Attach-2-Specifications.pdf

PDF 990 KB Posted

Attached to
GA-WASSAW NWR EXPEDITE BULKHEAD WINGWALL
Solicitation number
140F0121R0012
Issued by

About this file

This document provides specifications for replacing bulkhead wingwalls at Wassaw National Wildlife Refuge in Georgia. The project requires furnishing and installing treated timber piles, pile caps, sheeting, and related materials. Piles must be southern pine treated to Marine Use standards. Work includes clearing, excavation, backfilling, and final grading. The contractor must provide pile driving equipment, jetting or predrilling if needed, and complete as-built surveys. Testing will include pile material properties, preservative treatment, and in-place densities. The specifications provide requirements for submittals, handling and storage, fastening, repairs, disposal, and recordkeeping.

View the file

Other files

File Type Posted
Attach-5-DBA Min. Wage Rates.pdf PDF
Attach-1-Drawings.pdf PDF
Sol_140F0121R0012.pdf PDF
Attach-4-Past Perfoemance and Clause.pdf PDF
Attach-3-Price Sheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR CONSTRUCTION

SPECIFICATIONS

Replace Bulkhead Wingwalls

Wassaw National Wildlife Refuge South Atlantic-Gulf & Mississippi Basin Region

Contract Number: 140F0418D0001

Work Order: 2019326237

Asset Number: 10070072

Program Year: FY2021

APRIL 6, 2021

Replace Bulkhead Wingwalls Wassaw NWR, Chatham County, GA

THIS PAGE INTENTIONALLY LEFT BLANK

PROFESSIONAL SEALS

PROFESSIONAL SEALS

1.1 DESIGN PROFESSIONALS OF RECORD

A. Civil Engineer:

1. Fred A. Halterman

2. Georgia #031813

3. Responsible for Divisions 02-31.

-- End of Section –-

PROJECT TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01009 GENERAL INFORMATION AND REQUIREMENTS

SUBMITTAL REGISTER

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 62 19.13 TIMBER MARINE PILES

31 62 20 TIMBER BULKHEAD COMPONENTS

31 62 30 ECP HELICAL TORQUE ANCHOR TIEBACK SYSTEMS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 01009 Page 1

SECTION 01009

GENERAL INFORMATION AND REQUIREMENTS

PART 1 GENERAL

1.1 SUMMARY

A. Description of Work:

The work shall consist of labor, equipment, supplies and materials, to replace the bulkhead wingwalls at the North and South ends of the existing timber bulkhead to stabilize the structure and provide shoreline protection and all other items as shown on the drawings, in the specifications, and required for a complete installation.

B. Location:

Work under this contract is located at Wassaw National Wildlife Refuge

(NWR) located on Wassaw Island in Chatham County, Georgia near Savannah.

Watercraft transportation will be required to this location and responsibility of the contractor. The Refuge will not provide transportation for the Contractor and their personnel.

C. Site Visit:

Contractors are encouraged to visit the project site and inspect existing conditions prior to submitting proposals. See Federal Acquisition

Regulation (FAR) clause 52.236-27 Site Visit. Contact Refuge Manager &

Site Representative Russell Webb, 912-313-1366, to arrange a site visit.

1.2 REFERENCES

Referenced Standards are listed in other sections of the specifications and on the drawings.

1.3 DEFINITIONS

Approvals: Approval of submittals is an indication that the Contractor’s submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer’s Representative (COR) attention in writing.

1.4 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS

A. All work shall comply with codes and standards applicable to each type of work and as listed in individual subdivisions.

1. Where a conflict occurs between reference documents and the project specifications, the project specifications govern.

2. Where a conflict occurs between reference documents, the document containing the most stringent requirements governs.

3. Where reference documents are not specified by the date, the current document published as of the date set for receipt of proposals applies.

4. Materials, applications and tests specified by reference to published standards of a society, association, code or other published standard are included in the Specifications as if written in their entirety.

5. Georgia Department of Transportation specifications shall be used

SECTION 01009 Page 2 as a supplement where the main project specifications do not apply to a standard that is not included in the project specifications.

B. Federal Specifications

1. Except as provided otherwise by these Specifications or their accompanying Drawings, the Standard Federal Specifications given in the Technical Specifications shall govern in all cases where reference to Standard Federal Specifications is made.

2. The Contractor shall take special care to refer to the Standard

Federal specifications and to all modifications thereof in requests for quotations, in orders, and in subcontracts.

C. ASTM Specifications

1. Copies of the "American Society for Testing and Materials" specifications referred to herein may be obtained for a nominal charge by contacting the Society at:

AMERICAN SOCIETY FOR TESTING AND MATERIALS

1916 Race Street

Philadelphia, Pennsylvania 19103

2. Products and processes included in the Specifications shall conform to the manufacturer's latest published specifications.

