Attach-2-Specs.pdf
PDF 216 KB Posted
- Attached to
- SANTA ANA DEMEO AND INSTALL RESIDENCE ROOFING
- Solicitation number
- 140F0121R0094
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach-1A-REVISED_Drawing_0001.pdf | ||
| Sol_140F0121R0094_Amd_0001.pdf | ||
| Attach-5-DBA_Min_Wage_Rates.pdf | ||
| Sol_140F0121R0094.pdf | ||
| Attach-3-Price_Sheet.xlsx | XLSX spreadsheet | |
| Attach-4-Past_Performance_and_Clauses.pdf | ||
| Attach-1-Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SANTA ANA NATIONAL WILDLIFE REFUGE RESIDENCES ROOFS & WINDOWS
HIDALGO COUNTY, TEXAS 2021
SPECIFICATIONS
TABLE OF CONTENTS
SECTION
01009 GENERAL INFORMATION AND REQUIREMENTS
02070 SELECT DEMOLITION
07411 MANUFACTURED (METAL) ROOF PANELS
07920 JOINT SEALANTS
08513 ALUMINUM WINDOWS
08521 ROLLING STORM SHUTTERS
GENERAL INFORMATION AND REQUIREMENTS 01009-1
SECTION 01009 - GENERAL INFORMATION AND REQUIREMENTS
PART 1: GENERAL
1.1 SUMMARY:
A. Description of Work: The work shall consist of labor, equipment, supplies, and materials to perform the following on residences:
1. Replace existing asphalt shingle roofing with standing seam metal roof systems per IBC, NRCA, TDI, and industry standards, and per attached plans and specifications. All systems must meet wind loadings per ASCE-7 referenced in IBC, including uplift forces.
2. Replace windows.
3. Install hurricane shutters on windows.
4. No rain water shall be allowed to enter building interior due to contractor’s activities.
B. Location: Work under this contract is located at the Santa Ana National Wildlife Refuge in Alamo, Texas in Hidalgo County.
C. Site Visit: Contractors are encouraged to visit the project site and inspect existing conditions prior to submitting quotes. See Federal Acquisition Regulation (FAR) clause 52.236-27 Site Visit. Contact Joe D’Arrigo, Refuge Maintenance Supervisor, at 956-784-7530 or cell phone: 580-514-5805, to arrange a site visit.
1.2 REFERENCES:
Referenced Standards are listed in the applicable specification section.
1.3 DEFINITIONS:
Approvals: Approval of submittals is an indication that the Contractor’s submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer’s (CO) attention in writing.
1.4 SUBMITTALS:
GENERAL INFORMATION AND REQUIREMENTS 01009-2
A. Scope: Submittals include shop drawings, manufacturers’ literature, as-built drawings, samples, work schedules and a schedule of values.
B. Requirements: Refer to specification sections for submittals required. Allow at least 7 working days for review, plus transmittal time back and forth. Submittals shall be sent or delivered to the Contracting Officer’s Technical Representative (COTR) at U.S. Fish and Wildlife Service, Region 2, Division of Engineering, P.O. Box 1306, Albuquerque, NM 87103-1306. Submittals shall come directly from the Contractor with their stamp and signature of approval; submittals will not be accepted from sub-contractors or suppliers.
Do not commence work which requires review of any submittals until receipt of returned submittals with an acceptable action. Do not allow submittals without an acceptable action marking to be used for the project.
C. Identification of Submittals: Completely identify each submittal by showing at least the following information:
1. Name and address of submitter (Contractor), plus name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, submittal number, and specification section number to which the submittal applies.
4. Whether this is an original submittal or resubmittal.
5. Each item shall clearly note the manufacturer’s name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
D. Submittals shall be transmitted in electron format by email to the COR.
E. There will be no approval of submittals prior to bid opening and award. Submittals will be evaluated based on the requirements of the specifications and drawings, during the submittal process after contract award.
1.5 CONFORMANCE:
Submittals must show clearly that the product, sample or shop drawing conforms to the specifications.
1.6 QUALITY ASSURANCE:
GENERAL INFORMATION AND REQUIREMENTS 01009-3
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This contract incorporates materials, applications, and tests by reference, with the same force and effect as if they were given in full text.
B. Conflict: Where a conflict occurs between reference documents, drawings, and project specifications, the most stringent requirement shall govern.
C. Product basis: Where specifications or drawings call out a specific product or manufacturer, it is understood that an equal or better product is acceptable, as approved in the submittal process.
1.7 DELIVERY, STORAGE, AND HANDLING:
A. Delivery: Protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer’s name, brand designation, and contents legibly indicated. The containers shall bear the referenced specification number, type, and class as applicable.
B. Storage: Provide temporary storage facilities for products. Storage shall comply with the manufacturer’s instructions. The storage area shall permit access for inspection and handling.
C. Handling: Load and unload products protecting them from damage.
1.8 PROJECT/SITE CONDITIONS:
A. The project site is the Santa Ana National Wildlife Refuge. Work areas shall be roped off to alert unauthorized personnel to work in progress.
B. Existing property not indicated for demolition, shall be protected. All damage by
Contractor’s activities shall be repaired by the Contractor at no additional cost to the Government.
C. Safety is paramount. Contractor is responsible for safety on the project site and shall take measures to maintain a safe area around the project site which is used by Government employees and the public. Applicable OSHA regulations shall be adhered to by the Contractor. Contractor shall submit a safety plan prior to starting work.
D. Landscape Protection: Protect all vegetation inside and outside work limits. All rutting
GENERAL INFORMATION AND REQUIREMENTS 01009-4
caused by Contractor activities shall be filled and contoured to match adjacent areas.
