Attach 1 - SOW.pdf
PDF 281 KB Posted
- Attached to
- Fabricated Steel -Sub Assembly Test Federal contract opportunity
- Solicitation number
- 1333ND20QNB730254
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CSS -Steel Parts.pdf | ||
| Attach 3 - PP Ques.pdf | ||
| Attach 2 - AppendixA.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work/Specifications
Fabricated Steel -Sub Assembly Test
1. Background
The National Fire Research Laboratory (NFRL) at the National Institute of Standards and Technology (NIST) is currently developing a versatile self-reacting reconfigurable steel frame setup for testing structural sub-assemblies under combined mechanical loading and fire exposure. The objective of this test program is to quantify the structural performance and failure modes of the structural sub-assemblies such as shear connections subjected to mechanical load and fire. As the large-scale structural fire tests conducted in the laboratory’s highly demanded existing strong-floor are extremely resource demanding and challenging to repeat, this component-level testing capability will allow repeatable tests with less resource, time, and laboratory space. The capacity to test replicate specimens will fill the gap in our knowledge of the uncertainty in the response of the structures and help to validate computational models predicting the behavior of similar type of structural sub-assemblies and thus to enhance the fire safety and building codes in the United States.
2. Objective The purpose of this acquisition is to procure fabricated structural steel and delivery to the NFRL located in Building 205 at NIST in Gaithersburg, MD. These components (members) will provide the framework for self-reacting reconfigurable steel frame setup. NIST will provide design drawings for the components.
Fabrication tolerances on the specified dimensions are critical to ensure that the system can be assembled together as required.
3. Specific Requirements
3.1 Summary
The Contractor shall provide the equipment, materials, and labor necessary to fabricate the components and deliver them to the NFRL in Building 205 at NIST in Gaithersburg, MD. All structural steel elements shall be fabricated in accordance with the following standards:
1. American Institute of Steel Construction (AISC) Specification for Structural Steel Buildings (ANSI/AISC 360-16)
2. American Society for Testing and Materials (ASTM) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, Sheet Piling (ASTM A6- 17a)
3. American Welding Society (AWS) Structural Welding Code – Steel (AWS D1.1/D1.1M:2015)
4. Research Council on Structural Connections (RCSC) Code of Standard Practice for Steel Buildings and Bridges (AISC 303-10)
Detailed drawings of the different components, including quantities, dimensions and materials, are provided in the attached document titled: NIST-FabricatedSteelMaterials-SubAssemblyTest_AppendixA.pdf.
Table 1 lists submittals that are required by this statement of work, as specified in Section 3.4. Performance requirements for the components are described in Section 3.3, quality assurance requirements are specified in Section 3.5, and materials are specified in Section 3.6.
Table 1 – Required submittals Submittals Specific Requirements Documentation of qualifications1 Item A in Section 3.4.1 Documentation of past performance1 Item B in Section 3.4.1 Material certificates Item C in Section 3.4.1 1Required as part of the initial quotation submission. Specific instructions to offerors and evaluation criteria are identified in the Combined Synopsis Solicitation document.
As indicated in Table 1, the Contractor shall provide two of the required informational submittals (documentation of qualifications and documentation of past performance) as part of the initial quotation submission. These submittals will be considered as part of the selection criteria for the award of the contract (see Section 7), and they shall demonstrate that the quality assurance requirements specified in Section 3.5 are met by the contractor. Requirements for fabrication are specified in Section 3.7. As specified in Section 3.7.1, this project requires exacting fabrication tolerances to ensure that they can be assembled together as required into relatively complex test setup configurations.
The Contractor shall follow the process related to delivery, storage, and handling as specified in Section 4.
NIST will inspect each component for damage upon delivery and evaluate the fabrication tolerance as specified in Table 2 and in Section 5.
Table 2 – Inspection and evaluation requirements for acceptance of components Required Inspection or Evaluation Specific Requirements Inspection upon delivery See Item A in Section 5 Evaluation of fabrication tolerances See Item B in Section 5
3.2 Components and Detailed Requirements
The drawings are attached in Attachment 2-Appendix A -NIST-FabricatedSteelMaterials- SubAssemblyTest_AppendixA.pdf, and provide details on the sections, dimensions, quantities, and other technical information for each component. There are a total of 46 components to be fabricated. There are seven total types, varying in quantities between 1 and 12 of each type detailed on drawings A1 through A7.
Table 2 shows the quantities required of each component.
Table 2 – Components
CLIN
NO
DWG
No.
Component Quantity
0001 A1 W14x134 (Length = 12 ft, with holes, coated with primer) 6 0002 A2 W14x134 (Length = 17 ft-2 in, with holes and welded end plates, coated with primer) 4
0003 A3 W14x134 (Length = 7 ft-10 in, with holes and welded end plates, coated with primer) 4
0004 A4 W14x134 (Length = 7 ft-10, with holes) 4 0005 A5 L8x8x1 Angle (Length= 1ft-6 in, with holes) 4 0006 A6 C12x30 Channel (Length= 5-3/4 in, with holes) 12 0007 A7 PL 5.5 x 3 x 0.5 in. (with holes) 12
3.3 Performance Requirements
All structural steel members must be cleaned and surfaced by removing all loose mill scale, loose rust, loose paint, and other loose detrimental foreign matter by power wire brushing, power sanding, power grinding, power tool chipping, and power tool descaling. Surfaces of steel materials in Drawings A1-A3 are then to be coated with a minimum of one coat of shop primer.