3. Upon request of the Contracting Officer, Contractor shall provide a sworn affidavit from the manufacturer certifying that material, products and processes delivered and used on the project meet the specified requirements. Affidavit shall not relieve the Contractor from his responsibility for full compliance with the requirements of the Specifications.

1.5 ABBREVIATIONS

A. Abbreviations used throughout the specifications and the organization or document represented are:

AASHTO American Association of State Highway and Transportation

Officials

ACI American Concrete Institute

ALSC American Lumber Standards Committee

APA American Plywood Association

ASME American Society of Mechanical Engineers

ASTM American Society for Testing and Materials

AWPB American Wood Preservers Bureau

AWPI American Wood Preservers Institute

AWS American Welding Society

AWWA American Water Works Association

CRSI Concrete Reinforcing Steel Institute

CS Commercial Standards of United States Department of

Standards

CSI Construction Specifications Institute

FS Federal Specifications

FTMS Federal Test Method Standard

GDOT Georgia Department of Transportation

NAAMM National Association of Architectural Metal

Manufacturers

NBC National Building Code

NBFU National Bureau of Fire Underwriters

SECTION 01009 Page 3

NBS National Bureau of Standards

NCMA National Concrete Masonry Association

NEC National Electrical Code

NEMA National Electrical Manufacturers Association

NFPA National Fire Protection Association

NFoPA National Forest Products Association

NPC National Plumbing Code

NRCA National Roofing Contractors Association

NRMCA National Ready Mixed Concrete Association

OSHA Occupational Safety and Health Administration

PCA Portland Cement Association

SMACNA Sheet Metal and Air Conditioning Contractors National

Association

SBC Standard Building Code

SPC Standard Plumbing Code

SPI Steel Products Institute

SPR Simplified Practice Recommendation

SSPC Steel Structures Painting Council

UL Underwriters Laboratories

USAS United States of America Standards

WWPA Western Wood Products Association

B. Additional abbreviations will be defined as they appear in the specifications or on the drawings.

1.6 MEANS AND METHODS

A. Means and methods of construction are solely the responsibility of the

Contractor and shall be such as the Contractor or his subcontractors may choose; subject, however, to the Contracting Officer's right to reject means and methods proposed which, in his opinion:

1. Constitute a hazard to the work, persons or property.

2. Will not produce finished work in accordance with terms of the

Contract.

3. Are contrary to specified means or methods included in the Contract.

B. The right to reject means and methods of Contractor or subcontractor shall not be construed or interpreted as acceptance of control of means and methods by the Contracting Officer.

C. The Contracting Officer's approval or failure to exercise right to reject means and methods will not relieve the Contractor of his obligation to complete the work required by the Contract.

D. Total responsibility for control of means and methods lies with the

Contractor for all work.

1.7 SUBMITTALS

A. Scope: Submittals include shop drawings, manufacturers’ literature, as-built drawings, warranty information, samples, work schedules, safety plan and others as defined by the drawings and specifications.

B. Requirements: Refer to specifications for submittals required. Allow at least 10 working days for FWS review. Submittals shall be delivered to the Contracting Officer’s Representative as electronic submittals via email to Christina_Sorrels@fws.gov.

mailto:Christina_Sorrels@fws.gov

SECTION 01009 Page 4

The Contractor shall review and approve all submittals required under the Contract. Submittals that do not indicate the contractor's review and approval will be returned without review. Submittals shall come directly from the contractor with their stamp and signature of approval;

submittals will not be accepted from sub-contractors or suppliers.

Do not commence work which requires review of any submittals until receipt of returned submittals with an acceptable action. Do not allow submittals without an acceptable action marking to be used for the project.

C. Identification of Submittals: A cover sheet will be provided for all submittal transmittals. Completely identify each submittal by showing at least the following information:

1. Name and address of submitter (Contractor), plus name and telephone number of the individual to contact for further information.

2. Name of project as it appears in these specifications.

3. Contract number, submittal number, and specification section number to which the submittal applies.

4. Whether this is an original submittal or resubmittal.

5. Each item shall clearly note the manufacturer’s name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.

D. Submit on items as called for in the specifications, and renovation items listed on the drawings.

E. Electronic Submittals: Electronic submittals are required. Submit just one electronic copy to the COR who will then distribute submitted documents electronically after review.

F. Conformance: Submittals must show clearly that the product, sample or shop drawing conforms to the specifications.

1.8 QUALITY ASSURANCE

A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This contract incorporates materials, applications, and tests by reference, with the same force and effect as if they were given in full text.