Areas damaged by Contractor activities shall be repaired.
1.9 SEQUENCING AND SCHEDULING:
A bar chart type work schedule shall be submitted to the COTR within 5 days after the preconstruction conference. When requested, submit an updated schedule within 3 calendar days.
PART 2: PRODUCTS
2.1 TEMPORARY FACILITIES:
A. The Contractor shall provide portable toilet facilities at the construction site.
B. Water is available at the site for Contractor’s reasonable use.
C. Electric power is available at the site for Contractor’s reasonable use.
PART 3: EXECUTION
3.1 PROJECT MEETINGS:
A. Preconstruction Conference:
1. A preconstruction conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose of the meeting will be to review required work, project drawings and specifications, construction schedules, payroll, payments, and administrative provisions of the contract.
2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
3. The Contractor shall submit a schedule of values within 5 days after the preconstruction conference, which may be used as a basis of payment as the work progresses.
GENERAL INFORMATION AND REQUIREMENTS 01009-5
B. Progress Meetings:
To be held at the project site as required.
C. Inspections:
1. Routine inspections will be performed by the government Contract Inspector (CI).
Inspection of items of work by the CI will not relieve the Contractor of the requirement to meet project specifications. The CI shall be informed 24 hours in advance of work requiring his observation. After being informed in advance the CI’s non-attendance shall not prohibit the Contractor from proceeding with work in the CI’s absence.
2. For final inspection, notify the COTR in writing at least 6 working days before the completion date so the Government can schedule final inspection. The superintendent shall be present during the final inspection.
3.2 DISPOSAL OF DEBRIS:
Demolition debris shall be removed from the project site and disposed of in a legal disposal site by the Contractor. Contractor shall pay all fees required for disposal.
3.3 AS-BUILT DRAWINGS:
A complete set of full-sized prints, furnished by the Contracting Officer for this purpose only, shall be kept by the Contractor. As the job progresses, continuously maintain as-built drawings of the work. The changes shall be noted legibly in red pencil or red ink.
These drawings shall be submitted to the COR prior to final inspection. Should final inspection reveal changes in the Project not so noted on the As-Built Drawings, the Contractor shall record these changes on the As-Built Drawings within 3 working days of
Final Inspection and deliver completed As-Built Drawings to the COTR.
3.4 WARRANTY:
A. All project construction shall be provided with a one-year warranty in accordance with
FAR 52.246-21.
B. With respect to warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the contract, the Contractor shall:
GENERAL INFORMATION AND REQUIREMENTS 01009-6
1. Obtain the most favorable warranties that would be given by the Contractor in normal commercial practices, but in no case less than called for by the specifications.
2. Require warranties to be executed, in writing, for the benefit of the Government.
3. Submit warranties to the COR prior to the final inspection.
END OF SECTION
SELECTIVE DEMOLITION 02070 - 1
SECTION 02070 - SELECTIVE DEMOLITION
PART 1: GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Demolition and removal of materials and equipment as indicated in the drawings and specifications.
1.2 MATERIALS OWNERSHIP
A. Demolished materials shall become the property of the Contractor, and shall be removed from the project site and legally disposed of.
1.3 PROJECT/SITE CONDITIONS
A. A staging area for contractor activities will be available in the immediate vicinity of the project. The exact area will be established by the Contractor and FI.
B. Unforseen Conditions: Should unforseen conditions be encountered that affect design or function of the project, investigate fully and submit an accurate, detailed, written report to the COR. While awaiting the Contracting Officer’s response, reschedule operations if necessary to avoid delay of overall project.
PART 2: PRODUCTS (NOT USED)
PART 3: EXECUTION
3.1 EXAMINATION
A. The Contractor shall visit the site and verify the extent and location of the demolition work required. Correlate with drawings and specifications.
3.2 PREPARATION
A. Protection:
1. Provide for the protection of persons passing around or through the area of demolition.
SELECTIVE DEMOLITION 02070 - 2
2. Perform demolition so as to prevent damage to adjacent improvements and facilities to remain.
3. Examine structural supporting conditions and report to the COR any conditions which vary from the drawings or for which unstable conditions may be created by Contractor’s activities. Temporary structural support is the responsibility of the
Contractor. Permanent structural support plans are based on “as-built” drawings which are sometimes not accurate; Contractor shall verify accuracy before proceeding, and shall halt activities and report any variance to the COR before proceeding.
3.3 DEMOLITION - GENERAL
A. Remove debris daily.
B. Perform selective demolition using methods which are least likely to damage work to remain and which will provide adequate structural support and proper surfaces for patching.
C Any areas not called out for demolition but damaged by Contractor activities shall be repaired by the Contractor to pre-existing conditions at no additional cost to the government.
3.4 CLEANING
A. Clean areas affected by demolition to conditions existing prior to the demolition.
MANUFACTURED ROOF PANELS 07411-1
SECTION 07411 - MANUFACTURED ROOF PANELS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes the following:
1. Standing-seam roof panels and underlayment.
1.2 PERFORMANCE REQUIREMENTS
A. General: Provide manufactured roof panel assemblies complying with performance requirements indicated and capable of withstanding structural movement, thermally induced movement, and exposure to weather without failure or infiltration of water into the building interior.
B. Air Infiltration: Provide manufactured roof panel assemblies with permanent resistance to air leakage through assembly of not more than 0.09 cfm/sq. ft. of fixed roof area when tested according to ASTM E 1680 at a static-air-pressure difference of 4.0 lbf/sq. ft.
