This document contains construction drawings and specifications for the rehabilitation of the Saratoga National Historical Park Battlefield Interpretive Experience, specifically addressing unforeseen water drainage issues at Tour Stop 7. The project is managed by the United States Department of the Interior, National Park Service, Denver Service Center.

The scope of work includes site preparation and demolition, removal of existing asphalt pavement and organic material, installation of erosion control measures, and comprehensive stormwater drainage infrastructure. Key deliverables encompass a drain basin with gravel cover, storm pipe system, typical storm pipe with lawn and pavement restoration, cobble rip rap foundations (3-foot and 6-inch depth conditions), asphalt pavement overlay with tack coat, turf restoration using 6-inch topsoil and seed, erosion control blankets with biodegradable netting, protection fencing, and compost filter socks. The contractor is responsible for archaeological monitoring, maintaining existing utilities, constructing temporary access routes, and coordinating with the Contracting Officer (CO). General construction requirements include hand-firing existing grades, blending new networkinto existing grades at limits of construction, restoring all disturbed surfaces, and final stabilization of all work areas. The project location is accessed via Route 32/142 from the Park South Construction access location, with coordination required for construction traffic on the Tour Road. Construction documents include eight detailed sheets covering existing conditions, site preparation and demolition, site development, and site details with specifications for materials, placement methods, and site-specific conditions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AutoCAD SHX Text

BASIC DATA:

AutoCAD SHX Text

STATE

AutoCAD SHX Text

NATIONAL PARK SERVICE

AutoCAD SHX Text

DENVER SERVICE CENTER

AutoCAD SHX Text

REGION

AutoCAD SHX Text

COUNTY

AutoCAD SHX Text

DEPARTMENT OF THE INTERIOR

AutoCAD SHX Text

UNITED STATES

AutoCAD SHX Text

LOCATION WITHIN PARK

AutoCAD SHX Text

NAME OF PARK

AutoCAD SHX Text

TITLE OF PROJECT

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

OF

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

AutoCAD SHX Text 1336078A

AutoCAD SHX Text

AutoCAD SHX Text 257238

AutoCAD SHX Text

REHABILITATE BATTLEFIELD INTERPRETIVE EXPERIENCE

AutoCAD SHX Text

TOUR STOP 7

AutoCAD SHX Text

UNITED STATES

AutoCAD SHX Text

NEW YORK

AutoCAD SHX Text

CONSTRUCTION DRAWINGS

AutoCAD SHX Text

SARATOGA NATIONAL HISTORICAL PARK

AutoCAD SHX Text

NORTHEAST

AutoCAD SHX Text

DRAWINGS NOT TO SCALE

AutoCAD SHX Text

AutoCAD SHX Text

UNFORESEEN WATER DRAINAGE AT TOUR STOP 7

AutoCAD SHX Text

LOCATION MAP

AutoCAD SHX Text REHABILITATE BATTLEFIELD INTERPRETIVE EXPERIENCE UNFORESEEN WATER DRAINAGE AT TOUR STOP 7

AutoCAD SHX Text

SHEET SHEET TITLE SHEET NO. SHEET NO.

AutoCAD SHX Text

SARATOGA NATIONAL HISTORICAL PARK

AutoCAD SHX Text

DRAWING INDEX:

AutoCAD SHX Text

SARATOGA SPRINGS

AutoCAD SHX Text I-87

AutoCAD SHX Text

RTE 4

AutoCAD SHX Text

SARATOGA NATIONAL HISTORICAL PARK

AutoCAD SHX Text

QUALITY DESIGN CERTIFICATION

AutoCAD SHX Text

OR

AutoCAD SHX Text

OR

AutoCAD SHX Text Development (Title I)

AutoCAD SHX Text Prepared in Accordance with Design

AutoCAD SHX Text by Design Development (Title I)

AutoCAD SHX Text Construction Drawing Not Preceded

AutoCAD SHX Text Approved by Superintendent on

AutoCAD SHX Text Variance from Design Development (Title I)

AutoCAD SHX Text Project Manager

AutoCAD SHX Text Drawing No.

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Sheet

AutoCAD SHX Text Mark

AutoCAD SHX Text

REVISION

AutoCAD SHX Text Date

AutoCAD SHX Text Initial

AutoCAD SHX Text

IMAGES: ..\BASES\X-AREA MAP.JPG; ..\BASES\X-SITE MAP.JPG;

AutoCAD SHX Text Save Date: 2/17/2025 8:56 AM2/17/2025 8:56 AM

AutoCAD SHX Text File Name: G:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C1 COVER.dwgG:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C1 COVER.dwg

AutoCAD SHX Text Plotted By: DUSTIN L. SMITHDUSTIN L. SMITH

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

TOUR STOP 7

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

C1 COVER SHEET

AutoCAD SHX Text

C2 GENERAL NOTES - 1

AutoCAD SHX Text

C4 EXISTING CONDITIONS PLAN

AutoCAD SHX Text

C5 SITE PREPARATION AND DEMOLITION PLAN

AutoCAD SHX Text

C6 SITE DEVELOPEMENT PLAN

AutoCAD SHX Text

C7 SITE DETAILS - 1

AutoCAD SHX Text

AutoCAD SHX Text

C8 SITE DETAILS - 2

AutoCAD SHX Text

SCHUYLERVILLE

AutoCAD SHX Text

STILLWATER

AutoCAD SHX Text

PARK MAP

AutoCAD SHX Text

C3 GENERAL NOTES - 2

www.

800-962-7962

Dig Safely.

New York

Dig With Care Respect the Marks Confirm Utility Response Wait The Required Time Call Before You Dig digsafelynewyork .org

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

AutoCAD SHX Text 1336078A

AutoCAD SHX Text

AutoCAD SHX Text 257238

AutoCAD SHX Text REHABILITATE BATTLEFIELD INTERPRETIVE EXPERIENCE UNFORESEEN WATER DRAINAGE AT TOUR STOP 7

AutoCAD SHX Text

TRL

AutoCAD SHX Text

DLS

AutoCAD SHX Text

TRL

AutoCAD SHX Text 2/14/2025

AutoCAD SHX Text Save Date: 2/17/2025 9:57 AM2/17/2025 9:57 AM

AutoCAD SHX Text File Name: G:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C2 GEN NOTES - 1.dwgG:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C2 GEN NOTES - 1.dwg

AutoCAD SHX Text Plotted By: DUSTIN L. SMITHDUSTIN L. SMITH

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

GENERAL NOTES - 1

AutoCAD SHX Text

AutoCAD SHX Text C2

AutoCAD SHX Text

XREFS: ..\BASES\X-TITLE.DWG;

AutoCAD SHX Text

1. THE SARATOGA NATIONAL HISTORIC PARK IS A SITE OF NATIONAL THE SARATOGA NATIONAL HISTORIC PARK IS A SITE OF NATIONAL SIGNIFICANCE. A HIGH STANDARD OF CARE SHALL BE EXERCISED BY THE CONTRACTOR DURING CONSTRUCTION OPERATIONS TO ENSURE THE PROTECTION OF THIS RESOURCE. 2. THE SARATOGA NATIONAL HISTORIC PARK SITE WILL BE OPEN FOR THE SARATOGA NATIONAL HISTORIC PARK SITE WILL BE OPEN FOR SCHEDULED EVENTS AND GENERAL USE DURING CONSTRUCTION. APPROPRIATE SECURITY MEASURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 3. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE FOLLOWING UTILITY THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE FOLLOWING UTILITY LOCATING REQUIREMENTS: A. LOCATIONS, EXTENT, AND SIZES OF OVERHEAD AND LOCATIONS, EXTENT, AND SIZES OF OVERHEAD AND UNDERGROUND UTILITIES AND SUBSTRUCTURES HAVE BEEN DETERMINED FROM RECORD MAPPING INFORMATION, AND SUPPLEMENTED BY DATA OBTAINED IN THE FIELD. THE ACCURACY OF THIS UTILITY DATA IS NOT GUARANTEED, NOR IS THERE ANY GUARANTEE THAT ALL EXISTING UTILITIES AND SUBSTRUCTURES, WHETHER FUNCTIONAL OR ABANDONED, ARE SHOWN ON THE SURVEY. B. THE CONTRACTOR SHALL CONTACT DIG SAFELY NEW YORK (800) THE CONTRACTOR SHALL CONTACT DIG SAFELY NEW YORK (800) 962-7962 AND THE PROPER LOCAL AUTHORITIES OR RESPECTIVE UTILITY COMPANY HAVING JURISDICTION TO CONFIRM THE LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. C. THE CONTRACTOR SHALL ALSO COORDINATE WITH THE THE CONTRACTOR SHALL ALSO COORDINATE WITH THE CONTRACTING OFFICER (CO) FOR ADDITIONAL INFORMATION ON THE LOCATION OF UNDERGROUND UTILITIES. D. ANY COSTS INCURRED BY THE CONTRACTOR DUE TO FAILURE TO ANY COSTS INCURRED BY THE CONTRACTOR DUE TO FAILURE TO COORDINATE AND CONTACT THE PROPER AUTHORITIES SHALL BECOME THE RESPONSIBILITY OF THE CONTRACTOR. 4. THE EXISTING CONDITIONS PLAN IS A COMBINATION OF BASE MAPPING THE EXISTING CONDITIONS PLAN IS A COMBINATION OF BASE MAPPING PREPARED BY THOMPSON-FLEMING LAND SURVEYORS, PC., 12 LAKE AVE #1, SARATOGA SPRINGS, NY 12866, FROM FIELD SURVEYS DATED OCTOBER AND NOVEMBER 2017; AND AS-CONSTRUCTED RECORD DRAWING MAPPING PROVIDED FROM THE CONTRACTING OFFICER'S REPRESENTATIVE (COR). 5. THE CONTRACTOR SHALL BE REQUIRED TO ESTABLISH THE SITE THE CONTRACTOR SHALL BE REQUIRED TO ESTABLISH THE SITE HORIZONTAL AND VERTICAL CONTROL FOR CONSTRUCTION LAYOUT OPERATIONS. THE SURVEYED HORIZONTAL DATUM IS BASED ON NYS EAST ZONE NAD 83; THE SURVEYED VERTICAL DATUM IS BASED ON NAVD 88.