B. Conflict: Where a conflict occurs between reference documents, drawings, and specifications, the drawings shall govern.

1.9 DELIVERY, STORAGE, AND HANDLING

A. Delivery: Protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer’s name, brand designation, and contents legibly indicated. The containers shall bear the referenced specification number, type, and class as applicable.

B. Storage: Provide temporary storage facilities for products. Storage shall comply with the manufacturer’s instructions. The storage area shall permit access for inspection and handling.

SECTION 01009 Page 5

C. Handling: Load and unload products protecting them from damage.

1.10 PROJECT/SITE CONDITIONS

A. The project site is at an active Fish and Wildlife National Refuge. Work areas shall be roped off to alert unauthorized personnel to work in progress.

B. Existing property not indicated for demolition, shall be protected. All damage by Contractor’s activities shall be repaired by the Contractor at no additional cost to the Government.

C. Safety is paramount. Contractor is responsible for safety on the project site and shall take measures to maintain a safe area around the project site which is used by Government employees and the public. Applicable

OSHA regulations shall be adhered to by the Contractor. Contractor shall submit a safety plan prior to starting work.

D. Landscape Protection: Protect all vegetation inside and outside work limits. All rutting caused by Contractor activities shall be filled and contoured to match adjacent areas. Areas damaged by Contractor activities shall be repaired at his own expense.

E. Environmental Protection: The Contractor shall prevent, abate and control all environmental pollution arising from construction activities by complying with all applicable Federal, State and local laws and regulations concerning environmental pollution control and abatement, as well as the specified requirements in this Contract. It is the responsibility of the Contractor to have subcontractors comply with this requirement.

F. Fossils and Artifacts: Should the Contractor discover any fossils or artifacts during construction operations, such objects shall become the property of the Government. The Contractor shall cease construction operations in the area of the "find" and immediately notify the

Contracting Officer of such discovery. Construction operations may proceed in other areas not affected by this clause. Care shall be exercised by the Contractor so as not to damage fossils or artifacts uncovered during excavation operations.

G. Prevention of Water Pollution:

1. The Contractor shall comply with applicable Federal, State and local laws and regulations concerning the control and abatement of water pollution.

2. The Contractor shall be responsible for controlling erosion, sedimentation and turbidity (muddy water) in waters which may violate water quality standards. Some common methods of stabilization and turbidity control include hay bales, silt fencing, grassing, marine-type turbidity screens, and timber work platforms.

Contractor shall deploy, where necessary, control devises of a design and method effective in maintaining all water standards.

3. The Contractor's construction activities shall be performed by methods that will prevent entrance or accidental spillage of solid matter, contaminants, debris and/or other objectionable pollutants and wastes into rivers, streams, flowing or dry watercourses, lakes, ponds, and underground water sources. The Contractor shall dispose

SECTION 01009 Page 6 of all pollutants such as petroleum products, hazardous chemicals, rubbish, cement, concrete, etc., by properly handling and hauling the material away in tanks, barrels or other suitable containers to an approved disposal site.

4. Sanitary facilities, such as chemical toilet, shall be located far enough from Wassaw Creek to prevent pollution of the water.

5. Dewatering work for structure foundations or earthwork operations adjacent to, or encroaching on, streams or watercourses shall be conducted in a manner to prevent muddy water and eroded materials from entering the rivers, streams, lakes or watercourses by construction of intercepting ditches, bypass channels, barriers, settling ponds or by other approved means. Excavated material shall not be deposited or stored in, or alongside of, watercourses where it can be washed away by high water or storm runoff.

6. Waste waters from aggregate processing, concrete batching, concrete waste or other construction operations shall not enter streams, watercourses or other surface waters.

H. Abatement of Air Pollution:

1. The Contractor shall comply with applicable Federal, State and local laws and regulations concerning the prevention and control of air pollution.

2. Construction activities shall be performed in such a manner that air pollution is held to a minimum.

3. Burning of materials, trees and brush, combustible construction materials and rubbish will be permitted only if it is approved by the

Contracting Officer and properly permitted by Federal, State, and local regulatory agencies, and when atmospheric conditions for burning are considered favorable by appropriate State or local air pollution or fire authorities.

4. Where open burning is permitted, burn piles shall be properly constructed to minimize smoke. In no case shall unapproved materials, such as tires, plastics, rubber products, asphalt products or other materials that create heavy black smoke or nuisance odors, be burned.

5. All construction areas, access or haul roads, parking areas and storage areas used during construction shall be managed by application of dust inhibitors or by sprinkling with water to suppress dust formation in accordance with Federal, State, and local regulatory agencies.