C. Water Penetration: Provide manufactured roof panel assemblies with no water penetration as defined in the test method when tested according to ASTM E 1646 at a minimum differential pressure of 20 percent of inward acting, wind-load design pressure of not less than 6.24 lb/sq. ft. and not more than 12.0 lb/sq. ft.
D. Wind-Uplift Resistance: Provide roof panel assemblies that meet requirements of UL 580
Class 90, or FMG listing in FMG 4471, Class 1A-105.
E. Roof system shall meet the standards of the Texas Department of Insurance (TDI) and the local wind loading and uplift resistance.
F. Energy Star Compliance: Solar reflectance of roofing materials shall be at least 0.25 upon installation and at least 0.15 3 years after installation when tested in accordance with ASTM E903-96-Standard Test Method for Solar Absorptance, Reflectance and Transmittance of Materials Using Integrating Spheres.
F. Emissivity: Shall be at least 0.8 when tested in accordance with ASTM 408.
MANUFACTURED ROOF PANELS 07411-2
1.3 SUBMITTALS
A. Product Data: Include manufacturer's product specifications, standard details, certified product test results, and general recommendations, as applicable to materials and finishes for each component and for total panel assemblies.
B. Shop Drawings: Show layouts of panels on roofs, details of edge conditions, joints, panel profiles, supports, anchorages, trim, flashings, underlayment, closures, and special details, including water-tight installation of roof penetrations for vents and fan exhausts.
Distinguish between factory- and field-assembled work.
C. Samples for Initial Selection: Manufacturer's color chips showing the color, texture, and pattern for roof panels with factory-applied finishes to match specified product.
D. Product Test Reports: Indicate compliance of manufactured roof panel assemblies and materials with performance and other requirements based on comprehensive testing of current products.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Deliver panels and other components so they will not be damaged or deformed. Package panels for protection against damage during transportation or handling.
B. Handling: Exercise care in unloading, storing, and erecting roof panels to prevent bending, warping, twisting, and surface damage.
C. Stack materials on platforms or pallets, covered with tarpaulins or other suitable weathertight and ventilated covering. Store panels to ensure dryness. Do not store panels in contact with other materials that might cause staining, denting, or other surface damage.
1.5 PROJECT CONDITIONS
A. Field Measurements: Verify location of structural members and openings in substrates by field measurements before fabrication and indicate measurements on Shop Drawings.
Coordinate fabrication schedule with construction progress to avoid delaying the Work.
MANUFACTURED ROOF PANELS 07411-3
1. Established Dimensions: Where field measurements cannot be made without delaying the Work, either establish opening dimensions and proceed with fabricating roof panels without field measurements or allow for trimming panel units. Coordinate roof construction to ensure actual locations of structural members and to ensure opening dimensions correspond to established dimensions.
1.6 WARRANTY
A. General Warranty: Special warranties specified in this Article shall not deprive the
Government of other rights the Government may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents.
B. Special Finish Warranty: Submit a written warranty, signed by manufacturer, covering failure of the factory-applied exterior finish on metal roof panels within the specified warranty period and agreeing to repair finish or replace roof panels that show evidence of finish deterioration. Deterioration of finish includes, but is not limited to, color fade, chalking, cracking, peeling, and loss of film integrity.
C. Finish Warranty Period: Manufacturer’s standard warranty, minimum 20 years from date of Substantial Completion.
D. Special Weathertight Warranty: Submit a written warranty executed by manufacturer agreeing to repair or replace metal roof panel assembly that fails to remain weathertight within the specified warranty period.
E. Weathertight Warranty Period: 5 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 METALS AND FINISHES
A. Metallic-Coated Steel Sheet Prepainted: Steel sheet metallic coated by the hot-dip process and prepainted to comply with ASTM A 755 (ASTM A 755M) and the following requirements:
MANUFACTURED ROOF PANELS 07411-4
1. Factory preformed panels to meet UL 580, Class 90, or FMG 4471, Class 1A-105 design span panel.
2. FM Global Listing for Hail Resistance of SH, Severe Hail.
3. Zincalume Steel Sheet: ASTM 792, structural quality; or zinc-coated (galvanized) steel sheet, ASTM A 653/A, G90 coating designation, structural quality.
4. Thickness: 0.028 inch (24 gage), unless otherwise indicated.
5. Use one piece continuous panels from eave to ridge.
6. Standing Seams: 1½ inches high at 16 to 18 inches on center with flat pan between standing seams. Double fasten cleats at 12 inches on center. Provide continuous sealant at top (inside) of seam. Match appearance of existing shop building roof.
7. Finish: Apply the following organic coating in thickness indicated. Furnish appropriate air-drying spray finish in matching color for touchup.
a. Fluoropolymer 2-Coat Coating System: Manufacturer's standard 2-coat, thermocured system composed of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 70 percent polyvinylidene fluoride resin by weight complying with physical properties and coating performance requirements of AAMA/NWWDA 101/I.S.2 2605, except as modified below:
1) Durability: Provide coating field tested under normal range of weather conditions for a minimum of 20 years without significant peel, blister, flake, chip, crack, or check in finish; without chalking in excess of a chalk rating of 8 according to ASTM D 4214; and without fading in excess of 5 Hunter units.
2) Humidity resistance: 2000 hours.
