Attach-3 Delivery Requirement-W912QM26QA001.pdf

PDF 88 KB Posted

Attached to
Bottled Water and Bulk water
Solicitation number
W912QM-26-Q-A001
Issued by

About this file

This document is an Attachment to a federal contract solicitation outlining detailed delivery requirements for water supply in El Salvador. The contractor must provide two water product types: 660 ml plastic bottles (individually sealed, stamped with bottling/expiration dates, packaged in 24-bottle cases) and 5-gallon plastic water jugs (sealed, with capped stamped dates). Critical quality standards mandate that the supplier must be approved/accredited by the US Army Veterinary Command, with contract termination possible if water standards are not maintained.

Bulk water sourcing has specific hierarchical preferences: first choice is the El Salvador Potable water system, followed by fresh river water upstream from towns/villages, and lastly water from local wells. The contractor must comply with all Salvadoran permits and regulations for water extraction, provide notification to the Contracting Officer (KO) and Contracting Officer's Representative (COR) about water sources, and supply calibrated equipment for water pumping and measurement. Water from sources near mines or heavy mineral locations is expressly prohibited, emphasizing the strict quality and safety requirements of this contract.

View the file

Other files

File Type Posted
Attach-2 Bid Schedule - W912QM26QA001.docx DOCX document
Sources Sought Notice-W912QM26QA001.pdf PDF
Attach-2 Bid Schedule W912QM26QA001.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 3

Delivery Requirement

660 ML Bottles: The Contractor shall provide water in clear or translucent, 660 ml plastic bottles.

The bottles shall be individually sealed and shall be stamped with the date of bottling and expiration date. The expiration date shall be at least 180 days after date of delivery. A case is comprised of 24 bottles and shall be assembled and sealed in such a manner as to allow stacking. All bottled water cases shall be palletized and shrink-wrapped when delivered.

5 Gallon Jugs: The Contractor shall provide water in clear or translucent, 5 gallon plastic water jugs.

The jugs shall be sealed and the cap shall be stamped with the date of bottling and expiration date. The expiration date shall be at least 30 days after date of delivery.

Water Quality Standards: In order to be awarded and maintain a contract, under this solicitation notice, offerors must be an approved/accredited supplier of potable water by the US Army Veterinary Command. During the course of the contract, the Contractor must maintain their approval rating. If the Contractor’s product is determined to not be in compliance with US Army Veterinarian standards, then the contract will be immediately terminated for cause.

Bulk Water: The contractor shall provide bulk water in the following order of preference: El Salvador Potable water system, fresh water from a flowing river upstream from a town or village, or fresh water pulled from a local well.

The Contractor will comply with all Salvadorian permits, law, and regulations for the extraction of their natural resources. The Contractor will notify the KO and COR about the places where the bulk water was obtained.

The Contractor will provide calibrated meters, pumps, hoses, strainers, connections and related items to pump and measure the water to the designated water tank in the designated area.

Bulk water coming from a source close to a Mine or where heavy minerals are located will not be acceptable for delivery under this contract.

File details come from the government source that posted it. Updated .