I. Noise Abatement: Construction activities shall be performed in such a manner that the noise level is minimal. All equipment and operation of equipment shall meet with all Federal, State, and local regulations. All equipment shall be equipped with mufflers or other noise abatement devices approved by the Contracting Officer.

J. Environmental Litigation: No time lost due to work stoppage because of failure of Contractor to comply with these requirements or other environmental regulations may be the subject of a claim for extension of time or for costs or damages, unless it is later determined that the

Contractor was in compliance.

1.12 SEQUENCING AND SCHEDULING

A. A bar chart type work schedule shall be submitted at the pre-work conference. When requested, submit an updated schedule within 3 calendar days.

SECTION 01009 Page 7

PART 2 PRODUCTS

2.1 TEMPORARY FACILITIES

A. Install self-contained single occupant toilet units of the chemical aerated, recirculation, or combustion type, properly vented and fully enclosed with a glass fiber reinforced polyester shell or similar nonabsorbent material. Maintain toilet units on a regular basis to provide sanitary condition. Provide containerized, tap-dispenser, bottled-water drinking-water units, including paper cup supply.

B. There is no water available on site for Contractor’s use.

C. There is no electric power available on site for Contractor’s use.

PART 3 EXECUTION

3.1 PROJECT MEETINGS

A. Preconstruction Conference:

1. A preconstruction conference will be held prior to the start of work.

The Contractor will be notified in advance of meeting time, date and place. The purpose of the meeting will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.

2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.

3. The Contractor shall submit a schedule of values at the preconstruction meeting, which may be used as a basis of payment as the work progresses.

B. Progress Meetings: To be held at the project site as required.

C. Inspections:

1. Routine inspections will be performed by the government Site Representative (SR). Inspection of items of work by the SR will not relieve the Contractor of the requirement to meet project specifications. The SR shall be informed 24 hours in advance of work requiring his observation. After being informed in advance, the SR’s non-attendance shall not prohibit the Contractor from proceeding with work in the SR’s absence.

2. For final inspection, notify the COR in writing at least 6 working days before the completion date so the Government can schedule final inspection. The superintendent shall be present during the final inspection.

3.2 DISPOSAL OF DEBRIS

Demolition debris shall be removed from the project site and disposed of in a legal disposal site by the Contractor. Contractor shall pay all fees required for disposal.

3.3 AS-BUILT DRAWINGS

As the job progresses, continuously maintain as-built drawings of the work.

The changes shall be noted legibly in red pencil or red ink. These drawings shall be submitted to the COR prior to final inspection. Should final

SECTION 01009 Page 8 inspection reveal changes in the Project not so noted on the As-Built

Drawings, the Contractor shall record these changes on the As-Built Drawings within 3 working days of Final Inspection and deliver completed As-Built

Drawings to the COR.

3.4 WARRANTY

A. All project construction shall be provided with a one-year warranty in accordance with FAR 52.246-21.

B. With respect to warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the contract, the

Contractor shall

1. Obtain the most favorable warranties that would be given by the Contractor in normal commercial practices, but in no case less than called for by the specifications

2. Require warranties to be executed, in writing, for the benefit of the Government.

3. Submit warranties to the COR prior to the final inspection.

PART 4 MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

The work described in this section will not be measured for payment.

4.2 BASIS OF PAYMENT

Payment will be made at the contract price, as indicated in the contractor's approved Schedule of Values and will include full compensation for the work described in the contract.

4.3 PAYMENT REQUESTS

A. The Contractor will submit the progress/final payment request and obtain

CI review of the progress amount being submitted for the actual work completed. The progress/final payment request is signed by the SR. The

SR will send the invoice back to the Contractor. The Contractor will then submit the payment through the Internet Payment Platform (IPP)

System, including the Schedule of Values and any additional attachments.

Once processed through the IPP System, the payment request will be approved by the Contracting Officer for payment.

B. The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131. If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the contracting officer.

C. For progress payments, Contractor shall submit signed Invoice based on

Schedule of Values, signed “Contractor Payment Certification,” and

Certified Payrolls. Final payment request shall include these forms plus a Release of Claims form.