3) Water Resistance: 2000 hours.
b. Color: As selected by COR from manufacturer’s full range of colors.
c. Prime Coating: Where painting after installation is indicated, provide pretreatment and white or light-colored, baked-on epoxy primer coat; with a minimum dry film thickness of 0.2 mil.
d. Energy Star Compliance: Solar reflectance of roofing materials shall be at least 0.25 upon installation and at least 0.15 3 years after installation when tested in accordance with ASTM E903-96-Standard Test Method for Solar Absorptance, Reflectance and Transmittance of Materials Using Integrating Spheres.
MANUFACTURED ROOF PANELS 07411-5
e. Emissivity: Shall be at least 0.9 when tested in accordance with ASTM 408.
2.2 ROOF PANEL ASSEMBLIES
A. Standing-Seam Roof Panels: Manufacturer's standard factory-formed, standing-seam roof panel assembly designed for concealed mechanical attachment of panels to roof sheathing.
2.3 UNDERLAYMENT MATERIALS
A. Self-Adhering, High-Temperature Underlayment. Cold applied sheet, minimum 30 mils thick, as recommended by roofing manufacturer to meet performance requirements.
2.4 MISCELLANEOUS MATERIALS
A. General: Provide materials and accessories required for a complete roof panel assembly and as recommended by panel manufacturer, unless otherwise indicated.
B. Fasteners: Self-tapping screws and other suitable fasteners per manufacturer’s written recommendations.
1. Use galvanized or stainless-steel fasteners.
2. Provide exposed fasteners with heads matching color of panel by means of factory-applied coating.
3. Fasteners to be #8 x 1 inch screws with pancake heads.
C. Accessories: Unless otherwise specified, provide components required for a complete roof panel assembly including trim, ridge closures, clips, seam covers, battens, flashings, sealants, gaskets, fillers, closure strips, and similar items. Match materials and finishes of panels.
1. Closure Strips: Closed-cell, self-extinguishing, expanded, cellular, rubber or cross-linked, polyolefin-foam flexible closure strips. Cut or premold to match configuration of panels. Provide closure strips where indicated or necessary to ensure weathertight construction.
2. Sealing Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound
MANUFACTURED ROOF PANELS 07411-6
sealing tape with release paper backing. Provide permanently elastic, nonsag, nontoxic, nonstaining tape.
3. Sealant: One part polyurethane caulk, 116 Mameco Vulkem, or approved equal.
D. Expansion-Joint Sealant: For hooked-type expansion joints that must be free to move, provide nonsetting, nonhardening, nonmigrating, heavy-bodied polyisobutylene sealant.
E. Primer: Rust-inhibitive primer recommended by panel manufacturer for finish coat.
2.5 FABRICATION
A. General: Fabricate and finish panels and accessories at the factory to greatest extent possible, by manufacturer's standard procedures and processes, as necessary to fulfill indicated performance requirements demonstrated by laboratory testing. Comply with indicated profiles and with dimensional and structural requirements.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements indicated for conditions affecting performance of metal panel roofing.
1. Do not proceed with roof panel installation until unsatisfactory conditions have been corrected.
A. Coordinate metal panel roofing with other adjoining work to provide a leakproof, secure, and noncorrosive installation.
B. Promptly remove protective film, if any, from exposed surfaces of metal panels. Strip with care to avoid damage to finish.
C. Field verify measurements prior to fabrication.
MANUFACTURED ROOF PANELS 07411-7
3.3 PANEL INSTALLATION
A. General: Comply with panel manufacturer's written instructions and recommendations for installation, as applicable to project conditions and supporting substrates. Anchor panels and other components of the Work securely in place, with provisions for thermal and structural movement.
1. Install panels with concealed fasteners, unless otherwise indicated.
2. Install panels over solid substrate. Install 1 ply of underlayment from lower edge up, with at least 3-inch side laps and 4-inch end laps, or per manufacturer’s recommendations.
B. Accessories: Install components required for a complete roof panel assembly including trim, ridge closures, ridge vent, clips, seam covers, battens, flashings, sealants, gaskets, fillers, closure strips, and similar items.
C. Separate dissimilar metals by painting each metal surface in area of contact with a bituminous coating, by applying rubberized-asphalt underlayment to each metal surface, or by other permanent separation as recommended by manufacturers of dissimilar metals.
D. Install underlayment and building-paper slip sheet on roof deck under metal panels, unless otherwise recommended by panel manufacturer. Apply from eave to ridge in shingle fashion and lap joints a minimum of 2 inches.
E. Joint Sealers: Install gaskets, joint fillers, and sealants where indicated and where required for weatherproof performance of panel assemblies. Provide types of gaskets, fillers, and sealants indicated or, if not otherwise indicated, types recommended by panel manufacturer.
F. Standing-Seam Roof Panel Assembly: Fasten panels to supports with concealed clip according to panel manufacturer's written instructions.
1. Install clips at each support with self-drilling/self-tapping fasteners.
2. At end laps of panels, install tape calk between panels.
3. Install factory-calked cleats at standing-seam joints. Apply snap-on batten to panels to
MANUFACTURED ROOF PANELS 07411-8
provide a weathertight joint.
4. Seaming: Complete seaming of panel joints by operating portable power-driven equipment of type recommended by panel manufacturer to provide a weathertight joint.
G. Installation Tolerances: Shim and align panel units within installed tolerance of 1/4 inch in
20 feet on slope and location lines as indicated and within 1/8-inch offset of adjoining faces and of alignment of matching profiles.
3.4 CLEANING AND PROTECTING
A. Damaged Units: Replace panels and other components of the Work that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures.
B. Cleaning: Remove temporary protective coverings and strippable films, if any, as soon as each panel is installed. On completion of panel installation, clean finished surfaces as recommended by panel manufacturer and maintain in a clean condition during construction.
