Attach 1 Statement of Objective (SOO)_dated 4-9-2020_final.pdf
PDF 104 KB Posted
- Attached to
- Solicitation Federal contract opportunity
- Solicitation number
- 70FBR220Q00000057
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFQ 70FBR220Q00000057.pdf | ||
| Attach 2 DOL Wage Determination PR20200001 dated 1-3-2020.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Objective (SOO) Western Shelter Containerized Facilities
Water and Sewer Line Construction and Electrical Connection
DR-4493-PR
PROJECT BACKGROUND & DESCRIPTION
Design and installation of temporary potable water and sanitary piping and electrical installation for temporary structures located at Mayaguez Medical Center, Mayaguez, Puerto Rico.
FEMA has a need for build out of potable water and grey water piping with water storage and or services to empty out grey waters and electrical installation for temporary Western Shelter containerized kitchen, two laundry, and two-bathroom facilities at Mayaguez Medical Center’s back parking lot.
PROJECT OBJECTIVE
The Department of Homeland Security (FEMA) is requesting services for constructing and installation of potable water, grey water piping and electrical connection of containerized personal hygiene and kitchen facilities for the temporary Western Shelter Hospital located at Mayaguez Medical Center. Contractors may propose using existing potable water and sanitary piping at Mayaguez Medical Center and installing an independent water management system using water tanker pumps and water storage system. Contractors shall so provide a proposal for installation of electrical connectivity and grounding of containerize facility.
PROJECT SCHEDULE
FEMA requests all work be completed, and the worksite returned to pre-construction condition within four (4) calendar days of receipt of award.
REQUIREMENTS
Construction
1. Mechanical/plumbing design and installation
2. Construction, design and fabrication
3. Disposal of grey waters.
Installation
1. Electrical Connectivity
2. Grounding of containers
Things to Consider
1. Location of containerized facilities.
2. Distance of existing potable water (cold and hot) and sanitary piping:
a. Location A (approximately 300 feet from Western Shelter Hospital)
i. Sanitary pipe is approximately 160 feet from Location A
ii. Potable water pipe location is approximately 25-30 feet from
Location A.
3. Contractor shall develop and install process for disposal of grey waters if proposing to install water tanker and pumps.
4. Electrical work will include material and parts needed for connectivity, ex. Electrical feeder, feeder cable, wiring, etc. Providing this material is the responsibility of the contractor
5. All installation will be designed for install at the micro-grid located next to the containerized structure
6. All exposed pipes and wiring on the exterior of the structures, shall be covered with plywood.
7. Contractor is to complete all work within four calendar days of receipt of contract.
Location Address Mayaguez Medical Center Ave. Hostos #410 PR-2 Bo Sabalos
Mayaguez, PR 00681
File details come from the government source that posted it. Updated .