-- End of Section --

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 2 PAGES

140F0418D0001

FWS Wassaw Bulkhead

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.8Existing Conditions

31 00 00 SD-01 Preconstruction Submittals

3.5 GShoring

1.4.1 GDewatering Work Plan

SD-03 Product Data

3.8Utilization of Excavated Materials

3.4Opening of any Excavation or

Borrow Pit

SD-06 Test Reports

3.15Testing

SD-07 Certificates

3.15Testing

31 05 19 SD-03 Product Data

2.1Manufacturing Quality Control

Sampling and Testing

SD-04 Samples

3.1Quality Assurance Tests

31 62 19.13 SD-03 Product Data

2.1.1 GPiles

3.1.1 GPile Driving Equipment

2.1.5 GPile Caps

2.1.4 GPile Shoes

3.1.5 GJetting

3.1.7 GPredrilling

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 2 PAGES

140F0418D0001

FWS Wassaw Bulkhead

31 62 19.13 SD-06 Test Reports

1.4.1 GPreservative Treatment

1.4.3 GDelivery Inspection List

SD-07 Certificates

1.4.2 GSDS and CIS

1.4.4 GPesticide Applicator

1.4.5 GBest Management Practices

(BMPs)

SD-11 Closeout Submittals

3.1.2.3 GPile Driving Records

3.1.2.4 GAs-Driven Pile Survey

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

31 62 20 Bulkhead Hardware & Sheeting 2.3 G 31 62 30 Installation Plan

Torque Monitoring Device Documentation

Material Submittal G

G G

G 1.2

3.2 4.6.2.5

2.1.6

SECTION 02 41 00

DEMOLITION AND DECONSTRUCTION

05/10

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes

AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

1.2 PROJECT DESCRIPTION

1.2.1 Definitions

1.2.1.1 Demolition

Demolition is the process of wrecking or taking out any load-supporting structural member of a facility together with any related handling and disposal operations.

1.2.1.2 Deconstruction

Deconstruction is the process of taking apart a facility with the primary goal of preserving the value of all useful building materials.

1.2.1.3 Demolition Plan

Demolition Plan is the planned steps and processes for managing demolition activities and identifying the required sequencing activities and disposal mechanisms.

1.2.1.4 Deconstruction Plan

Deconstruction Plan is the planned steps and processes for dismantling all or portions of a structure or assembly, to include managing sequencing activities, storage, re-installation activities, salvage and disposal mechanisms.

SECTION 02 41 00 Page 1

1.2.2 Demolition/Deconstruction Plan

Prepare a Demolition Plan and submit proposed salvage, demolition, deconstruction, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress. Plan shall be approved by Contracting Officer prior to work beginning.

1.2.3 General Requirements

Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations. The work includes demolition, deconstruction, salvage of identified items and materials, and removal of resulting rubbish and debris. Remove rubbish and debris from Government property daily, unless otherwise directed. Store materials that cannot be removed daily in areas specified by the Contracting Officer.

1.3 ITEMS TO REMAIN IN PLACE

Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair or replace damaged items as approved by the Contracting Officer.

Coordinate the work of this section with all other work indicated.

Construct and maintain shoring, bracing, and supports as required.

1.3.1 Existing Construction Limits and Protection

Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas.

1.3.2 Trees

Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place.

Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.

1.3.3 Utility Service

Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor.

1.4 BURNING

The use of burning or burial at the project site for the disposal of refuse and debris will not be permitted.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When

SECTION 02 41 00 Page 2 used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following:

SD-01 Preconstruction Submittals

Demolition Plan; G Existing Conditions

1.6 PROTECTION

1.6.1 Protection of Personnel

Before, during and after the demolition and deconstruction work continuously evaluate the condition of the structure being demolished or deconstructed and take immediate action to protect all personnel working in and around the project site. No area, section, or component of floors, roofs, walls, columns, pilasters, or other structural element will be allowed to be left standing without sufficient bracing, shoring, or lateral support to prevent collapse or failure while workmen remove debris or perform other work in the immediate area.

1.7 RELOCATIONS

Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.

1.8 EXISTING CONDITIONS

Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions.

PART 2 PRODUCTS

2.1 FILL MATERIAL

a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures.

b. Fill material shall conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.

c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:

Soil classification AASHTO M 145

SECTION 02 41 00 Page 3

Moisture-density relations AASHTO T 180 , Method B or D

PART 3 EXECUTION

3.1 CONCURRENT EARTH-MOVING OPERATIONS

Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition or deconstruction work in areas occupied by structures to be demolished or deconstructed until all demolition and deconstruction in the area has been completed and debris removed. Fill holes and other hazardous openings.

3.2 DISPOSITION OF MATERIAL

3.2.1 Title to Materials

Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition and deconstruction, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.

3.3 CLEANUP

Remove debris and rubbish from excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas.

Apply local regulations regarding hauling and disposal.

3.4 DISPOSAL OF REMOVED MATERIALS

3.4.1 Regulation of Removed Materials

Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified.

3.4.2 Removal from Government Property

Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.