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

1. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE INSIDE AND CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE INSIDE AND OUTSIDE THE LIMIT OF CONSTRUCTION DUE TO THEIR CONTRACT OPERATIONS. 2. CONTRACTOR SHALL PROTECT AND SUSTAIN IN NORMAL CONTRACTOR SHALL PROTECT AND SUSTAIN IN NORMAL SERVICE ALL EXISTING UTILITIES, STRUCTURES, EQUIPMENT, ROADWAYS AND DRIVEWAYS. 3. CONTRACTOR SHALL MAINTAIN NECESSARY TRAFFIC CONTROL CONTRACTOR SHALL MAINTAIN NECESSARY TRAFFIC CONTROL DEVICES, DRUMS, DELINEATORS, SIGNS, FENCES, AND BARRICADES IN ACCORDANCE WITH THE LATEST EDITION OF THE NATIONAL MUTCD WITH NYS SUPPLEMENT TO PROPERLY PROTECT WORK, EQUIPMENT, PERSONS, AND PROPERTY FROM DAMAGE. 4. THE CONTRACTOR SHALL REVIEW THE LOCATIONS OF THE THE CONTRACTOR SHALL REVIEW THE LOCATIONS OF THE PROTECTION FENCING FOR APPROVAL BY THE CONTRACTING OFFICER (CO) PRIOR TO INITIATION OF SITE WORK OPERATIONS. 5. TREE PROTECTION SHALL BE PER THE PROJECT TREE PROTECTION SHALL BE PER THE PROJECT SPECIFICATIONS AND DRAWING DETAILS. STAGING OR STORAGE OF EQUIPMENT IS PROHIBITED WITHIN THE TREE PROTECTION AREAS AS DEPICTED ON THE CONTRACT DRAWINGS. 6. THE CONTRACTOR SHALL MAINTAIN THE PROTECTION FENCING THE CONTRACTOR SHALL MAINTAIN THE PROTECTION FENCING THROUGHOUT THE DURATION OF CONSTRUCTION AND SHALL RESET THE FENCE FABRIC AND POSTS AS REQUIRED AND DETERMINED BY THE CONTRACTING OFFICER (CO). 7. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE PREVIOUSLY COMPLETED TREE CLEARING CONTRACT COMPLETED BY OTHERS. THE SCOPE OF THE PREVIOUSLY COMPLETED TREE CLEARING CONTRACT INCLUDED CUTTING TREES FLUSH WITH EXISTING GRADE AND THE DISPOSAL OF THE PRIMARY TRUNK, LIMBS AND BRANCHES OFF SITE. THE LOWER TRUNK AND STUMP HAVE REMAINED IN PLACE, AND SHALL BE GRUBBED, FULLY REMOVED, AND DISPOSED OF BY THE CONTRACTOR UNDER THE CURRENT CONTRACT AND SCOPE OF WORK. NO PORTION OF THE TREE STUMP OR ROOT SYSTEM SHALL REMAIN AFTER REMOVAL OPERATIONS. 8. ALL ITEMS REQUIRING REMOVAL SHALL BE REMOVED TO FULL ALL ITEMS REQUIRING REMOVAL SHALL BE REMOVED TO FULL DEPTH TO INCLUDE BASE MATERIAL AND FOOTINGS OR FOUNDATIONS AS APPLICABLE UNLESS OTHERWISE NOTED. 9. REMOVE SURPLUS OR UNSUITABLE SOIL MATERIAL, REMOVE SURPLUS OR UNSUITABLE SOIL MATERIAL, DEMOLISHED MATERIAL, WASTE MATERIAL, EXCAVATION MATERIAL, STUMPS, BRUSH, AND ALL OTHER MATERIAL NOT PART OF THE FINISHED WORK, AND LEGALLY DISPOSE OF THEM OFF THE OWNER'S PROPERTY, AT THE CONTRACTOR'S EXPENSE.

AutoCAD SHX Text

SELECTIVE DEMOLITION NOTES:

AutoCAD SHX Text

1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL SURVEY NOTES AND UTILITY LOCATING REQUIREMENTS. NO WORK SHALL COMMENCE UNTIL UNDERGROUND UTILITIES WITHIN THE SITE HAVE BEEN IDENTIFIED. 2. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SITE THE CONTRACTOR'S ATTENTION IS DIRECTED TO SITE PREPARATION AND DEMOLITION PLAN FOR THE IDENTIFICATION OF THE STAGING AND CONSTRUCTION ACCESS CONDITIONS. 3. THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION ACCESS THE CONTRACTOR SHALL SUBMIT A CONSTRUCTION ACCESS PLAN AND CONSTRUCTION SCHEDULE FOR APPROVAL BY THE CONTRACTING OFFICER (CO) PRIOR TO BEGINNING WORK. CONSTRUCTION ACCESS ROUTING IS SHOWN WITHIN THE CONTRACT DOCUMENTS TO PROVIDE THE CONTRACTOR WITH THE REQUIRED ACCESS FOR CONSTRUCTION OPERATIONS AND IS TO BE USED WHEN PREPARING THE CONTRACTOR'S CONSTRUCTION ACCESS PLAN AND SCHEDULE. 4. ALL SURFACES SHALL BE RESTORED AND STABILIZED AT THE ALL SURFACES SHALL BE RESTORED AND STABILIZED AT THE COMPLETION OF EACH STOP AND USE OF SATELLITE STAGING AREAS. RESTORATION WORK SHALL BE APPROVED BY THE CONTRACTING OFFICER (CO). 5. DURING CONSTRUCTION, APPROVAL BY THE CONTRACTING DURING CONSTRUCTION, APPROVAL BY THE CONTRACTING OFFICER (CO) IS REQUIRED FOR ANY FIELD MODIFICATIONS TO THE APPROVED CONSTRUCTION ACCESS PLAN AND SCHEDULE. 6. THE CONTRACTOR IS REQUIRED TO COORDINATE ALL DAY TO THE CONTRACTOR IS REQUIRED TO COORDINATE ALL DAY TO DAY OPERATIONS WITH THE CONTRACTING OFFICER (CO), INCLUDING CONSTRUCTION SCHEDULE, ACCESS ROUTES AND STAGING AREAS. 7. PEDESTRIAN, BUS AND VEHICULAR ACCESS SHALL BE PEDESTRIAN, BUS AND VEHICULAR ACCESS SHALL BE MAINTAINED ON PARK TOUR ROAD AT ALL TIMES. 8. THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE NECESSARY TRAFFIC CONTROL DEVICES, DRUMS, DELINEATORS, SIGNS AND BARRICADES IN ACCORDANCE WITH THE LATEST EDITION OF THE CURRENT NATIONAL MUTCD WITH NYS SUPPLEMENT AND PER THE PROJECT SPECIFICATIONS. 9. CONTRACTOR SHALL MAINTAIN AND PROTECT CONTRACTOR SHALL MAINTAIN AND PROTECT EXISTING/PROPOSED PEDESTRIAN AND VEHICULAR ROUTES AT ALL TIMES DURING CONSTRUCTION. CONTRACTOR TO PROVIDE FLAG PERSON IN THE FRONT AND BACK OF THE CONSTRUCTION VEHICLE TO HELP MANEUVER WITHIN PUBLIC ROUTES AND AREAS. CONTRACTOR TO COORDINATE ALL CONSTRUCTION ACCESS ROUTES WITH THE CONTRACTING OFFICER (CO). 10. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE CONSTRUCTION ACCESS ROUTE AND THE ONE-WAY AUTO TOUR ROAD CIRCULATION TRAFFIC. THE CONTRACTOR SHALL BE REQUIRED TO ENTER THE PARK FROM THE SOUTH GATE ACCESS POINT AND TRAVEL WITH THE FLOW OF TRAFFIC TO TOUR STOP 7. ALL OUTBOUND CONTRACTOR CONSTRUCTION VEHICLES SHALL BE REQUIRED TO EXIT THE SITE VIA THE SOUTH GATE ACCESS POINT, REQUIRING THE CONTRACTOR TO CIRCULATE AGAINST THE FLOW OF PARK PATRON TRAFFIC. THE CONTRACTOR SHALL BE REQUIRED TO COORINATE WITH THE PARK AT ALL TIMES THE CONTRACTOR NEEDS TO UTILIZE THE ROAD AS A CONSTRUCTION EXIT. ALL MAINTENANCE AND PROTECTION OF TRAFFIC MEASURES SHALL BE BY THE CONTRACTOR, AS APPROVED BY THE C.O. CONTRACTION SHALL SUBMIT THEIR M&PT PLAN TO THE C.O. FOR APPROVAL PRIOR TO MOBILIZATION.

