- Attached to
- UVALDE NFH-30KW PV SYSTEM
- Solicitation number
- 140F0220R0051
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140F0220R0051_Amd_0001.pdf | ||
| Attach-2-Specifications.pdf | ||
| Attach-1-Drawings.pdf | ||
| Attach-4-Past Performance and Clauses.pdf | ||
| Attach-5-DBA Wage Rates.pdf | ||
| Sol_140F0220R0051.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| UVALDE NFH | 2020 Solar PV Installation | ||||
| Uvalde County, Tx | |||||
| Attachment-3- Price Sheet 140F0220R0051 | |||||
| ITEM | |||||
| NO. | Direct Cost Bid Item Description | Unit | Est QTY | Unit Price | AMOUNT |
| 1 | PV Design and Utility Coordination and Approval | LS | 1 | ||
| 2 | Initial 10KW-AC PV Syetem Installation which shall include but not limited to PV Module/Array, DC Disconnects, Inverters, Solar AC Combineer Panel, FWS Solar Production Meter, AC Utility Disconnect, Utility Production meter, Interconnection Equipment, and appropriate Nameplates. | LS | 1 | ||
| Indirect Cost Item Description | |||||
| 3 | Insurnace & Bonds | % | 1 | ||
| 4 | Mobilization & Demobilization | % | 1 | ||
| 5 | Overhead Cost | % | 1 | ||
| 6 | Profit | % | 1 |
Total base Price
| 7 | ADDITIVE BID ITEM #1: Additional 10KW- | |||
| AC PV Syetem Installation which shall include but not limited to PV Module/Array, DC Disconnects, Inverters, and appropriate Nameplates. | LS | 1 | ||
| Indirect Cost Item Description | ||||
| 8 | Insurnace & Bonds | % | 1 | |
| 9 | Mobilization & Demobilization | % | 1 | |
| 10 | Overhead Cost | % | 1 | |
| 11 | Profit | % | 1 |
Total Alt-1 Price
| 12 | ADDITIVE BID ITEM #2: Additional 10KW- | |
| AC PV Syetem Installation which shall include but not limited to PV Module/Array, DC Disconnects, Inverters, and appropriate Nameplates. | LS | 1 |
| Indirect Cost Item Description | % | 1 | |
| 13 | Insurnace & Bonds | % | 1 |
| 14 | Mobilization & Demobilization | % | 1 |
| 15 | Overhead Cost | % | 1 |
| 16 | Profit | % | 1 |
Total Alt-2 Price
| TOTAL PRICE BASE ALT-1 & ALT-2 |
| NOTE; Award will be made to the base price, subject to funding. |