-- End of Section --

SECTION 02 41 00 Page 4

SECTION 31 00 00

EARTHWORK

08/08

PART 1 GENERAL

1.1 CRITERIA FOR BIDDING

Lump Sum bids on the following criteria:

a. Surface elevations are as indicated.

b. Pipes or other artificial obstructions, except those indicated, will not be encountered.

c. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction.

d. Ground water elevation is 8 feet below existing surface elevation.

e. Geotechnical Report is for Information Only. Contractor is responsible for their own Geotechnical investigation if further data is needed for the project.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test

ASTM INTERNATIONAL (ASTM)

ASTM C136/C136M (2019) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM D698 (2012; E 2014; E 2015) Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/cu. ft.

(600 kN-m/cu. m.))

SECTION 31 00 00 Page 1

ASTM D1140 (2017) Standard Test Methods for Determining the Amount of Material Finer than 75-µm (No. 200) Sieve in Soils by Washing

ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and Unit Weight of Soil in Place by Sand-Cone Method

ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)

ASTM D2167 (2015) Density and Unit Weight of Soil in Place by the Rubber Balloon Method

ASTM D2434 (1968; R 2006) Permeability of Granular Soils (Constant Head)

ASTM D2487 (2017; E 2020) Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System)

ASTM D2937 (2017; E 2017; E 2018) Standard Test Method for Density of Soil in Place by the Drive-Cylinder Method

ASTM D4318 (2017; E 2018) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils

ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth)

1.3 DEFINITIONS

1.3.1 Satisfactory Materials

Satisfactory materials comprise any materials classified by ASTM D2487 as

GW, GP, GM, GP-GM, GW-GM, GC, GP-GC, GM-GC, SW, SP, SM, SW-SM, SC, SW-SC,

SP-SM, SP-SC. Satisfactory materials for grading comprise stones less than 2 inches.

1.3.2 Unsatisfactory Materials

Materials which do not comply with the requirements for satisfactory materials are unsatisfactory. Unsatisfactory materials also include man-made fills; trash; refuse; backfills from previous construction; and material classified as satisfactory which contains root and other organic matter or frozen material. Notify the Contracting Officer when encountering any contaminated materials.

1.3.3 Cohesionless and Cohesive Materials

Cohesionless materials include materials classified in ASTM D2487 as GW, SECTION 31 00 00 Page 2

GP, SW, and SP. Cohesive materials include materials classified as GC, SC, ML, CL, MH, and CH. Materials classified as GM and SM will be identified as cohesionless only when the fines are nonplastic. Perform testing, required for classifying materials, in accordance with ASTM D4318, ASTM C136/C136M and ASTM D1140.

1.3.4 Degree of Compaction

Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the 3/4 inch sieve, express the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve as a percentage of the maximum density in accordance with AASHTO T 180 and corrected with AASHTO T 224 . To maintain the same percentage of coarse material, use the "remove and replace" procedure as described in NOTE 8 of Paragraph 7.2 in AASHTO T 180 .

1.3.5 Topsoil

Material suitable for topsoils obtained from offsite areas, excavations, or areas indicated on the drawings is defined as: Natural, friable soil representative of productive, well-drained soils in the area, free of subsoil, stumps, rocks larger than one inch diameter, brush, weeds, toxic substances, and other material detrimental to plant growth. Amend topsoil pH range to obtain a pH of 5.5 to 7.

1.3.6 Select Granular Material

1.3.6.1 General Requirements

Select granular material consist of materials classified as GW, GP, SW, or SP, by ASTM D2487 where indicated. The liquid limit of such material must not exceed 35 percent when tested in accordance with ASTM D4318. The plasticity index must not be greater than 12 percent when tested in accordance with ASTM D4318, and not more than 35 percent by weight may be finer than No. 200 sieve when tested in accordance with ASTM D1140.

Provide a minimum coefficient of permeability of 0.002 feet per minute when tested in accordance with ASTM D2434.

1.3.7 Initial Backfill Material

Initial backfill consists of select granular material or satisfactory materials free from rocks 2 inches or larger in any dimension or free from rocks of such size as recommended by the pipe manufacturer, whichever is smaller. When the pipe is coated or wrapped for corrosion protection, free the initial backfill material of stones larger than 2 inches in any dimension or as recommended by the pipe manufacturer, whichever is smaller.

1.4 SYSTEM DESCRIPTION

Subsurface soil boring logs are shown on the drawings. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations.

SECTION 31 00 00 Page 3

1.4.1 Dewatering Work Plan

Submit procedures for accomplishing dewatering work as noted on Plan Sheet C-001, Note 41. Submit Dewatering Work Plan for Contracting Officer approval. This plan must include as a minimum requirement the following:

sump containment type, pumping method, expected dewatering time during operations, and the design certified by a registered professional engineer.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following:

SD-01 Preconstruction Submittals

Shoring; G Dewatering Work Plan; G

SD-03 Product Data

Utilization of Excavated Materials Opening of any Excavation or Borrow Pit

SD-06 Test Reports

Testing

SD-07 Certificates

Testing

PART 2 PRODUCTS

2.1 MATERIAL FOR RIP-RAP

Provide Bedding material, Grout, Filter fabric, and rock conforming to Georgia DOT for construction indicated.