AutoCAD SHX Text

CONSTRUCTION ACCESS NOTES:

AutoCAD SHX Text

1. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO SITE EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO SITE DEMOLITION AND EARTH MOVING OPERATIONS. EROSION CONTROL MEASURES SHALL BE REMOVED ONLY UPON FINAL STABILIZATION OF ALL DISTURBED AREAS. 2. TEMPORARY STABILIZATION IS DEFINED AS ALL EXPOSED SOIL THAT HAS TEMPORARY STABILIZATION IS DEFINED AS ALL EXPOSED SOIL THAT HAS BEEN COVERED WITH MATERIALS AS SET FORTH IN THE TECHNICAL STANDARD, NEW YORK STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL, TO PREVENT THE EXPOSED SOIL FROM ERODING. THE MATERIALS CAN INCLUDE, BUT ARE NOT LIMITED TO, MULCH, SEED AND MULCH, AND EROSION CONTROL MATS (E.G. JUTE TWISTED YARN OR EXCELSIOR WOOD FIBER MATS OR APPROVED EQUAL). TEMPORARY STABILIZATION SHALL OCCUR WITHIN 14 DAYS OF SOIL DISTURBANCE UNLESS CONSTRUCTION WILL RESUME IN THAT AREA WITHIN 21 DAYS. 3. FINAL STABILIZATION IS DEFINED AS ALL SOIL DISTURBANCE ACTIVITIES HAVE FINAL STABILIZATION IS DEFINED AS ALL SOIL DISTURBANCE ACTIVITIES HAVE CEASED AND A UNIFORM, PERENNIAL VEGETATIVE COVER WITH A DENSITY OF EIGHTY (80) PERCENT OVER THE ENTIRE PERVIOUS SURFACE HAS BEEN ESTABLISHED; OR OTHER EQUIVALENT STABILIZATION MEASURES, SUCH AS PERMANENT LANDSCAPE MULCHES, ROCK RIP-RAP, OR WASHED/CRUSHED STONE HAVE BEEN APPLIED ON ALL DISTURBED AREAS THAT ARE NOT COVERED BY STRUCTURES OR PAVEMENTS. 4. TEMPORARY SEEDING SHALL BE IN CONFORMANCE WITH THE NEW YORK TEMPORARY SEEDING SHALL BE IN CONFORMANCE WITH THE NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION CONTROL, STANDARD SPECIFICATIONS FOR TEMPORARY CONSTRUCTION AREA SEEDING. 5. THE FOLLOWING GENERAL SEQUENCE OF CONSTRUCTION FOR CONSTRUCTION THE FOLLOWING GENERAL SEQUENCE OF CONSTRUCTION FOR CONSTRUCTION ACTIVITIES SHALL BE FOLLOWED. THE CONTRACTOR SHALL SUBMIT THEIR CONSTRUCTION SCHEDULE TO THE CONTRACTING OFFICER (CO) FOR APPROVAL PRIOR TO INITIATING CONSTRUCTION. 1) LOCATE AND IDENTIFY ALL UTILITIES WITHIN THE LIMITS OF LOCATE AND IDENTIFY ALL UTILITIES WITHIN THE LIMITS OF CONSTRUCTION. 2) INSTALL TEMPORARY EROSION CONTROL PRACTICES. INSTALL TEMPORARY EROSION CONTROL PRACTICES. 3) INSTALL PROTECTION FENCING. INSTALL PROTECTION FENCING. 4) BEGIN SITE AND UTILITY DEMOLITION. BEGIN SITE AND UTILITY DEMOLITION. 5) BEGIN UTILITY INSTALLATION. BEGIN UTILITY INSTALLATION. 6) BEGIN SITE WORK CONSTRUCTION. BEGIN SITE WORK CONSTRUCTION. 7) MAINTAIN AND MONITOR EROSION AND SEDIMENT CONTROL MEASURES MAINTAIN AND MONITOR EROSION AND SEDIMENT CONTROL MEASURES DURING CONSTRUCTION. 8) REMOVE EROSION AND SEDIMENT CONTROL MEASURES UPON REMOVE EROSION AND SEDIMENT CONTROL MEASURES UPON STABILIZATION OF CONTRIBUTING AREAS.

AutoCAD SHX Text

EROSION CONTROL NOTES

AutoCAD SHX Text

1. THE CONTRACTOR SHALL BE RESPONSIBLE TO RETAIN AN THE CONTRACTOR SHALL BE RESPONSIBLE TO RETAIN AN ARCHAEOLOGICAL MONITOR FOR THE DURATION OF ALL GROUND DISTURBANCE ACTIVITIES. 2. ARCHAEOLOGICAL MONITOR SHALL OBSERVE ALL GROUND-DISTURBING ARCHAEOLOGICAL MONITOR SHALL OBSERVE ALL GROUND-DISTURBING SITE WORK, INCLUDING CONSTRUCTION OF TEMPORARY FACILITIES, AT ALL DISTURBED AREAS, FROM A SAFE LOCATION MUTUALLY AGREED ON BY CONTRACTOR AND MONITOR. AS NEW GROUND IS BROKEN, MONITOR WILL EXAMINE EXCAVATED MATERIALS, USING CONSTRUCTION LAYOUT CENTERLINE AND PERIMETER STAKING AS A REFERENCE POINT TO RECORD LOCATIONS OF FINDINGS. 3. IF ARCHAEOLOGICAL MONITOR DISCOVERS RESOURCES, IMMEDIATE IF ARCHAEOLOGICAL MONITOR DISCOVERS RESOURCES, IMMEDIATE RELOCATION OF THE WORK TO A NON-SENSITIVE AREA MAY BE REQUIRED TO ALLOW MONITOR TO IDENTIFY AND DOCUMENT RESOURCES AND, IF NECESSARY, DEVELOP AN APPROPRIATE MITIGATION PLAN. WHILE ARCHAEOLOGICAL MONITOR IS DOCUMENTING RESOURCES IN SENSITIVE AREAS, CONTRACTOR SHALL RELOCATE WORK TO NON-SENSITIVE AREAS WHERE MONITORING IS NOT NORMALLY REQUIRED. 4. IF RESOURCES ARE DISCOVERED WHILE ARCHAEOLOGICAL MONITOR IS IF RESOURCES ARE DISCOVERED WHILE ARCHAEOLOGICAL MONITOR IS ABSENT, STOP WORK IMMEDIATELY AND REPORT THE DISCOVERY TO THE CONTRACTING OFFICER. 5. THE CONTRACTOR SHALL PLAN, SCHEDULE, AND EXECUTE THE WORK THE CONTRACTOR SHALL PLAN, SCHEDULE, AND EXECUTE THE WORK TO PREVENT STOPPAGES AT ONE AREA FROM STOPPING ALL WORK AT THE CONSTRUCTION SITE.

CONTRACTOR RETAINED ARCHAEOLOGICAL MONITOR:

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

AutoCAD SHX Text 1336078A

AutoCAD SHX Text

AutoCAD SHX Text 257238

AutoCAD SHX Text REHABILITATE BATTLEFIELD INTERPRETIVE EXPERIENCE UNFORESEEN WATER DRAINAGE AT TOUR STOP 7

AutoCAD SHX Text

TRL

AutoCAD SHX Text

DLS

AutoCAD SHX Text

TRL

AutoCAD SHX Text 2/14/2025

AutoCAD SHX Text Save Date: 2/17/2025 8:56 AM2/17/2025 8:56 AM

AutoCAD SHX Text File Name: G:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C3 GEN NOTES - 2.dwgG:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C3 GEN NOTES - 2.dwg

AutoCAD SHX Text Plotted By: DUSTIN L. SMITHDUSTIN L. SMITH

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

GENERAL NOTES - 2

AutoCAD SHX Text

AutoCAD SHX Text C3

AutoCAD SHX Text

XREFS: ..\BASES\X-TITLE.DWG;

AutoCAD SHX Text

GENERAL LAYOUT NOTES:

AutoCAD SHX Text

GENERAL GRADING NOTES:

AutoCAD SHX Text

1. CONTRACTOR SHALL VISIT THE SITE TO OBSERVE CONTRACTOR SHALL VISIT THE SITE TO OBSERVE ALL EXISTING SITE CONDITIONS PRIOR TO THE START OF WORK. 2. ALL NEW WORK SHALL BE STAKED OUT PRIOR TO ALL NEW WORK SHALL BE STAKED OUT PRIOR TO CONSTRUCTION. THE CONTRACTING OFFICER (CO) SHALL BE NOTIFIED OF ANY DISCREPANCIES. FIELD ADJUSTMENTS MUST BE APPROVED BY THE CONTRACTING OFFICER (CO) PRIOR TO CONSTRUCTION. 3. ALL LINES AND DIMENSIONS ARE PARALLEL OR ALL LINES AND DIMENSIONS ARE PARALLEL OR PERPENDICULAR TO THE LINES FROM WHICH THEY ARE MEASURED UNLESS OTHERWISE INDICATED. 4. STORAGE AREAS FOR CONTRACTOR'S EQUIPMENT STORAGE AREAS FOR CONTRACTOR'S EQUIPMENT AND MATERIAL SHALL BE WITHIN THE LIMITS OF CONSTRUCTION AS NOTED ON THE CONSTRUCTION PHASING PLANS. 5. CONTRACTOR SHALL MAINTAIN PROPER SIGNS, CONTRACTOR SHALL MAINTAIN PROPER SIGNS, BARRICADES, AND FENCES TO PROPERLY PROTECT THE WORK, EQUIPMENT, PERSONS, & PROPERTY FROM DAMAGE. 6. CONTRACTOR IS RESPONSIBLE TO REPAIR OR CONTRACTOR IS RESPONSIBLE TO REPAIR OR REPLACE ALL ITEMS DAMAGED BY THE CONTRACTOR OUTSIDE OF THE CONSTRUCTION LIMITS, OR ANY DISTURBANCE ON THE SITE WHICH IS NOT PART OF THE IDENTIFIED WORK CONTRACT. 7. BLEND ALL WORK OF THIS CONTRACT SMOOTHLY BLEND ALL WORK OF THIS CONTRACT SMOOTHLY INTO EXISTING CONDITIONS AT THE CONSTRUCTION LIMITS. 8. CONTRACTOR SHALL BE REQUIRED TO EMPLOY A CONTRACTOR SHALL BE REQUIRED TO EMPLOY A LAND SURVEYOR, LICENSED TO PRACTICE IN THE STATE OF NEW YORK, FOR THE DURATION OF THE PROJECT. ALL ASSOCIATED COSTS TO BE INCLUDED IN THE CONTRACTORS BID PRICE. 9. THE CONTRACTORS LICENSED LAND SURVEYOR THE CONTRACTORS LICENSED LAND SURVEYOR SHALL BE RESPONSIBLE TO PERFORM FIELD SURVEYING AND PROVIDE THE HORIZONTAL AND VERTICAL CONTROL OF ALL CONTRACTED PROJECT SCOPE.