JOINT SEALANTS 07920 - 1
SECTION 07920 - JOINT SEALANTS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes sealants for the following applications, including those specified by refer-ence to this Section:
1. Exterior joints in the following vertical surfaces and nontraffic horizontal surfaces:
a. Joints between different materials listed above.
b. Perimeter joints around frames of doors and windows.
c. Control and expansion joints.
d. Other joints as indicated.
2. Interior joints in the following vertical surfaces and horizontal nontraffic surfaces:
a. Control and expansion joints on exposed interior surfaces of exterior walls.
b. Perimeter joints of exterior openings where indicated.
c. Perimeter joints between interior wall surfaces and frames of interior doors and windows.
d. Joints between plumbing fixtures and adjoining walls, floors, and counters.
e. Other joints as indicated.
1.2 PERFORMANCE REQUIREMENTS
A. Provide elastomeric joint sealants that establish and maintain watertight and airtight continuous joint seals without staining or deteriorating joint substrates.
B. Provide joint sealants for interior applications that establish and maintain airtight and water-resistant continuous joint seals without staining or deteriorating joint substrates.
1.3 SUBMITTALS
A. Product Data: For each joint-sealant product indicated.
1.4 QUALITY ASSURANCE
A. Installer Qualifications: An experienced installer who has specialized in installing joint sealants similar in material, design, and extent to those indicated for this Project and whose work has re-sulted in joint-sealant installations with a record of successful in-service performance.
B. Source Limitations: Obtain each type of joint sealant through one source from a single manu-facturer.
1.5 DELIVERY, STORAGE, AND HANDLING
JOINT SEALANTS 07920 - 2
A. Deliver materials to Project site in original unopened containers or bundles with labels indicat-ing manufacturer, product name and designation, color, expiration date, pot life, curing time, and mixing instructions for multicomponent materials.
B. Store and handle materials in compliance with manufacturer's written instructions to prevent their deterioration or damage due to moisture, high or low temperatures, contaminants, or other causes.
1.6 PROJECT CONDITIONS
A. Environmental Limitations: Do not proceed with installation of joint sealants under the follow-ing conditions:
1. When ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer.
2. When joint substrates are wet.
3. When building is not fully enclosed and conditioned.
B. Joint-Width Conditions: Do not proceed with installation of joint sealants where joint widths are less than those allowed by joint sealant manufacturer for applications indicated.
C. Joint-Substrate Conditions: Do not proceed with installation of joint sealants until contaminants capable of interfering with adhesion are removed from joint substrates.
PART 2 - PRODUCTS
2.1 PRODUCTS AND MANUFACTURERS
A. Available Products: Subject to compliance with requirements, products that may be incorpo-rated into the Work include, but are not limited to, the products specified in the sealant sched-ules at the end of Part 3.
2.2 MATERIALS, GENERAL
A. Compatibility: Provide joint sealants, backings, and other related materials that are compatible with one another and with joint substrates under conditions of service and application, as demonstrated by sealant manufacturer based on testing and field experience.
B. Colors of Exposed Joint Sealants: Match adjacent surface. Verify selections with Contract In-spector.
2.3 ELASTOMERIC JOINT SEALANTS
A. Elastomeric Sealant Standard: Comply with ASTM C 920 and other requirements indicated for each liquid-applied chemically curing sealant in the Elastomeric Joint-Sealant Schedule at the end of Part 3, including those referencing ASTM C 920 classifications for type, grade, class, and uses.
B. Additional Movement Capability: Where additional movement capability is specified in the Elastomeric Joint-Sealant Schedule, provide products with the capability, when tested for adhe-
JOINT SEALANTS 07920 - 3
sion and cohesion under maximum cyclic movement per ASTM C 719, to withstand the speci-fied percentage change in the joint width existing at the time of installation and remain in com-pliance with other requirements of ASTM C 920 for uses indicated.
C. Stain-Test-Response Characteristics: Where elastomeric sealants are specified in the Elasto-meric Joint-Sealant Schedule to be nonstaining to porous substrates, provide products that have undergone testing according to ASTM C 1248 and have not stained porous joint substrates indi-cated for Project.
2.4 JOINT-SEALANT BACKING
A. General: Provide sealant backings of material and type that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing.
B. Cylindrical Sealant Backings: ASTM C 1330, of type indicated below and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance:
1. Type C: Closed-cell material with a surface skin.
2. Type O: Open-cell material.
3. Type: Any material indicated above.
C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant manufac-turer for preventing sealant from adhering to rigid, inflexible joint-filler materials or joint sur-faces at back of joint where such adhesion would result in sealant failure. Provide self-adhesive tape where applicable.
2.5 MISCELLANEOUS MATERIALS
A. Primer: Material recommended by joint sealant manufacturer where required for adhesion of sealant to joint substrates indicated, as determined from preconstruction joint-sealant-substrate tests and field tests.
B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers of sealants and sealant backing materials, free of oily residues or other substances capable of staining or harming joint substrates and adjacent nonporous surfaces in any way, and formulated to pro-mote optimum adhesion of sealants with joint substrates.
C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and surfaces adjacent to joints.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance with requirements for joint configuration, installation tolerances, and other conditions affecting joint-sealant performance.
B. Proceed with installation only after unsatisfactory conditions have been corrected.
JOINT SEALANTS 07920 - 4
A. Surface Cleaning of Joints: Clean out joints immediately before installing joint sealants to comply with joint sealant manufacturer's written instructions and the following requirements:
1. Remove all foreign material from joint substrates that could interfere with adhesion of joint sealant, including dust, paints (except for permanent, protective coatings tested and approved for sealant adhesion and compatibility by sealant manufacturer), old joint seal-ants, oil, grease, waterproofing, water repellents, water, surface dirt, and frost.