2.1.1 Bedding Material

Provide bedding material consisting of sand, gravel, or crushed rock, well graded, or poorly graded with a maximum particle size of 2 inches.

Compose material of tough, durable particles. Allow fines passing the No.

200 standard sieve with a plasticity index less than six.

2.1.2 Rock

Provide rock fragments sufficiently durable to ensure permanence in the structure and the environment in which it is to be used. Use rock fragments free from cracks, seams, and other defects that would increase the risk of deterioration from natural causes. Provide fragments sized so that no individual fragment exceeds a weight of 150 pounds and that no more than 10 percent of the mixture, by weight, consists of fragments weighing 2 pounds or less each. Provide rock with a minimum specific gravity of 2.50. Do not permit the inclusion of more than 1 percent quantities of dirt, sand, clay, and rock fines.

SECTION 31 00 00 Page 4

PART 3 EXECUTION

3.1 STRIPPING OF TOPSOIL

Where indicated or directed, strip topsoil to a depth of 4 inches. Spread topsoil on areas already graded and prepared for topsoil, or transported and deposited in stockpiles convenient to areas that are to receive application of the topsoil later, or at locations indicated or specified.

Keep topsoil separate from other excavated materials, brush, litter, objectionable weeds, roots, stones larger than 2 inches in diameter, and other materials that would interfere with planting and maintenance operations. Stockpile topsoil in the areas shown on the plans.

3.2 GENERAL EXCAVATION

Perform excavation of every type of material encountered within the limits of the project to the lines, grades, and elevations indicated and as specified. Perform the grading in accordance with the typical sections shown and the tolerances specified in paragraph FINISHING. Transport satisfactory excavated materials and place in fill or embankment within the limits of the work. Excavate unsatisfactory materials encountered within the limits of the work below grade and replace with satisfactory materials as directed. Include such excavated material and the satisfactory material ordered as replacement in excavation. Dispose surplus satisfactory excavated material not required for fill or embankment in areas approved for surplus material storage or designated waste areas. Dispose unsatisfactory excavated material in designated waste or spoil areas. During construction, perform excavation and fill in a manner and sequence that will provide proper drainage at all times.

Excavate material required for fill or embankment in excess of that produced by excavation within the grading limits from the borrow areas indicated or from other areas as approved by the Contracting Officer.

3.2.1 Dewatering

Control groundwater flowing toward or into excavations to prevent sloughing of excavation slopes and walls, boils, uplift and heave in the excavation and to eliminate interference with orderly progress of construction. Do not permit French drains, sumps, ditches or trenches within 3 feet of the foundation of any structure, except with specific written approval, and after specific contractual provisions for restoration of the foundation area have been made. Take control measures by the time the excavation reaches the water level in order to maintain the integrity of the in situ material.

3.2.2 Trench Excavation Requirements

3.2.2.1 Removal of Unyielding Material

Where overdepth is not indicated and unyielding material is encountered in the bottom of the trench, remove such material 6 inches below the required grade and replaced with suitable materials as provided in paragraph

BACKFILLING AND COMPACTION.

3.2.2.2 Removal of Unstable Material

Where unstable material is encountered in the bottom of the excavation, remove such material to the depth directed and replace it to the proper grade with select granular material as provided in paragraph BACKFILLING

SECTION 31 00 00 Page 5

AND COMPACTION. When removal of unstable material is required due to the Contractor's fault or neglect in performing the work, the Contractor is responsible for excavating the resulting material and replacing it without additional cost to the Government.

3.2.3 Structural Excavation

Ensure that footing subgrades have been inspected and approved by the Contracting Officer prior to concrete placement. Excavate to bottom of pile cap prior to placing or driving piles, unless authorized otherwise by the Contracting Officer. Backfill and compact over excavations and changes in grade due to pile driving operations to 95 percent of ASTM D698 maximum density.

3.3 SELECTION OF BORROW MATERIAL

Select borrow material to meet the requirements and conditions of the particular fill or embankment for which it is to be used. Obtain borrow material from the borrow areas shown on the plans. Unless otherwise provided in the contract, the Contractor is responsible for obtaining the right to procure material, pay royalties and other charges involved, and bear the expense of developing the sources, including rights-of-way for hauling from the Government location. Borrow material from approved sources on Government-controlled land may be obtained without payment of royalties. Unless specifically provided, do not obtain borrow within the limits of the project site without prior written approval. Consider necessary clearing, grubbing, and satisfactory drainage of borrow pits and the disposal of debris thereon related operations to the borrow excavation.