AutoCAD SHX Text

1. AFTER THE PROPOSED SUBGRADE SOIL OR AFTER THE PROPOSED SUBGRADE SOIL OR EMBANKMENT FOUNDATION HAS BEEN EXPOSED AND PRIOR TO THE PLACEMENT OF ANY NEW FILL TO ATTAIN THE DESIRED SUBGRADE ELEVATION, THE EXPOSED SUBGRADE SHALL BE PROOF ROLLED. SEE SPECIFICATIONS FOR COMPACTION REQUIREMENTS. 2. IF SOFT, WET, OR WEAK SOILS ARE FOUND, IF SOFT, WET, OR WEAK SOILS ARE FOUND, CONTACT THE CONTRACTING OFFICER (CO) IMMEDIATELY FOR PROPOSED REMEDIATION. 3. MINIMIZE CONSTRUCTION TRAFFIC ONCE THE MINIMIZE CONSTRUCTION TRAFFIC ONCE THE REQUIRED SUBGRADE ELEVATIONS HAVE BEEN ATTAINED. 4. NEW FILL SHALL CONSIST OF CLEAN, INORGANIC NEW FILL SHALL CONSIST OF CLEAN, INORGANIC SOIL FREE OF ANY MISC. MATERIALS, COBBLES, AND BOULDERS - SEE SPECIFICATIONS FOR SUITABLE MATERIAL. 5. EMBANKMENT SHALL BE PLACED IN UNIFORM LIFTS EMBANKMENT SHALL BE PLACED IN UNIFORM LIFTS AND COMPACTED. SEE SPECIFICATIONS FOR COMPACTION REQUIREMENTS. EMBANKMENT MATERIAL SHALL BE PLACED IN LIFTS NOT MORE THAN 8-INCHES (LOOSE DEPTH) FORM MATERIAL COMPACTED BY HEAVY CONSTRUCTION COMPACTION EQUIPMENT, AND NOT MORE THAN 6-INCHES (LOOSE DEPTH) FOR MATERIAL COMPACTED BY HAND OPERATED TAMPERS. 6. THE SIDES OF ANY NEW CUT AND/OR FILL SLOPES THE SIDES OF ANY NEW CUT AND/OR FILL SLOPES SHALL BE CONSTRUCTED W/ SLOPES NO STEEPER THAN 1 FOOT (VERTICAL) ON 2 FOOT (HORIZONTAL), OR PER OSHA REQUIREMENTS BASED ON ENCOUNTERED SOIL CONDITIONS.

AutoCAD SHX Text

1. THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE GENERAL SURVEY NOTES AND UTILITY LOCATING SERVICE REQUIREMENTS. NO WORK SHALL COMMENCE UNTIL UNDERGROUND UTILITIES WITHIN THE SITE HAVE BEEN IDENTIFIED. 2. CONTRACTOR SHALL VERIFY ALL CONDITIONS IN THE CONTRACTOR SHALL VERIFY ALL CONDITIONS IN THE FIELD & REPORT ANY DISCREPANCIES BETWEEN PLANS AND ACTUAL CONDITIONS TO THE CONTRACTING OFFICER (CO). 3. CONTRACTOR SHALL VERIFY PROPOSED GRADES CONTRACTOR SHALL VERIFY PROPOSED GRADES PRIOR TO CONSTRUCTION AND REPORT ANY DISCREPANCIES TO THE CONTRACTING OFFICER (CO). 4. ALL POINTS OF CONSTRUCTION EGRESS OR INGRESS ALL POINTS OF CONSTRUCTION EGRESS OR INGRESS SHALL BE MAINTAINED TO PREVENT TRACKING OR FLOWING OF SEDIMENT OR DEBRIS ONTO PUBLIC ROADS. 5. CONTRACTOR SHALL STRIP AND STOCKPILE EXISTING CONTRACTOR SHALL STRIP AND STOCKPILE EXISTING TOPSOIL TO FULL DEPTH WITHIN LIMIT OF GRADING BEFORE COMMENCING EXCAVATION AND GRADING OPERATIONS. ANY EXCESS OF TOPSOIL ENCOUNTERED NOT USED ON-SITE AS REQUIRED AS PART OF CONSTRUCTION OPERATIONS SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR. 6. CONTRACTOR SHALL BLEND ALL NEW EARTHWORK CONTRACTOR SHALL BLEND ALL NEW EARTHWORK INTO EXISTING GRADES AT LIMITS OF GRADING WORK. PROVIDE SMOOTH, ROUNDED TRANSITIONS, CAPABLE OF BEING CUT WITH A COMMERCIAL RIDING MOWER, AT ALL TOP AND BOTTOM OF SLOPES. 7. PITCH EVENLY BETWEEN SPOT GRADES. ALL PITCH EVENLY BETWEEN SPOT GRADES. ALL FINISHED GRADES MUST PITCH TO DRAIN AT A MINIMUM SLOPE OF ONE - QUARTER INCH (1/4") PER FOOT. ANY DISCREPANCIES NOT ALLOWING THIS TO OCCUR SHALL BE REPORTED TO THE CONTRACTING OFFICER (CO) PRIOR TO CONTINUING WORK. 8. NEW PAVEMENT SHALL MEET ALL EXISTING NEW PAVEMENT SHALL MEET ALL EXISTING PAVEMENTS AND CURBS FLUSH AND SMOOTH WITH NO LIPS OR PROJECTIONS. 9. ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS ANY AREA OUTSIDE THE LIMIT OF WORK THAT IS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT NO COST TO THE OWNER. 10. CONTRACTOR SHALL NOTIFY THE CONTRACTING CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER (CO) WHEN ROUGH GRADING IS COMPLETE. FINISH GRADES SHALL BE ADJUSTED IN FIELD, WHEN NECESSARY, BY APPROVAL OF THE CONTRACTING OFFICER (CO). 11. WHEN EXCAVATING AND FILLING IN TREE AREAS, USE WHEN EXCAVATING AND FILLING IN TREE AREAS, USE EXTREME CAUTION TO PROTECT ROOT SYSTEMS OF TREES NOT INDICATED TO BE REMOVED. IF, IN ORDER TO PERFORM EXCAVATION WORK, IT BECOMES NECESSARY TO CUT ROOTS OF PLANTS TO BE SAVED, SUCH ROOTS SHOULD BE CUT NEATLY, BY APPROVAL OF THE CONTRACTING OFFICER (CO). 12. DURING GRADING OPERATIONS, DRAINAGE OF THE DURING GRADING OPERATIONS, DRAINAGE OF THE SITE AND ADJACENT AREAS SHALL BE MAINTAINED CONTINUOUSLY TO PREVENT EROSION OR OTHER DAMAGE. WHEN IT IS NECESSARY TO INTERRUPT DRAINAGE OR OTHER EXISTING UTILITIES, PROVIDE TEMPORARY FACILITIES UNTIL PERMANENT WORK IS COMPLETED. 13. PRIOR TO PROJECT CLOSE-OUT, CONTRACTOR PRIOR TO PROJECT CLOSE-OUT, CONTRACTOR SHALL REMOVE AND DISPOSE OFF SITE ALL DEBRIS AND EXCESS MATERIALS FROM SITE OR AS OTHERWISE DESCRIBED ON THE SITE PREPARATION AND DEMOLITION DRAWING, AT THE CONTRACTOR'S EXPENSE.

