Attach-1-SOW.pdf
PDF 167 KB Posted
- Attached to
- OK-SALT PLAINS NWR SANDPIPER BRIDGE
- Solicitation number
- 140F0220R0035
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach-6-References and Clauses.pdf | ||
| Attach-2-Photo Bridge.jpg | JPG image | |
| Attach-3-Price Sheet Sheet.xlsx | XLSX spreadsheet | |
| Attach-7-GeoTech Report.pdf | ||
| Attach-5-DBA Min. Wage Rates.pdf | ||
| Sol_140F0220R0035.pdf | ||
| Attach-4-Location Map.png | PNG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Construction
Sandpiper Bridge on Salt Plains NWR
1. General:
1.1 The purpose of this work is to design/engineering, fabrication, delivery and installation of a metal foot bridge Fabricated Structural Metal Manufacturing) to be placed along Sandpiper nature trail on Salt Plains National Wildlife Refuge (NWR) at 71189 Harper Road, Jet, Oklahoma 73749- 4953.
1.2 This foot bridge will replace one that was destroyed during a flood event in 2019. The bridge carries pedestrian and disabled visitors (roughly 9,000/year) across sensitive salt flats habitat, to an observation deck with a spotting scope at the end of the trail. Without this bridge, the trail has been closed to visitors for safety concerns and to protect refuge resources.
1.3 Contractor Qualifications: Contractor must be able to design/engineer, fabricate, deliver, and install a metal framed foot bridge, including abutments/anchors on Salt Plains
NWR.
2. Place of Performance and Period of Performance: Sandpiper Nature Trail on Salt Plains NWR. To be completed by December 31, 2020.
2.1 Complete address is 71189 Harper Road, Jet, Oklahoma 73749-4953. Design, engineering and fabrication to occur off-site. Site construction and bridge erection to occur at Sandpiper trail parking lot and bridge location along trail.
2.2 Period of performance= 30 days for delivery of design and 60 days for completion of bridge construction.
Performance start date will be upon contract award.
2.3 Normal duty hours Monday thru Friday 7:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 Contractor shall update the Contracting Officer’s Rep. (COTR)-Shane Kason and Contracting Officer (CO)- Ray Fletcher throughout the process to coordinate activities as construction progresses.
4. Deliverables and/or Delivery Schedule:
4.1 Contractor shall manufacture one (1) 6’6” wide by 40’ long pedestrian bridge with Pratt trusses made of steel and galvanized, then painted. Bridge shall include ADA compatible horizontal handrailing, composite decking with pedestrian load rating of 90 PSF with 1,200# cart loading.
Contractor shall transport or provide freight of the bridge to the erection site.
Contractor shall complete site construction to include; site grading and preparation, construction or installation of abutments.
Contractor shall erect bridge on site, anchor all connections, and install expansion joints.
4.2 Contractor shall provide Salt Plains NWR with an Oklahoma PE stamped design and calculation package for the bridge, and for the abutments and anchors.
5. Government-Furnished Equipment (GFE) / Government-Furnished Information
(GFI)
6.1 The Government will provide geo-technical and site survey needed for the contractor to determine abutment and/or anchoring needs -See Attachment.
7. Final Acceptance
7.1 Government acceptance is contingent upon: Inspection of the bridge and erection materials as they are delivered to the site, and a final, post-erection inspection of the bridge and all related installation materials and workmanship.
8. Quality Control/Quality Assurance:
8.1 Quality Control is the contractor’s responsibility, per contract cluse 52.246-12.
9. Technical Coordinator:
9.1 Technical point of contact shall be: Shane Kasson, Refuge Manager, Salt Plains NWR, 71189 Harper Road, Jet, Oklahoma 73749-4953.
9.2 Secondary POC shall be: Barry Smart, Supervisory Wildlife Refuge Specialist, Salt Plains NWR, 71189 Harper Road, Jet, Oklahoma 73749-4953.
End.
| STATEMENT OF WORK |
| 1. General: |
| 2. Place of Performance and Period of Performance: Sandpiper Nature Trail on Salt Plains NWR. To be completed by December 31, 2020. |
| 2.1 Complete address is 71189 Harper Road, Jet, Oklahoma 73749-4953. Design, engineering and fabrication to occur off-site. Site construction and bridge erection to occur at Sandpiper trail parking lot and bridge location along trail. |
| 2.2 Period of performance= 30 days for delivery of design and 60 days for completion of bridge construction. |
| Performance start date will be upon contract award. |
| 2.3 Normal duty hours Monday thru Friday 7:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information. |
| 2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day). |
| 3. Scope |
| 4. Deliverables and/or Delivery Schedule: |
| 4.1 Contractor shall manufacture one (1) 6’6” wide by 40’ long pedestrian bridge with Pratt trusses made of steel and galvanized, then painted. Bridge shall include ADA compatible horizontal handrailing, composite decking with pedestrian load rating o... |
| Contractor shall transport or provide freight of the bridge to the erection site. |
| Contractor shall complete site construction to include; site grading and preparation, construction or installation of abutments. |
| Contractor shall erect bridge on site, anchor all connections, and install expansion joints. |
File details come from the government source that posted it. Updated .