Attach 1 Statement of Work.pdf
PDF 1 MB Posted
- Attached to
- Bldg. 2264 Asbestos Abatement Federal contract opportunity
- Solicitation number
- FA462021QA149
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attach 2. WD 2015-5537.pdf | ||
| SOW Attach 1.A_Facility Floor Plan and Location of Work Area.pdf | ||
| FA462021QA149 Combo.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
CARPET/TILE & MASTIC ASBESTOS REMOVAL
BUILDING 2264
TRIRIGA WT: 10373422
August 2021
FA462021QA149
Attachment 1 Statement of Work
Statement of Work (SOW) For
Carpet/Tile & Mastic Asbestos Removal Fairchild AFB, WA
1. DESCRIPTION OF SERVICE: The contractor shall provide all necessary tools, equipment and materials required by law to provide clean-up and removal of asbestos containing material (ACM) in building 2264, Lounge Area on Fairchild AFB, WA.
2. SCOPE OF WORK: The Contractor shall complete all work, which includes furnishing all supervision, labor, material, equipment and services, unless otherwise specified herein, required under this contract. All work shall be performed in accordance with all Federal, State, local laws and regulations, manufacturer’s recommendations and this Statement of Work (SOW).
- Contractor shall provide appropriate asbestos certified personnel to properly abate and dispose of asbestos containing materials for approximately 515 sf of carpet and associated carpet mastic as well as approximately 20 sf of vinyl tile and associated mastic in building 2264, Lounge Area.
- Contractor shall properly remove carpet and vinyl tile and 100 percent of asbestos containing material from the floor surface to reveal the finished concrete floor. This includes but not limited to: expansion joints, room edges, etc. The government understands that staining occurs. Technicians will bring each occurrence of staining to the POC’s attention for evaluation at the time of removal. Encapsulation is not authorized.
- Contractor shall develop a detailed work plan. This work plan shall consist of, as a minimum, the scope and location of work performed, floor plan of the worksite noting locations of asbestos abatement, photographs of the worksite, notification records, air monitoring test records, employee training records, and waste shipment records.
- Contractor shall notify the Spokane Regional Air Agency as required.
- Furniture will all be removed by the government prior to start of work.
- Contractor shall removal all construction and demo debris at the completion of work. Debris will be removed from the installation and disposed at an off-base facility designated for the material.
- All asbestos removal shall comply with 40 CFR 61 and 763 (U S EPA), 29 CFR 1910.1001 1926.1101, 1910.134 (OSHA), 49 CFR 172-177 (Dept. of Transportation), SRCAA Regulation I Article IX, Washington Administrative Code (WAC) Chapters 296-62 and 296- 65, Department of Labor and Industries regulations, and applicable Air Force Instructions (AFIs).
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES: The government will provide access to utilities as needed.
4. GENERAL INFORMATION
4.1. HOURS OF OPERATION: Hours of operation are 0700-1630 Monday through Friday, excluding Federal Holidays and any other designated down day. Work can be done at other than the normal hours of operation with the approval of the Contracting Officer. The contractor shall coordinate in advance all hours of work and any service interruptions with Civil Engineering points of contact.
January 1 New Year’s Day 3rd Monday in January Martin Luther King, Jr. Day 3rd Monday in February President’s Day Last Monday in May Memorial Day June 18 Juneteenth July 4 Independence Day 1st Monday in September Labor Day 2nd Monday in October Columbus Day November 11 Veterans Day 4th Thursday in November Thanksgiving Day December 25 Christmas
4.2. SECURITY REQUIREMENTS: All personnel employed by the Contractor in the performance of this contract, or any representative of the Contractor entering the government installation, shall abide by all Fairchild Air Force Base security regulations.
5. PERFORMANCE PERIOD: Project shall not exceed 30 days after contract award.
6. APPENDICES:
Attachment 1: Facility Floor Plan and Location of Work Area