AutoCAD SHX Text

EARTHWORK NOTES:

AutoCAD SHX Text

1. GENERAL REQUIREMENTS GENERAL REQUIREMENTS A. THE CONTRACTOR SHALL PREPARE AND SUBMIT THE CONTRACTOR SHALL PREPARE AND SUBMIT SUBMITTALS FOR C.O. APPROVAL FOR ALL MATERIAL AND PRODUCTS INDICATED IN THE INDIVIDUAL TECHNICAL SPECIFICATION REQUIREMENTS CONTAINED HEREIN. 2. SITE CLEARING SITE CLEARING A. COMPOST FILTER SOCK: DEGRADABLE GEOTEXTILE COMPOST FILTER SOCK: DEGRADABLE GEOTEXTILE MESH TUBE FILLED WITH COMPOST FILTER MEDIA TO FILTER SEDIMENT. COMPOST INFILL SHALL BE WELL DECOMPOSED (MATURED AT LEAST 3 MONTHS), WEED-FREE, ORGANIC MATTER. IT SHALL BE AEROBICALLY COMPOSTED, POSSESS NO OBJECTIONABLE ODORS, AND CONTAIN LESS THAN 1% BY DRY WEIGHT, OF MANMADE FOREIGN MATTER. ALL BIOSOLIDS COMPOST PRODUCED IN NEW YORK STATE MUST MEET NYSDEC'S 6 NYCRR PART 360. B. PROTECTION FENCING: PROVIDE 4-FOOT HIGH, PROTECTION FENCING: PROVIDE 4-FOOT HIGH, ORANGE POLYETHYLENE WARNING FENCE WITH METAL POSTS, TO SERVE AS SITE AND TREE PROTECTION FENCE AS SHOWN ON THE CONTRACT DRAWINGS. FENCES MAY NOT BE MOVED WITHOUT THE SPECIFIC PERMISSION OF THE C.O 3. EARTH MOVING EARTH MOVING A. STRUCTURAL FILL: SHALL CONSIST OF IMPORTED STRUCTURAL FILL: SHALL CONSIST OF IMPORTED SAND AND GRAVEL, FREE OF DELETERIOUS MATERIALS SUCH AS RECYCLED CONCRETE, ASPHALT, BRICKS, GLASS, PYRITIC SHALE ROCK, ORGANICS, OR CONTAMINANTS OF A CHEMICAL, MINERAL, OR BIOLOGICAL NATURE. STRUCTURAL FILL SHALL MEET THE FOLLOWING GRADATION: 100% FINER THAN THE 3” SIEVE; BETWEEN 30% TO 75% FINER THAN THE ¼” SIEVE; BETWEEN 30% TO 75% FINER THAN THE ¼” SIEVE; BETWEEN 5% TO 40% FINER THAN THE #40 SIEVE; AND LESS THAN 10% FINER THAN THE #200 SIEVE. ALL FILL USED AT THE SITE TO BACKFILL EXCAVATIONS OF ANY TYPE, OR INCREASE GRADES TO MEET FINAL DESIGN ELEVATIONS, SHALL BE STRUCTURAL FILL. B. GRANULAR SUBBASE FOR PAVEMENTS: NYSDOT ITEM GRANULAR SUBBASE FOR PAVEMENTS: NYSDOT ITEM 304.12, SUBBASE COURSE TYPE 2. USE OF RECYCLED ASPHALT, CONCRETE, GLASS OR OTHER MATERIAL IS NOT PERMITTED FOR USES AS TYPE 2 SUBBASE. C. PIPE ZONE BEDDING, PIPE ZONE BACKFILL, PIPE ZONE BEDDING, PIPE ZONE BACKFILL, HAUNCHING MATERIAL, AND BASE FOR UTILITY STRUCTURES: CRUSHED STONE MEETING THE REQUIREMENTS OF NYSDOT STANDARD SPECIFICATIONS SECTION 703-02 COARSE AGGREGATE. THE GRADATION SHALL CONFORM TO SIZE DESIGNATION 1 AND 2, AS SHOWN IN TABLE 703-4. D. COBBLE RIP RAP: COBBLE RIP RAP: 1) COBBLE RIP RAP FOR SWALE AND DEPRESSION COBBLE RIP RAP FOR SWALE AND DEPRESSION SHALL CONSIST OF A BASE COURSE LAYER AND A SURFACE COURSE LAYER. SEE DETAILS FOR DEPTH. 2) COBBLE RIP RAP FOR PIPE OUTLET SHALL CONSIST COBBLE RIP RAP FOR PIPE OUTLET SHALL CONSIST OF BASE COURSE LAYER ONLY. SEE DETAILS FOR DEPTH. 3) COBBLE FOR THE BASE COURSE LAYER SHALL COBBLE FOR THE BASE COURSE LAYER SHALL CONFORM TO THE SIZE EQUIVALENT OF NYSDOT STANDARD SPECIFICATIONS FOR ITEM 620.03 STONE FILLING (LIGHT). 4) COBBLE FOR THE SURFACE LAYER SHALL CONSIST COBBLE FOR THE SURFACE LAYER SHALL CONSIST OF 2-INCH TO 3-INCH SIZE STONE. 5) COBBLE COLOR SHALL BE TANS, BUFFS, AND COBBLE COLOR SHALL BE TANS, BUFFS, AND GREYS. 6) COBBLE SHAPE SHALL BE SMOOTH AND OBLONG IN COBBLE SHAPE SHALL BE SMOOTH AND OBLONG IN SHAPE, DOUBLE WASHED, AND FREE OF FINES, SEDIMENT, AND DEBRIS. 7) POSSIBLE SOURCES FOR SELECTION SHALL BE POSSIBLE SOURCES FOR SELECTION SHALL BE WARREN W. FANE, INC. AND TROY SAND AND GRAVEL, OR EQUAL. CONTRACTOR SHALL ASSUME THAT MULTIPLE SAMPLES SHALL BE REQUIRED DURING THE SUBMITTAL REVIEW PROCESS. CONTRACTOR SHALL SUBMIT PHYSICAL SAMPLE TO THE SITE FOR C.O. APPROVAL. E. SEPARATION AND FILTER FABRIC - NONWOVEN: SEPARATION AND FILTER FABRIC - NONWOVEN: SHALL BE ADS 0601T NONWOVEN GEOTEXTILE, OR APPROVED EQUIVALENT. F. DETECTABLE WARNING TAPE: DETECTABLE WARNING DETECTABLE WARNING TAPE: DETECTABLE WARNING TAPE: ACID- AND ALKALI-RESISTANT, POLYETHYLENE FILM WARNING TAPE MANUFACTURED FOR MARKING AND IDENTIFYING UNDERGROUND UTILITIES, A MINIMUM OF 6 INCHES WIDE AND 4 MILS THICK, CONTINUOUSLY INSCRIBED WITH A DESCRIPTION OF THE UTILITY, WITH METALLIC CORE ENCASED IN A PROTECTIVE JACKET FOR CORROSION PROTECTION, DETECTABLE BY METAL DETECTOR WHEN TAPE IS BURIED UP TO 30 INCHES DEEP; COLORED AS FOLLOWS, AS APPLICABLE: GREEN FOR STORM SEWER SYSTEMS. G. DEWATERING: GROUNDWATER IS EXPECTED TO BE DEWATERING: GROUNDWATER IS EXPECTED TO BE ENCOUNTERED DURING CONSTRUCTION. THE CONTRACTOR SHALL SLOPE EXCAVATIONS TO ONE END, CONSTRUCT SUMPS, AND PUMP TO KEEP EXCAVATIONS FREE FROM STANDING WATER. CONTRACTOR SHALL UTILIZED SEDIMENT BAGS AS REQUIRED, ENSURING THAT EROSION AND SEDIMENTATION DOES NOT OCCUR AND IS CONTROLLED AND MANAGED AT THE DAYLIGHT OUTLET OF ANY PUMP SYSTEM, INSTALL SILT SOCK OR CHECK DAMS AS REQUIRED. PREVENT SURFACE WATER, GROUND WATER, AND PRECIPITATION FROM ENTERING EXCAVATIONS, FROM PONDING ON PREPARED SUBGRADES, AND FROM FLOODING PROJECT SITE AND SURROUNDING AREAS. PROTECT SUBGRADES FROM SOFTENING, UNDERMINING, WASHOUT, AND DAMAGE BY RAIN OR WATER ACCUMULATION. 4. ASPHALT PAVEMENT ASPHALT PAVEMENT A. ENVIRONMENTAL LIMITATIONS: THE CONTRACTOR ENVIRONMENTAL LIMITATIONS: THE CONTRACTOR SHALL COMPLY WITH NYSDOT SPECIFICATION 402-3.01 WEATHER AND SEASONAL LIMITATIONS. B. TACK COAT: COMPLY WITH REQUIREMENTS OF TACK COAT: COMPLY WITH REQUIREMENTS OF NYSDOT STANDARD SPECIFICATIONS SECTION 407, TACK COAT. TACK COAT SHALL BE IN MATERIAL CONFORMANCE WITH NYSDOT SECTION 702-8, STRAIGHT TACK COAT. C. ASPHALT: COMPLY WITH REQUIREMENTS OF NYSDOT ASPHALT: COMPLY WITH REQUIREMENTS OF NYSDOT STANDARD SPECIFICATIONS SECTION 404, ASPHALT PAVEMENT FOR THE MATERIAL AND COMPOSITION OF THE FOLLOWING COURSES: 1) ASPHALT TOP COURSE: NYSDOT ITEM NO. ASPHALT TOP COURSE: NYSDOT ITEM NO. 404.128201, 12.5 F2 TOP COURSE ASPHALT, 80 SERIES COMPACTION. 5. TURF AND GRASSES TURF AND GRASSES A. EROSION CONTROL FABRIC: PROVIDE ROLLED EROSION EROSION CONTROL FABRIC: PROVIDE ROLLED EROSION CONTROL PRODUCT, BIODEGRADABLE EROSION CONTROL BLANKET, DESIGNED FOR USE ON SLOPES AS PER NYSDOT APPROVED MATERIAL LIST FOR ROLLED EROSION CONTROL PRODUCTS AND SOIL STABILIZERS, CLASS 1, TYPE C (SHORT TERM). B. TURF SEED MIX SHALL BE 'ERNMX-113', AS TURF SEED MIX SHALL BE 'ERNMX-113', AS PROVIDED BY ERNST CONSERVATION SEEDS, INC., 8884 MERCER PIKE, MEADVILLE, PA, 16335, OR APPROVED EQUIVALENT. MIX SHALL BE AS FOLLOWS: 1) 25% CREEPING RED FESCUE (FESTUCA RUBRA) 25% CREEPING RED FESCUE (FESTUCA RUBRA) 2) 25% LOLIUM MULTIFLORUM (ANNUAL RYEGRASS) 25% LOLIUM MULTIFLORUM (ANNUAL RYEGRASS) 3) 25% LOLIUM PERENNE 'SPIRIT' (PERENNIAL 25% LOLIUM PERENNE 'SPIRIT' (PERENNIAL RYEGRASS 'SPIRIT', TURF TYPE) 4) 25% LOLIUM PERENNE 'SHINING STAR' (PERENNIAL 25% LOLIUM PERENNE 'SHINING STAR' (PERENNIAL RYEGRASS 'SHINING STAR', TURF TYPE) 5) SEEDING APPLICATION RATE: APPLY SEED AT A SEEDING APPLICATION RATE: APPLY SEED AT A RATE OF 5 LBS. PER 1,000 SQUARE FEET. 6) TOP DRESS WITH STARTER FERTILIZER AT A RATE TOP DRESS WITH STARTER FERTILIZER AT A RATE OF 1 LB. NITROGEN PER 1,000 SF AT THE TIME OF SEEDING AND AFTER THE FIRST MOWING (4-6 WEEKS AFTER GERMINATION). C. TOPSOIL: SHALL BE PER NYSDOT STANDARD TOPSOIL: SHALL BE PER NYSDOT STANDARD SPECIFICATIONS, SECTION 713-01, TOPSOIL. 1) ON-SITE TOPSOIL: A LIMITED QUANTITY OF ON-SITE TOPSOIL: A LIMITED QUANTITY OF TOPSOIL IS AVAILABLE ON-SITE FOR REUSE. THE EXISTING ON-SITE TOPSOIL QUANTITY MAY NOT BE SUFFICIENT FOR COMPLETING THE FINISHED WORK, AS SUCH, THE CONTRACTOR SHALL BE RESPONSIBLE FOR FURNISHING AND INSTALLING THE REMAINING TOPSOIL REQUIRED TO COMPLETE THE WORK. 6. STORM UTILITY DRAINAGE PIPING STORM UTILITY DRAINAGE PIPING A. PE PIPE AND FITTINGS: PE PIPE AND FITTINGS: 1) CORRUGATED PE PIPE AND FITTINGS NPS 12 TO CORRUGATED PE PIPE AND FITTINGS NPS 12 TO NPS 60: AASHTO M 294, TYPE S, WITH SMOOTH WATERWAY FOR COUPLING JOINTS. COUPLINGS: ASTM D3350 AND AASHTO M294, HIGH DENSITY POLYETHYLENE FOR SILT TIGHT JOINTS. 2) PERFORATED CORRUGATED PE PIPE AND FITTINGS: PERFORATED CORRUGATED PE PIPE AND FITTINGS: AASHTO M294, TYPE S, WITH SMOOTH WATERWAY FOR COUPLING JOINTS. COUPLING: ASTM D3350 AND AASHTO M294, HIGH-DENSITY POLYETHYLENE FOR SILT TIGHT JOINTS. WRAP CORRUGATED PE PIPE IN MANUFACTURER SUPPLIED FILTER SOCK. B. DRAIN BASINS: POLYVINYL CHLORIDE (PVC) INLET DRAIN BASINS: POLYVINYL CHLORIDE (PVC) INLET DRAINS, RISERS, AND CATCH BASINS. ASTM F 794, F 979 AND F 1336 MECHANICAL PROPERTY REQUIREMENTS FOR FABRICATED FITTINGS OF DIMENSIONS, PIPE CONNECTIONS, ORIENTATIONS, AND DEPTH INDICATED. 1) STRUCTURES: PVC PIPE STOCK REFORMED STRUCTURES: PVC PIPE STOCK REFORMED UTILIZING A THERMO MOLDING PROCESS WITH SPECIFIED INLET AND OUTLET PIPE CONNECTION STUBS AND RISERS SIZED TO FIT SPECIFIED FRAME AND GRATE. 2) SIZE: 18-INCH MINIMUM DIAMETER. SIZE SHALL SIZE: 18-INCH MINIMUM DIAMETER. SIZE SHALL INCREASE AS REQUIRED PER MANUFACTURER'S STANDARD BASIN DESIGN. 3) JOINTS: FABRICATED FITTINGS SHALL CONFORM TO JOINTS: FABRICATED FITTINGS SHALL CONFORM TO ASTM D3212 FOR WATERTIGHT CONNECTIONS USING FLEXIBLE ELASTOMERIC SEALS. FLEXIBLE ELASTOMERIC SEALS SHALL CONFORM TO ASTM F477. 4) FRAMES, COVERS, AND BEEHIVE DOMED GRATES: FRAMES, COVERS, AND BEEHIVE DOMED GRATES: FRAMES AND COVERS SHALL BE CAPABLE OF SUPPORTING H20 WHEEL LOADING. METAL USED IN THE MANUFACTURE OF THE CASTINGS SHALL CONFORM TO ASTM A536 GRADE 70-50-05 FOR DUCTILE IRON, NATURAL WEATHERED STEEL, MANUFACTURED TO FIT SPECIFIED PVC RISER FITTING. ALL FRAMES AND GRATES SHALL BE LOCKABLE AND SHALL CONSIST OF BEEHIVE DOMED GRATES. SOLID COVER SHALL BE MARKED 'STORM'. C. END SECTION: HIGH DENSITY POLYETHYLENE (HDPE) END SECTION: HIGH DENSITY POLYETHYLENE (HDPE) UNITS: FLARED END SECTION MEETING ASTM D3350 STANDARDS, WITH MINIMUM CELL CLASSIFICATION 213320C. SECTIONS SHALL HAVE CARBON BLACK ADDITIVE FOR UV PROTECTION. THREADED FASTENERS SHALL BE STAINLESS STEEL.

