_1.2_CAC_Procedures.pdf | ||
| Attach 9 - DL1818 Visitor Notification Form.pdf | ||
| Attach 5 - DDAA Bldg. 362 VLM Storage System Project Drawings.pdf | ||
| CSS SP3300-25-Q-0080.pdf | ||
| Attach 6 - DD2875 System Authorization Access Request.pdf | ||
| Attach 2 - PWS - VLM - DDAA.pdf | ||
| Attach 12 - QASP DLA Distributiuon Anniston.docx | DOCX document | |
| Attach 7 - DL0584 Visitor Register Form.pdf | ||
| Attach 3 - DDAA VLM Equipment List.xlsx | XLSX spreadsheet | |
| Attach 1 - Schedule of Services - DDAA Modula VLM.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PREVENTIVE MAINTENANCE LEVELS
Annual LVL 1 PM Maintenance The Scheduled LVL 1 Maintenance recommended by MODULA INC must be performed at least ONE a YEAR and not beyond No. 15,000 Missions.
During the LVL 1 PM the Certified Technicians will perform all routine inspections, calibration, lubrication, and adjustment activities to ensure the proper operation and increase the longevity of the machines.
Level 2,3,4 - PM parts replacement
The Maintenance KIT replacement program is design to ensure to the machine the proper operation during the years and to max its longevity, replacing some consumable parts at certain time.
• PM LVL 2 Every 30,000 missions (Replace Sprocket, Chains, Pawls, Guides, and Door parts if it is present)
• PM LVL 3 Every 45,000 missions (Replace Wheel-tubes, and external bay slides if an EB is present)
• PM LVL 4 Every 150,000 missions (Replace Vertical Belt, Vertical Pulleys, Vertical E-Chain, Cradle Movement
Cables, Motors, Gear motors)