3.4 Required Submittals
3.4.1 Informational Submittals
A Documentation of Qualifications: Must be submitted with the quotation. See Instructions to Offerors and Evaluation Criteria Section of the attached Combined Synopsis/Solicitation.
B. Documentation of Past Performance: Must be submitted with the quotation. See Instructions to
Offerors and Evaluation Criteria Section of the attached Combined Synopsis/Solicitation.
C. Welding Certificates: Must be submitted with quotations. See Instructions to Offerors and
Evaluation Criteria Section of the attached Combined Synopsis/Solicitation. Copies of certificates for welding procedure specifications (WPS) and shop and/or personnel certification(s).
D. Material Certificates (Material Test Report (MTR)/ Mill Test Report): Signed by manufacturers certifying that for any of the following items, the chemical analysis and mechanical properties are in conformance with the specified specification requirements.
1. Structural steel shapes, such as rolled wide-flange sections, L-angles, and channels.
2. Structural steel plate materials.
3.5 Quality Assurance
A. Fabricator Qualifications:
1. Certified and participates in the American Institute of Steel Construction’s (AISC’s)
Certification program at the time of bidding and is certified through the AISC as a Certified Building Fabricator (BU, formerly STD). Fabricators also meeting AISC’s bridge certifications (Certified Bridge Fabricator – Simple (SBR), Certified Bridge Fabricator – Intermediate (IBR), and/or Certified Bridge Fabricator – Advanced (ABR)) are preferred.
2. Certification shall be maintained throughout the fabrication of the materials. Fabrication shall immediately cease if at any time the fabricator’s certification is revoked, regardless of the status of completion of contracted work. Fabrication will not be allowed to re-start until the necessary corrections are made and certification has been re-established. In the event certification cannot be re-established in a timely manner, causing project delays, the fabricator, at no additional cost, will contract out the remainder of the units to be manufactured at an AISC-certified fabricator.
B. Design Standards: Comply with the AISC Code of Standard Practice for Steel Buildings and
Bridges (COSP), which sets forth criteria for the trade practices involved in steel buildings, bridges and other structures.
C. Quality-Control Standard: For quality control recommendations for the types of components required by this performance statement, comply with 2016 AISC Code of Standard Practice for Steel Buildings and Bridges (COSP). Must comply with dimensional tolerances specified in Section 3.7.1.
D. Welding: Qualify procedures and personnel according to the American Welding Society’s Structural Welding Code – Steel (AWS D1.1/D1.1M:2015).
3.6 Materials
3.6.1 Rolled Structural Shapes
A. Rolled Structural Steel: Wide-flange sections (W): ASTM A992 (Grade 50)
B. Rolled Structural Steel: C-channels (C): ASTM A36
C. Rolled Structural Steel: Angles sections (L): ASTM A36
D. Steel Plates: ASTM A36
3.7 Fabrication
3.7.1 Fabrication Tolerances
As noted in Section 3.1, this project requires exacting fabrication tolerances. Fabricate components, so each finished component shall comply with the tolerances specified in the fabrication drawings and relevant ASTM specification for component dimensions, center-locations and diameters of holes, dimensions of cutouts, and, flatness, planeness, and rightness.
4. Delivery, Storage, and Handling The Contractor shall deliver the components to the NFRL at NIST, Gaithersburg. Delivery terms shall be FOB DESTINATION and take place no later than two (2) months ARO; however, delivery shall not take place until the contractor coordinates with the designated TPOC and Contracting Officer.
Prior to shipment, the Contractor must ensure NISTs campus is open and accepting deliveries. If the restrictions of access to the campus impacts delivery schedules, a modification shall be executed by the CO to establish an extended delivery timeframe.
The NFRL is directly accessible through a rollup door. NIST staff will unload the components from the delivery truck(s) inside the NFRL using the overhead crane and/or forklift(s). The Contractor shall comply with the following requirements for Handling, Storage, and Delivery of the system.
A. Deliver all components to assure compliance with the agreed upon project schedule (see Section 6).
B. Handle and transport components in a manner to avoid excessive stresses that could cause deformations or other damage.
5. Inspection and Acceptance NIST staff will inspect each delivered component for acceptance. Components that do not comply with the standards listed in Section 3.1, or that do not meet the tolerances specified in Section 3.7.1, are unacceptable. Additional requirements for inspection and acceptance are specified in the following.
A. Upon delivery, NIST staff will inspect each component for damage sustained during transportation.
B. Review and inspection of whether the fabrication tolerances are adequate for each component to perform as required will be conducted in accordance with Section 5.1.
1. Grinding of certain steel components by the Contractor may be permitted by NIST to meet certain fabrication tolerances on overall length or thickness, provided that the extent of grinding is approved by NIST and will not impair the structural adequacy, serviceability and durability of the component.
C. An item is unacceptable when damage or deficiencies are identified that cannot be resolved through repairs and that would prevent it from performing as required. Each component will be inspected for damage upon delivery in accordance with Item A, and subsequently evaluated in accordance with Item B. When an item is unacceptable, that item shall be replaced with new component(s) that comply with the requirements within three weeks at no extra cost.
5.1 Inspection and Acceptance of Fabrication Tolerances
To determine whether the fabrication tolerances are adequate for the components to perform as intended, two different sets of procedures will be employed wherever applicable, as outlined in Section 5.1.1.
5.1.1 Measurement of Dimensions, Flatness, and Levelness
Selected critical measurements of the components will be taken as specified in the following. Deviations in these measurements that exceed the fabrication tolerances specified in Section 3.7.1. are unacceptable.
Certain unacceptable deviations may be corrected by grinding (see Item B1 in Section 5), but only provided that the extent of grinding is approved by NIST and will not impair the structural adequacy, serviceability and durability of the component.
A. Length, Width, Height, Hole Diameter: The length, width, height, and other relevant dimensions, may be measured at up any location for any component. Dimensions may be measured using a tape measure, Vernier caliper, laser, or any other measurement device of NIST’s choosing, provided that the accuracy of the measurement device exceeds the specified tolerances.
B. Center-to-Center Spacing between Through- and Threaded-Holes: Center-to-center spacings between through- and threaded-holes may be measured using a tape measure, Vernier caliper, laser, or any other measurement device of NIST’s choosing, provided that the accuracy of the measurement device exceeds the specified tolerances.
C. Flatness, Planeness, Rightness: The maximum deviation from flatness, planeness, or rightness of welded assemblies may be measured using a tape measure, Vernier caliper, laser, carpenters square, protractor, inclinometer, or any other measurement device of NIST’s choosing, provided that the accuracy of the measurement device exceeds the specified tolerances.
6. Schedule The Contractor shall deliver all products and services in accordance with the schedule specified in Table 4. All dates are specified in calendar days.
Table 4 – Project schedule Description Date Delivery of the components of the framing connections to NIST:
1. All components 2.Material certificates (Section 3.4.1, Item D)
Within two (2) months after date of award;
however, delivery shall not take place until the contractor coordinates with the designated TPOC and Contracting Officer. Prior to shipment, the Contractor must ensure NISTs campus is open and accepting deliveries. If the restrictions of access to the campus impacts delivery schedules, a modification shall be executed by the CO to establish an extended delivery timeframe.
Acceptance of components after completion of inspections and evaluations 30 days after receipt of all components
7. General Information Safety: Contractor employees shall be responsible for knowing and complying with NIST installation safety prevention regulations. Such regulations include, but are not limited to, general safety, fire prevention, and waste disposal.
Security: NIST is a restricted campus. An identification badge is required for access, for entry into buildings, and is shown to the armed Security Police when entering the NIST Gaithersburg campus.
Identification Badges: Contractor employees shall comply with NIST identification and access requirements. The Contractor employees are responsible for absences due to expired identification and access documents. Each Contractor employee shall wear a visible identification badge provided by the NIST Security Office. The badge must show the full name, title, and if required by NIST, the words “Contractor” in front.
Contractor Registration: The contractor shall provide the name and citizenship information of the on-site technician(s) or delivery personnel to the NIST POC prior to arrival at the NIST Gaithersburg campus. The
POC will submit the name(s) and citizenship information to the NIST Office of Security in order for a given Contractor employee to enter the NIST Gaithersburg campus to deliver the materials.
Vehicle Registration: All Contractor employees must register their vehicles with the NIST Security Office to gain access to the campus. A valid driver’s license, Government-furnished civilian ID, proof of insurance and current registration must be presented to the NIST Security Office, at which time a NIST vehicle pass will be issued.
9. ATTACHMENTS
Drawings: Attachment 2 – Appendix A-“NIST-FabricatedSteelMaterials- SubAssemblyTest_AppendixA.pdf”
Attachment 3: Past Performance Questionnaire Template
| 1. Background |
| 2. Objective |
| 3. Specific Requirements |
| 3.1 Summary |
| 3.2 Components and Detailed Requirements |
| 3.3 Performance Requirements |
| 3.4 Required Submittals |
| 3.4.1 Informational Submittals |
| 3.5 Quality Assurance |
| 3.6 Materials |
| 3.6.1 Rolled Structural Shapes |
| 3.7 Fabrication |
| 3.7.1 Fabrication Tolerances |
| 4. Delivery, Storage, and Handling |
| 5. Inspection and Acceptance |
| 5.1 Inspection and Acceptance of Fabrication Tolerances |
| 5.1.1 Measurement of Dimensions, Flatness, and Levelness |
| 6. Schedule |
| 7. General Information |