TECHNICAL SPECIFICATIONS:

18"PINE

EXISTING TREE

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

EXISTING SIGN

AutoCAD SHX Text

EXISTING MINOR CONTOUR

AutoCAD SHX Text

EXISTING MAJOR CONTOUR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING TREELINE

AutoCAD SHX Text

LIMIT OF CONSTRUCTION

AutoCAD SHX Text

EDGE OF ASPHALT, TYP.

AutoCAD SHX Text

(WOODS)

AutoCAD SHX Text

CONCRETE CURB, TYP.

AutoCAD SHX Text

CONCRETE CURB, TYP.

AutoCAD SHX Text

(WOODS)

AutoCAD SHX Text

(WOODS)

AutoCAD SHX Text

18" OAK

AutoCAD SHX Text

(3) BOLE 18" OAK

AutoCAD SHX Text

(WOODS)

AutoCAD SHX Text

(WOODS)

AutoCAD SHX Text

24" OAK

AutoCAD SHX Text

ASPHALT PAVEMENT, TYP.

AutoCAD SHX Text

ASPHALT PAVEMENT, TYP.

AutoCAD SHX Text

EXHIBIT PANEL WITH STONE BASE, TYP.

AutoCAD SHX Text

EXHIBIT PANEL, TYP.

AutoCAD SHX Text

CONCRETE CURB RAMP, TYP.

AutoCAD SHX Text

(MOWED TURF GRASS)

AutoCAD SHX Text

(MOWED TURF GRASS)

AutoCAD SHX Text

(MOWED TURF GRASS)

AutoCAD SHX Text

ACCESSIBLE PARKING SIGN, TYP.

AutoCAD SHX Text

4" STUMP

AutoCAD SHX Text

2" MULTISTEM SCRUB

AutoCAD SHX Text

4" TREE

AutoCAD SHX Text

2" MULTISTEM SCRUB

AutoCAD SHX Text

6" TREE

AutoCAD SHX Text

4" TREE

AutoCAD SHX Text

2 STEM MAPLE

AutoCAD SHX Text

4" TREE

AutoCAD SHX Text

10" TREE

AutoCAD SHX Text

6" TREE

AutoCAD SHX Text

10" TREE

AutoCAD SHX Text

3" TREE

AutoCAD SHX Text

4" TREE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CONCRETE PAVEMENT, TYP.

AutoCAD SHX Text

TOUR ROAD

AutoCAD SHX Text

LIMIT OF CONSTRUCTION, TYP.

AutoCAD SHX Text

MON. 7-17-1

AutoCAD SHX Text

MON. 7-27-2

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

AutoCAD SHX Text 1336078A

AutoCAD SHX Text

AutoCAD SHX Text 257238

AutoCAD SHX Text REHABILITATE BATTLEFIELD INTERPRETIVE EXPERIENCE UNFORESEEN WATER DRAINAGE AT TOUR STOP 7

AutoCAD SHX Text

TRL

AutoCAD SHX Text

DLS

AutoCAD SHX Text

TRL

AutoCAD SHX Text 2/14/2025

AutoCAD SHX Text Save Date: 2/17/2025 8:56 AM2/17/2025 8:56 AM

AutoCAD SHX Text File Name: G:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C4 EXCON.dwgG:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C4 EXCON.dwg

AutoCAD SHX Text Plotted By: DUSTIN L. SMITHDUSTIN L. SMITH

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

EXISTING CONDITIONS

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

AutoCAD SHX Text C4

AutoCAD SHX Text

XREFS: ..\BASES\X-SURVEY20.DWG; ..\BASES\X_KEY MAP.DWG; ..\BASES\X-TITLE.DWG;

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1" = 10'

AutoCAD SHX Text

SURVEY CONTROL MONUMENTS (MON.)