3.4 OPENING AND DRAINAGE OF EXCAVATION AND BORROW PITS

Notify the Contracting Officer sufficiently in advance of the opening of any excavation or borrow pit or borrow areas to permit elevations and measurements of the undisturbed ground surface to be taken. Except as otherwise permitted, excavate borrow pits and other excavation areas providing adequate drainage. Transport overburden and other spoil material to designated spoil areas or otherwise dispose of as directed.

Provide neatly trimmed and drained borrow pits after the excavation is completed. Ensure that excavation of any area, operation of borrow pits, or dumping of spoil material results in minimum detrimental effects on natural environmental conditions.

3.5 SHORING

3.5.1 General Requirements

Submit a Shoring and Sheeting plan for approval 15 days prior to starting work. Submit drawings and calculations, certified by a registered professional engineer, describing the methods for shoring and sheeting of excavations. Finish shoring, including sheet piling, and install as necessary to protect workmen, banks, adjacent paving, structures, and utilities. Remove shoring, bracing, and sheeting as excavations are backfilled, in a manner to prevent caving.

3.6 GRADING AREAS

Where indicated, divide work into grading areas within which satisfactory excavated material will be placed in embankments, fills, and required backfills. Do not haul satisfactory material excavated in one grading

SECTION 31 00 00 Page 6 area to another grading area except when so directed in writing. Place and grade stockpiles of satisfactory materials as specified. Keep stockpiles in a neat and well drained condition, giving due consideration to drainage at all times. Clear, grub, and seal by rubber-tired equipment, the ground surface at stockpile locations; separately stockpile excavated satisfactory and unsatisfactory materials. Protect stockpiles of satisfactory materials from contamination which may destroy the quality and fitness of the stockpiled material. If the Contractor fails to protect the stockpiles, and any material becomes unsatisfactory, remove and replace such material with satisfactory material from approved sources.

3.7 GROUND SURFACE PREPARATION

3.7.1 General Requirements

Remove and replace unsatisfactory material with satisfactory materials, as directed by the Contracting Officer, in surfaces to receive fill or in excavated areas. Scarify the surface to a depth of 6 inches before the fill is started. Plow, step, bench, or break up sloped surfaces steeper than 1 vertical to 4 horizontal so that the fill material will bond with the existing material. When subgrades are less than the specified density, break up the ground surface to a minimum depth of 6 inches, pulverizing, and compacting to the specified density. When the subgrade is part fill and part excavation or natural ground, scarify the excavated or natural ground portion to a depth of 12 inches and compact it as specified for the adjacent fill.

3.7.2 Frozen Material

Do not place material on surfaces that are muddy, frozen, or contain frost. Finish compaction by sheepsfoot rollers, pneumatic-tired rollers, steel-wheeled rollers, or other approved equipment well suited to the soil being compacted. Moisten material as necessary to plus or minus 2 percent of optimum moisture to provide the moisture content that will readily facilitate obtaining the specified compaction with the equipment used.

3.8 UTILIZATION OF EXCAVATED MATERIALS

Dispose unsatisfactory materials removing from excavations into designated waste disposal or spoil areas. Use satisfactory material removed from excavations, insofar as practicable, in the construction of fills, embankments, subgrades, shoulders, bedding (as backfill), and for similar purposes. Submit procedure and location for disposal of unused satisfactory material. Submit proposed source of borrow material . Do not waste any satisfactory excavated material without specific written authorization. Dispose of satisfactory material, authorized to be wasted, in designated areas approved for surplus material storage or designated waste areas as directed. Clear and grub newly designated waste areas on Government-controlled land before disposal of waste material thereon. Do not dispose excavated material to obstruct the flow of any stream, endanger a partly finished structure, impair the efficiency or appearance of any structure, or be detrimental to the completed work in any way.

3.9 BACKFILLING AND COMPACTION

Place backfill adjacent to any and all types of structures, in successive horizontal layers of loose materia not more than 8 inches in depth.

Compact to at least 90 percent laboratory maximum density for cohesive materials or 95 percent laboratory maximum density for cohesionless

SECTION 31 00 00 Page 7 materials, to prevent wedging action or eccentric loading upon or against the structure. Backfill material must be within the range of -2 to +2 percent of optimum moisture content at the time of compaction.

Prepare ground surface on which backfill is to be placed and provide compaction requirements for backfill materials in conformance with the applicable portions of paragraphs GROUND SURFACE PREPARATION.

This is the start of the file's text. The full file is on GovTribe.