2. Clean porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil-free compressed air. Porous joint surfaces include the following:
a. Concrete.
b. Masonry.
c. Unglazed surfaces of ceramic tile.
3. Remove laitance and form-release agents from concrete.
4. Clean nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants.
a. Metal.
b. Glass.
c. Glazed surfaces of ceramic tile.
B. Joint Priming: Prime joint substrates where recommended in writing by joint sealant manufac-turer, based on preconstruction joint-sealant-substrate tests or prior experience. Apply primer to comply with joint sealant manufacturer's written instructions. Confine primers to areas of joint-sealant bond; do not allow spillage or migration onto adjoining surfaces.
C. Masking Tape: Use masking tape where required to prevent contact of sealant with adjoining surfaces that otherwise would be permanently stained or damaged by such contact or by clean-ing methods required to remove sealant smears. Remove tape immediately after tooling without disturbing joint seal.
3.3 INSTALLATION OF JOINT SEALANTS
A. General: Comply with joint sealant manufacturer's written installation instructions for products and applications indicated, unless more stringent requirements apply.
B. Sealant Installation Standard: Comply with recommendations of ASTM C 1193 for use of joint sealants as applicable to materials, applications, and conditions indicated.
C. Install sealant backings of type indicated to support sealants during application and at position required to produce cross-sectional shapes and depths of installed sealants relative to joint widths that allow optimum sealant movement capability.
1. Do not leave gaps between ends of sealant backings.
2. Do not stretch, twist, puncture, or tear sealant backings.
3. Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials.
JOINT SEALANTS 07920 - 5
D. Install bond-breaker tape behind sealants where sealant backings are not used between sealants and back of joints.
E. Install sealants by proven techniques to comply with the following and at the same time back-ings are installed:
1. Place sealants so they directly contact and fully wet joint substrates.
2. Completely fill recesses provided for each joint configuration.
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that allow op-timum sealant movement capability.
F. Tooling of Nonsag Sealants: Immediately after sealant application and before skinning or cur-ing begins, tool sealants according to requirements specified below to form smooth, uniform beads of configuration indicated; to eliminate air pockets; and to ensure contact and adhesion of sealant with sides of joint.
1. Remove excess sealants from surfaces adjacent to joint.
2. Use tooling agents that are approved in writing by sealant manufacturer and that do not discolor sealants or adjacent surfaces.
3. Provide concave joint configuration per Figure 5A in ASTM C 1193, unless otherwise indicated.
4. Provide flush joint configuration, per Figure 5B in ASTM C 1193, where indicated.
3.4 CLEANING
A. Clean off excess sealants or sealant smears adjacent to joints as the Work progresses by meth-ods and with cleaning materials approved in writing by manufacturers of joint sealants and of products in which joints occur.
3.5 PROTECTION
A. Protect joint sealants during and after curing period from contact with contaminating substances and from damage resulting from construction operations or other causes so sealants are without deterioration or damage at time of Substantial Completion. If, despite such protection, damage or deterioration occurs, cut out and remove damaged or deteriorated joint sealants immediately so installations with repaired areas are indistinguishable from the original work.
3.6 ELASTOMERIC JOINT-SEALANT SCHEDULE
A. Multicomponent Nonsag Urethane Sealant: Where joint sealants of this type are indicated, pro-vide products complying with the following:
1. Products:
a. Dynatred; Pecora Corporation.
b. NP 2; Sonneborn Building Products Div., ChemRex Inc.
c. Sikaflex 2c NS TG; Sika
2. Type and Grade: M (multicomponent) and NS (nonsag).
3. Class: 25.
4. Use Related to Exposure: T (traffic).
JOINT SEALANTS 07920 - 6
5. Uses Related to Joint Substrates: M, G, A, and, as applicable to joint substrates indicat-ed, O.
6. Applications: Traffic locations.
B. Single-Component Nonsag Urethane Sealant: Where joint sealants of this type are indicated, provide products complying with the following:
1. Products:
a. Dynatrol I; Pecora Corporation.
b. Sikaflex - 1a; Sika Corporation.
c. NP 1; Sonneborn Building Products Div., ChemRex Inc.
2. Type and Grade: S (single component) and NS (nonsag).
3. Class: 25.
4. Use Related to Exposure: NT (nontraffic).
5. Uses Related to Joint Substrates: M, A, and, as applicable to joint substrates indicated, O.
6. Applications: Non-traffic locations.
C. Mildew-Resistant Silicone Sealant: Where joint sealants of this type are indicated, provide products formulated with fungicide that are intended for sealing interior ceramic tile joints and other nonporous substrates that are subject to in-service exposures of high humidity and temperature extremes, and that comply with the following:
1. Products:
a. 786 Mildew Resistant; Dow Corning.
b. Sanitary 1700; GE Silicones.
c. NuFlex 302; NUCO Industries, Inc.
d. 898 Silicone Sanitary Sealant; Pecora Corporation.
e. PSI-611; Polymeric Systems, Inc.
f. Tremsil 600 White; Tremco.
2. Type and Grade: S (single component) and NS (nonsag).
3. Class: 25.
4. Use Related to Exposure: NT (nontraffic).
5. Uses Related to Joint Substrates: G, A, and, as applicable to joint substrates indicated, O.
a. Use O Joint Substrates: Coated glass, color anodic aluminum, galvanized steel, and ceramic tile.
6. Applications: All wet locations, including rest rooms, showers and janitor closets.
END OF SECTION 07920
ALUMINUM WINDOWS 085113 - 1
SECTION 085113 - ALUMINUM WINDOWS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes aluminum windows for exterior locations.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings: Include plans, elevations, sections, hardware, accessories, insect screens, operational clearances, and details of installation, including anchor, flashing, and sealant installation.
C. Samples: For each exposed product and for each color specified.
1.3 INFORMATIONAL SUBMITTALS
A. Product test reports.
B. Sample warranties.
1.4 WARRANTY
A. Manufacturer's Warranty: Manufacturer agrees to repair or replace aluminum windows that fail in materials or workmanship within specified warranty period.
1. Warranty Period:
a. Window: 10 years from date of Substantial Completion.
b. Glazing Units: 10 years from date of Substantial Completion.
c. Aluminum Finish: 10 years from date of Substantial Completion.
PART 2 - PRODUCTS
2.1 WINDOW PERFORMANCE REQUIREMENTS
A. Product Standard: Comply with AAMA/WDMA/CSA 101/I.S.2/A440 for definitions and minimum standards of performance, materials, components, accessories, and fabrication unless more stringent requirements are indicated.
1. Window Certification: AAMA certified with label attached to each window.
ALUMINUM WINDOWS 085113 - 2
B. Performance Class and Grade: AAMA/WDMA/CSA 101/I.S.2/A440 as follows:
1. Minimum Performance Class: LC.
2. Minimum Performance Grade: 25.
C. Thermal Transmittance: NFRC 100 maximum whole-window U-factor of 0.35 Btu/sq. ft. x h x deg F.
D. Solar Heat-Gain Coefficient (SHGC): NFRC 200 maximum whole-window SHGC of 0.35.
E. Condensation-Resistance Factor (CRF): Provide aluminum windows tested for thermal performance according to AAMA 1503, showing a CRF of 50.
F. Thermal Movements: Provide aluminum windows, including anchorage, that allow for thermal movements resulting from the following maximum change (range) in ambient and surface temperatures by preventing buckling, opening of joints, overstressing of components, failure of joint sealants, failure of connections, and other detrimental effects. Base engineering calculation on surface temperatures of materials due to both solar heat gain and nighttime-sky heat loss.
1. Temperature Change: 120 deg F (67 deg C) ambient; 180 deg F (100 deg C) material surfaces.
2.2 ALUMINUM WINDOWS
A. Types: Single Hung.
B. Frames and Sashes: Aluminum extrusions complying with
AAMA/WDMA/CSA 101/I.S.2/A440.
1. Thermally Improved Construction: Fabricate frames, sashes, and muntins with an integral, concealed, low-conductance thermal barrier located between exterior materials and window members exposed on interior side in a manner that eliminates direct metal-to-metal contact.
C. Glass: Clear annealed glass, ASTM C1036, Type 1, Class 1, q3.
1. Kind: Fully tempered.
D. Insulating-Glass Units: ASTM E2190.
1. Glass: ASTM C1036, Type 1, Class 1, q3.
a. Tint: Clear].
b. Kind: Fully tempered.
2. Lites: Two or Three to meet performance requirements.
3. Filling: Fill space between glass lites with air or argon to meet performance requirements.
4. Low-E Coating: As required to meet performance requirements.
ALUMINUM WINDOWS 085113 - 3
E. Glazing System: Manufacturer's standard factory-glazing system that produces weathertight seal.
F. Hardware, General: Provide manufacturer's standard corrosion-resistant hardware sized to accommodate sash weight and dimensions.
1. Exposed Hardware Color and Finish: As indicated by manufacturer's designations.
G. Hung Window Hardware:
1. Counterbalancing Mechanism: AAMA 902.
2. Locks and Latches: Operated from the inside only.
H. Weather Stripping: Provide full-perimeter weather stripping for each operable sash unless otherwise indicated.
I. Fasteners: Noncorrosive and compatible with window members, trim, hardware, anchors, and other components.
1. Exposed Fasteners: Do not use exposed fasteners to greatest extent possible. For application of hardware, use fasteners that match finish hardware being fastened.
2.3 ACCESSORIES
A. Subsills: Thermally broken extruded-aluminum subsills in configurations indicated on Drawings.
B. Interior Trim: Extruded-aluminum profiles in sizes and configurations indicated on Drawings.
2.4 INSECT SCREENS
A. General: Fabricate insect screens to integrate with window frame. Provide screen for each operable exterior sash. Screen wickets are not permitted.
1. Type and Location: Half, outside for single-hung sashes.
B. Aluminum Frames: Complying with SMA 1004 or SMA 1201.
C. Glass-Fiber Mesh Fabric: 20-by-20 mesh of PVC-coated, glass-fiber threads; woven and fused to form a fabric mesh resistant to corrosion, shrinkage, stretch, impact damage, and weather deterioration. Comply with ASTM D3656/D3656M.
1. Mesh Color: Manufacturer's standard.
2.5 FABRICATION
A. Fabricate aluminum windows in sizes indicated. Include a complete system for assembling components and anchoring windows.
ALUMINUM WINDOWS 085113 - 4
B. Glaze aluminum windows in the factory.
C. Weather strip each operable sash to provide weathertight installation.
D. Weep Holes: Provide weep holes and internal passages to conduct infiltrating water to exterior.
E. Provide water-shed members above side-hinged sashes and similar lines of natural water penetration.
F. Complete fabrication, assembly, finishing, hardware application, and other work in the factory to greatest extent possible. Disassemble components only as necessary for shipment and installation.