AutoCAD SHX Text

ELEV. 273.79

AutoCAD SHX Text N. 1522342.303

AutoCAD SHX Text E. 722374.182

AutoCAD SHX Text

DESCRIPTION:

AutoCAD SHX Text

NAME: 7-2

AutoCAD SHX Text

CENTER OF ALUMINUM DISK

AutoCAD SHX Text

SET IN CONCRETE

AutoCAD SHX Text

ELEV. 265.22

AutoCAD SHX Text N. 1522518.690

AutoCAD SHX Text E. 722556.692

AutoCAD SHX Text

DESCRIPTION:

AutoCAD SHX Text

NAME: 7-1

AutoCAD SHX Text

CENTER OF ALUMINUM DISK

AutoCAD SHX Text

SET IN CONCRETE

SURVEY CONTROL MONUMENTS LOCATION KEY

STOP 7

CLOSED FOR

RENOVATIONS

CAUTION TRUCKS

ENTERING AND

EXISTING ROADWAY

AutoCAD SHX Text

PROTECTION FENCE

AutoCAD SHX Text

GRUB, REMOVE, AND DISPOSE OF EXISTING INDIVIDUAL TREE STUMPS AND ROOT SYSTEMS

AutoCAD SHX Text

COMPOST FILTER SOCK

AutoCAD SHX Text

TEMPORARY CONSTRUCTION SIGN AS NOTED

AutoCAD SHX Text

CONSTRUCTION STAGING AREA

AutoCAD SHX Text

CONSTRUCTION ACCESS ROUTE

AutoCAD SHX Text

LIMIT OF CONSTRUCTION

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

SAWCUT EXISTING PAVEMENT

AutoCAD SHX Text

REMOVE AND DISPOSE OF EX. BITUMINOUS CONCRETE PAVEMENT AND SUBBASE

AutoCAD SHX Text

REMOVE AND DISPOSE OF EXISTING ORGANIC MATERIAL

AutoCAD SHX Text

1-1/2 INCH ASPHALT PAVEMENT MILL

AutoCAD SHX Text

4" TREE

AutoCAD SHX Text

2" MULTISTEM SCRUB

AutoCAD SHX Text

6" TREE

AutoCAD SHX Text

10" TREE

AutoCAD SHX Text

3" TREE

AutoCAD SHX Text

4" TREE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C6

AutoCAD SHX Text

AutoCAD SHX Text C6

AutoCAD SHX Text

AutoCAD SHX Text C6

AutoCAD SHX Text

AutoCAD SHX Text C6

AutoCAD SHX Text

AutoCAD SHX Text C6

AutoCAD SHX Text

AutoCAD SHX Text CUSTOM (24"x12")

AutoCAD SHX Text

REMOVE AND DISPOSE OF EXISTING ORGANIC MATERIAL, TYP.

AutoCAD SHX Text

SAWCUT EXISTING PAVEMENT, TYP.

AutoCAD SHX Text

REMOVE AND DISPOSE OF ASPHALT PAVEMENT, TYP.

AutoCAD SHX Text

1-1/2 INCH DEPTH ASPHALT PAVEMENT MILL, TYP.

AutoCAD SHX Text

PROTECTION FENCE, TYP.

AutoCAD SHX Text

PROTECTION FENCE, TYP.

AutoCAD SHX Text

COMPOST FILTER SOCK, TYP.

AutoCAD SHX Text

COMPOST FILTER SOCK, TYP.

AutoCAD SHX Text GRUB, REMOVE, AND DISPOSE OF EXISTING INDIVIDUAL TREE STUMPS AND ROOT SYSTEMS, TYP.

AutoCAD SHX Text GRUB, REMOVE, AND DISPOSE OF EXISTING INDIVIDUAL TREE STUMPS AND ROOT SYSTEMS, TYP.

AutoCAD SHX Text

COMPOST FILTER SOCK, TYP.

AutoCAD SHX Text CONTRACTOR SHALL UTILIZE THE EXISTING LAWN ISLAND AS THE LOCATION OF THE CONSTRUCTION STAGING AREA; FINAL LOCATION SHALL BE COORDINATED WITH AND APPROVED BY CONTRACTING OFFICER (CO). CONTRACTOR SHALL RESTORE ALL DISTURBED AND DAMAGED AREAS, INCLUDING EXISTING PAVEMENT, TO EXISTING CONDITIONS. LAWN RESTORATION SHALL CONSIST OF REMOVAL OF CONSTRUCTION DEBRIS AND MATERIAL, DECOMPACTION AND SCARIFICATION OF EXISTING GRADE, INSTALLATION OF A MINIMUM OF 2-INCHES OF TOPSOIL, AND TURF SEED AS SPECIFIED. IF EXISTING PAVEMENT IS DAMAGED, THE CONTRACTOR SHALL BE REQUIRED TO NEATLY SAWCUT DAMAGED AREAS, MILL PAVEMENT SURFACE, AND REPAVE WITH TOP COURSE ASPHALT PAVEMENT AS SPECIFIED AND INSTALL PAVEMENT MARKINGS AS APPLICABLE.

AutoCAD SHX Text

SAWCUT EXISTING PAVEMENT, TYP.

AutoCAD SHX Text

CONSTRUCTION ACCESS ROUTE, TYP.

AutoCAD SHX Text

CONSTRUCTION GATE OR BARRICADE, TYPICAL INGRESS AND EGRESS LANE

AutoCAD SHX Text

TOUR ROAD

AutoCAD SHX Text

LIMIT OF CONSTRUCTION, TYP.

AutoCAD SHX Text C6

AutoCAD SHX Text

AutoCAD SHX Text

PROTECTION FENCE, TYP.

AutoCAD SHX Text

TEMPORARY CONSTRUCTION SIGN, TYP.

AutoCAD SHX Text W20-7 (30"x30")

AutoCAD SHX Text W21-1 (30"x30")

AutoCAD SHX Text CUSTOM (30"x42")

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

AutoCAD SHX Text 1336078A

AutoCAD SHX Text

AutoCAD SHX Text 257238

AutoCAD SHX Text REHABILITATE BATTLEFIELD INTERPRETIVE EXPERIENCE UNFORESEEN WATER DRAINAGE AT TOUR STOP 7

AutoCAD SHX Text

TRL

AutoCAD SHX Text

DLS

AutoCAD SHX Text

TRL

AutoCAD SHX Text 2/14/2025

AutoCAD SHX Text Save Date: 2/17/2025 9:57 AM2/17/2025 9:57 AM

AutoCAD SHX Text File Name: G:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C5 SITE PREP.dwgG:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C5 SITE PREP.dwg

AutoCAD SHX Text Plotted By: DUSTIN L. SMITHDUSTIN L. SMITH

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

SITE PREPARATION

AutoCAD SHX Text

AND DEMOLITION PLAN

AutoCAD SHX Text

AutoCAD SHX Text C5

AutoCAD SHX Text XREFS: ..\BASES\X-SURVEY20.DWG; ..\BASES\X_KEY MAP.DWG; ..\BASES\X-TITLE.DWG; ..\BASES\XL-BASE-ST1.DWG;

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1" = 10'

AutoCAD SHX Text

CONSTRUCTION ACCESS ROUTE

AutoCAD SHX Text 3-MILES FROM PARK SOUTH GATE TO PROJECT LOCATION. THE CONTRACTOR SHALL COORDINATE OUTBOUND CONSTRUCTION TRAFFIC WITH C.O.

AutoCAD SHX Text THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE PREVIOUSLY COMPLETED TREE CLEARING CONTRACT COMPLETED BY OTHERS. THE SCOPE OF THE PREVIOUSLY COMPLETED TREE CLEARING CONTRACT INCLUDED CUTTING TREES FLUSH WITH EXISTING GRADE AND THE DISPOSAL OF THE PRIMARY TRUNK, LIMBS AND BRANCHES OFF SITE. THE LOWER TRUNK AND STUMP HAVE REMAINED IN PLACE, AND SHALL BE GRUBBED, FULLY REMOVED, AND DISPOSED OF BY THE CONTRACTOR UNDER THE CURRENT CONTRACT AND SCOPE OF WORK. NO PORTION OF THE TREE STUMP OR ROOT SYSTEM SHALL REMAIN AFTER REMOVAL OPERATIONS.

AutoCAD SHX Text

TREE REMOVAL NOTE

AutoCAD SHX Text

ROUTE 32/142

AutoCAD SHX Text

PROJECT LOCATION

AutoCAD SHX Text

TOUR STOP 7

AutoCAD SHX Text

PARK SOUTH GATE: CONSTRUCTION ACCESS LOCATION

ROUTE 4

C8

C7

C8

C7

C8

C8

4C8

C8

AutoCAD SHX Text

EXISTING TREE

AutoCAD SHX Text

LEGEND

AutoCAD SHX Text

EXISTING SIGN

AutoCAD SHX Text

EXISTING BLUE POST

AutoCAD SHX Text B

AutoCAD SHX Text

EXISTING MINOR CONTOUR

AutoCAD SHX Text

EXISTING MAJOR CONTOUR

AutoCAD SHX Text

EXISTING RED POST

AutoCAD SHX Text R

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING MOWED MEADOW

AutoCAD SHX Text

EXISTING WETLAND

AutoCAD SHX Text

EXISTING TREELINE

AutoCAD SHX Text

EXISTING STORM SEWER

AutoCAD SHX Text

LIMIT OF CONSTRUCTION

AutoCAD SHX Text

STORM PIPE

AutoCAD SHX Text

DRAIN BASIN

AutoCAD SHX Text

UNDER DRAIN

AutoCAD SHX Text

TURF RESTORATION: 6-IN TOPSOIL AND SEED AS SPECIFIED

AutoCAD SHX Text

EROSION CONTROL BLANKET

AutoCAD SHX Text

COBBLE RIP RAP

AutoCAD SHX Text

ASPHALT PAVEMENT OVERLAY

AutoCAD SHX Text

NEW CONTOUR

AutoCAD SHX Text

4" TREE

AutoCAD SHX Text

2" MULTISTEM SCRUB

AutoCAD SHX Text

6" TREE

AutoCAD SHX Text

10" TREE

AutoCAD SHX Text

3" TREE

AutoCAD SHX Text

4" TREE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INVERT OUT: 261.44

AutoCAD SHX Text

UNDERDRAIN, TYP.

