CINCH HOOK CRUSH AND STOCKPILE
Solicitation number
127EAX21Q0035
Issued by

About this file

This document includes a schedule of items and specifications for the Cinch Hook Pit Crushing and Stockpile federal contract opportunity issued by the Department of Agriculture Forest Service. The contract involves mobilization, clearing and grubbing, drilling, blasting, sampling and testing of aggregate materials, surveying for quality control, and crushing and stockpiling of aggregate grading "G" in accordance with provided plans and specifications. The schedule of items lays out pay items including aggregate gradation sampling and testing, stockpiled aggregate quantities and unit costs, and totals for the base contract and options A through D. The base contract involves approximately 20,250 cubic yards of stockpiled aggregate. Options A through D each involve additional stockpiling of 1,250 cubic yards of aggregate material.

View the file

Other files

File Type Posted
127EAX21Q0035 0001.pdf PDF
127EAX21Q0035.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF ITEMS
PROJECTCinch Hook Pit Crushing and Stockpile
UNITMogollon Rim Ranger District
SOLICITATION #127EAX21Q0035
Base
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
154 (01)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1EA$$
314 (01)Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costsCQ20250CY$$
.
TOTAL BASE$
Option A
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
154 (02)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1EA$$
314 (02)Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costsCQ1250CY$$
TOTAL OPTION A$
Option B
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
154 (03)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1EA$$
314 (03)Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costsCQ1250CY$$

TOTAL OPTION B $

Option C
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
154 (04)Aggregate Gradation Sampling & Testing including surveying for quality controlLS1EA$$
314 (04)Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costsCQ1250CY$$

TOTAL OPTION C $

Option D
Method ofEstimatedEstimated
Pay ItemDescriptionMeasureQuantityPay UnitUnit CostTotal
154 (05)Aggregate Gradation Sampling & Testing including surveying for quality controlCQ3EA$$
314 (05)Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costsCQ1250CY$$

TOTAL OPTION D $

TOTAL BASE$
TOTAL OPTIONS$

TOTAL BASE + OPTIONS $