2.6 ALUMINUM FINISHES
A. Finish designations prefixed by AA comply with the system established by the Aluminum Association for designating aluminum finishes.
B. High-Performance Organic Finish (Two-Coat or Three-Coat Fluoropolymer): AA-C12C40R1x Chemical Finish: cleaned with inhibited chemicals; Chemical Finish: conversion coating;
Organic Coating: manufacturer's standard two-coat, thermocured system consisting of specially formulated inhibitive primer and fluoropolymer color topcoat containing not less than 50 percent polyvinylidene fluoride resin by weight. Prepare, pretreat, and apply coating to exposed metal surfaces to comply with AAMA 2604 or AAMA 2605 and with coating and resin manufacturers' written instructions.
1. Color: – Light bronze.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Comply with manufacturer's written instructions for installing windows, hardware, accessories, and other components. For installation procedures and requirements not addressed in manufacturer's written instructions, comply with installation requirements in ASTM E2112.
B. Install windows level, plumb, square, true to line, without distortion or impeding thermal movement, anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent construction to produce weathertight construction.
C. Install windows and components to drain condensation, water penetrating joints, and moisture migrating within windows to the exterior.
D. Separate aluminum and other corrodible surfaces from sources of corrosion or electrolytic action at points of contact with other materials.
ALUMINUM WINDOWS 085113 - 5
E. Adjust operating sashes and hardware for a tight fit at contact points and weather stripping for smooth operation and weathertight closure.
F. Clean exposed surfaces immediately after installing windows. Avoid damaging protective coatings and finishes. Remove excess sealants, glazing materials, dirt, and other substances.
G. Remove and replace glass that has been broken, chipped, cracked, abraded, or damaged during construction period.
END OF SECTION 085113
STORM SHUTTERS 08521 - 1
SECTION 08521 - ROLLING STORM SHUTTERS
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes retractable rolling storm shutters.
1.2 ALUMINUM STORM SHUTTER PERFORMANCE REQUIREMENTS
A. Shutters shall meet requirements of and be an approved product of TDI.
1.3 SUBMITTALS
A. Product Data: For each type of storm shutter indicated.
B. Shop Drawings: Include plans, elevations, sections, details, hardware, attachments to other Work, and operational clearances.
C. Product test reports.
D. Maintenance data.
1.4 QUALITY ASSURANCE
A. Installer: A qualified installer, with two years’ experience or approved by manufacturer to install manufacturer's products.
B. Storm Shutters shall be an approved product of the Texas Department of Insurance
(TDI).
1.5 WARRANTY
A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace aluminum storm shutters that fail in materials and workmanship within two years from date of Substantial Completion.
STORM SHUTTERS 08521 - 2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
2.2 ALUMINUM STORM SHUTTER MANUFACTURER: Rollac Shutter of Texas, Inc., or product of approved equal.
A. Provide for windows openings as shown on drawings.
2.3 STORM SHUTTER FABRICATION:
A. General: Product shall be approved by TDI latest edition, and meeting windstorm criteria of IBC/IRC, and large missile impact.
B. Product basis is Rollac SecuraMax RLL3 using aluminum alloy 6063-T5 with 1.4 mm wall gauge or equal
C. Rollup Mechanism: Manual operation gear with rollup crank and counter balance from inside building.
D. Housing Assembly: Aluminum housing .040” gauge minimum, 45 Degree style.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install storm shutters according to TDI Building Code for Windstorm Resistant Construction and manufacturers’ instructions.
3.2 FIELD QUALITY CONTROL
A. Operate storm shutters to demonstrate compliance with referenced standards.
B. Manufacturer’s representative shall operate storm shutters and verify compliance with manufacturer’s standards and proper functioning.
C. Remove and replace storm shutters where results indicate that they do not comply with specified requirements.
D. Additional testing and inspecting, at Contractor's expense, will be performed to determine compliance of replaced or additional work with specified requirements.
STORM SHUTTERS 08521 - 3
END OF SECTION 08521
| 08513 SF - Aluminum Windows.pdf |
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section includes aluminum windows for exterior locations. |
| 1.2 ACTION SUBMITTALS |
| A. Product Data: For each type of product. |
| B. Shop Drawings: Include plans, elevations, sections, hardware, accessories, insect screens, operational clearances, and details of installation, including anchor, flashing, and sealant installation. |
| C. Samples: For each exposed product and for each color specified. |
| 1.3 INFORMATIONAL SUBMITTALS |
| A. Product test reports. |
| B. Sample warranties. |
| 1.4 WARRANTY |
| A. Manufacturer's Warranty: Manufacturer agrees to repair or replace aluminum windows that fail in materials or workmanship within specified warranty period. |
| 1. Warranty Period: |
| a. Window: 10 years from date of Substantial Completion. |
| b. Glazing Units: 10 years from date of Substantial Completion. |
| c. Aluminum Finish: 10 years from date of Substantial Completion. |
| PART 2 - PRODUCTS |
| 2.1 WINDOW PERFORMANCE REQUIREMENTS |
| A. Product Standard: Comply with AAMA/WDMA/CSA 101/I.S.2/A440 for definitions and minimum standards of performance, materials, components, accessories, and fabrication unless more stringent requirements are indicated. |
| 1. Window Certification: AAMA certified with label attached to each window. |
| B. Performance Class and Grade: AAMA/WDMA/CSA 101/I.S.2/A440 as follows: |
| 1. Minimum Performance Class: LC. |
| 2. Minimum Performance Grade: 25. |