AutoCAD SHX Text

TYPICAL STORM PIPE

AutoCAD SHX Text

FLARED END SECTION AND COBBLE RIP RAP APRON

AutoCAD SHX Text

EROSION CONTROL BLANKET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

104 LF 4-IN HDPE @ 8.00%

AutoCAD SHX Text

48 LF 18-IN HDPE @ 1.00%

AutoCAD SHX Text

SWALE SECTION: 3-FT DEPTH CONDITION

AutoCAD SHX Text

SWALE SECTION: 6-IN DEPTH CONDITION

AutoCAD SHX Text

ASPHALT PAVEMENT, TYP. OVERLAY

AutoCAD SHX Text

DRAIN BASIN (SOLID COVER) FRAME: 268.50 INV. IN: 262.02 INV. OUT 261.92

AutoCAD SHX Text

38 LF 18-IN HDPE @ 1%

AutoCAD SHX Text

MEET EXISTING CONCRETE PAVEMENT FLUSH WITH SMOOTH TRANSITION, TYP.

AutoCAD SHX Text

DRAIN BASIN (DOME CRATE) FRAME: 265.50 INV. IN: 264.00 INV. OUT 262.40

AutoCAD SHX Text

MEET EXISTING ASPHALT PAVEMENT FLUSH W/ SMOOTH TRANSITION, TYP.

AutoCAD SHX Text

UNDERDRAIN INV. IN: 270.50

AutoCAD SHX Text

MEET EXISTING PAVEMENT FLUSH W/ SMOOTH TRANSITION, TYP.

AutoCAD SHX Text

MEET EXISTING CONTINUOUS TOP OF CURB FLUSH W/ SMOOTH TRANSITION, TYP.

AutoCAD SHX Text

TOUR ROAD

AutoCAD SHX Text

LIMIT OF CONSTRUCTION, TYP.

AutoCAD SHX Text

18-IN DEPTH COBBLE RIP RAP OVER GEOTEXTILE FILTER FABRIC, TYP.

AutoCAD SHX Text CONTRACTOR SHALL HAND FINE GRADE AND PITCH EXISTING GRADE AWAY FROM EXISTING WAYSIDE PAD TO ALLEVIATE EXISTING PONDING

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

PMIS/PKG NO.

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

AutoCAD SHX Text 1336078A

AutoCAD SHX Text

AutoCAD SHX Text 257238

AutoCAD SHX Text REHABILITATE BATTLEFIELD INTERPRETIVE EXPERIENCE UNFORESEEN WATER DRAINAGE AT TOUR STOP 7

AutoCAD SHX Text

TRL

AutoCAD SHX Text

DLS

AutoCAD SHX Text

TRL

AutoCAD SHX Text 2/14/2025

AutoCAD SHX Text Save Date: 2/17/2025 10:11 AM2/17/2025 10:11 AM

AutoCAD SHX Text File Name: G:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C6 SITE DEV PLAN.dwgG:\Proj-2024\2024085_SARA_Tour_Stop_7_Drainage_Issues\2024085CAD\SARA-257238_TOUR STOP 7\SARA\PMIS 257238\DRAWINGS\CIVIL\C6 SITE DEV PLAN.dwg

AutoCAD SHX Text Plotted By: DUSTIN L. SMITHDUSTIN L. SMITH

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DESIGNED:

AutoCAD SHX Text

TECH. REVIEW:

AutoCAD SHX Text

SUB SHEET NO.

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE OF SHEET

AutoCAD SHX Text

SITE DEVELOPEMENT

AutoCAD SHX Text

PLAN

AutoCAD SHX Text

AutoCAD SHX Text C6

AutoCAD SHX Text XREFS: ..\BASES\X-SURVEY20.DWG; ..\BASES\X_KEY MAP.DWG; ..\BASES\X-TITLE.DWG; ..\BASES\XL-BASE-ST7.DWG;

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE OF FEET

AutoCAD SHX Text 1" = 10'

AutoCAD SHX Text ABA O.R.A.R NOTE THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE ACCESSIBILITY REQUIREMENTS OF THE ACCESSIBILITY REQUIREMENTS OF THE NEW WORK; THE MAXIMUM SLOPE OF THE NEW ABA LANDING SHALL BE 1.5% IN ANY DIRECTION; RUNNING SLOPES OF THE NEW ABA O.R.A.R ROUTE SHALL BE 1% MINIMUM AND 4.5% MAXIMUM. COORDINATE W/ THE C.O. AS REQUIRED.

ORANGE POLYETHYLENE WARNING FENCE

AutoCAD SHX Text FOR TREE PROTECTION CONDITIONS: ADD WATERPROOF PERMANENT SIGN READING "TREE PROTECTION AREA"; MIN. 3 SIGNS PER TREE, OR 1 SIGN EVERY 20' O.C. FOR GROUPINGS OF TREES

AutoCAD SHX Text

METAL POST DRIVEN MIN. 24" INTO GROUND

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text

18" MIN. INTO SUBGRADE OR REFUSAL

AutoCAD SHX Text COMPOST FILTER SOCK GENERAL NOTES: 1. CONTRACTOR SHALL UTILIZE COMPOST FILTER SOCK IN AREAS CONTRACTOR SHALL UTILIZE COMPOST FILTER SOCK IN AREAS WHERE INSTALLATION OF STANDARD SILT FENCE CANNOT OCCUR DUE TO THE PRESENCE OF ROCK OR STEEP ADJACENT SLOPES. 2. SEDIMENT BARRIER SHALL BE LOCATED AS INDICATED ON THE SEDIMENT BARRIER SHALL BE LOCATED AS INDICATED ON THE PLANS. SEDIMENT BARRIER SHALL BE INSTALLED PARALLEL TO THE BASE OF THE SLOPE OR OTHER DISTURBED AREAS. 3. STAKES SHALL BE INSTALLED THROUGH THE MIDDLE OF THE STAKES SHALL BE INSTALLED THROUGH THE MIDDLE OF THE SEDIMENT CONTROL ON 10 FT CENTERS, USING 2 IN BY 2 IN BY 3 FT HARD WOOD STAKES. 4. STAKING DEPTH SHALL BE 18" MIN. OR UNTIL REFUSAL. STAKING DEPTH SHALL BE 18" MIN. OR UNTIL REFUSAL. 5. THE CONTRACTOR SHALL MAINTAIN THE SILT BARRIER IN A THE CONTRACTOR SHALL MAINTAIN THE SILT BARRIER IN A FUNCTIONAL CONDITION AT ALL TIMES AND IT SHALL BE ROUTINELY INSPECTED. 6. IF THE SILT BARRIER HAS BEEN DAMAGED, IT SHALL BE IF THE SILT BARRIER HAS BEEN DAMAGED, IT SHALL BE REPAIRED, OR REPLACED IF BEYOND REPAIR. 7. THE CONTRACTOR SHALL REMOVE SEDIMENT AT THE BASE OF THE CONTRACTOR SHALL REMOVE SEDIMENT AT THE BASE OF THE UPSLOPE SIDE OF THE SILT BARRIER WHEN ACCUMULATION HAS REACHED THE TOP OF THE SOCK. 8. SILT BARRIER SHALL BE MAINTAINED UNTIL ALL DISTURBED SILT BARRIER SHALL BE MAINTAINED UNTIL ALL DISTURBED AREAS HAVE ACHIEVED COMPLETE STABILIZATION. 9. ORGANIC FILTER MEDIA SHALL MEET FILTREXX INTERNATIONAL ORGANIC FILTER MEDIA SHALL MEET FILTREXX INTERNATIONAL STANDARD SPECIFICATIONS FOR FILTER MEDIA, OR APPROVED EQUAL.

AutoCAD SHX Text

WORK AREA

AutoCAD SHX Text

PROTECTED AREAS

AutoCAD SHX Text

FLOW, TYP.

AutoCAD SHX Text

BLOWN IN PLACE FILTER MEDIA

AutoCAD SHX Text

SUPPORT STAKES (10' O.C. MAX.)

AutoCAD SHX Text

12" DIA. COMPOST FILTER SOCK, FILTREX OR EQUAL

AutoCAD SHX Text

EXISTING GRADE, TYP.

AutoCAD SHX Text

FILTER SOCK TO BE FLUSH TO EXISTING GRADE, TYP.

AutoCAD SHX Text

COMPOST FILTER SOCK

AutoCAD SHX Text GENERAL NOTES: 1. SEED & SOIL AMENDMENTS SHALL BE SEED & SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE PROJECT SPECIFICATIONS PRIOR TO APPLYING THE BLANKET. 2. PREPARE SEED BED (INCLUDING PREPARE SEED BED (INCLUDING APPLICATION OF LIME, FERTILIZER, & SEED) PRIOR TO INSTALLATION OF BLANKET. 3. PROVIDE ANCHOR TRENCH AT THE TOE PROVIDE ANCHOR TRENCH AT THE TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF SLOPE. 4. SLOPE SURFACE SHALL BE FREE OF SLOPE SURFACE SHALL BE FREE OF ROCKS, CLOTS, STICKS, & DEBRIS. 5.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .