Attach 1 - Schedule of Items.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- CINCH HOOK CRUSH AND STOCKPILE
- Solicitation number
- 127EAX21Q0035
About this file
This document includes a schedule of items and specifications for the Cinch Hook Pit Crushing and Stockpile federal contract opportunity issued by the Department of Agriculture Forest Service. The contract involves mobilization, clearing and grubbing, drilling, blasting, sampling and testing of aggregate materials, surveying for quality control, and crushing and stockpiling of aggregate grading "G" in accordance with provided plans and specifications. The schedule of items lays out pay items including aggregate gradation sampling and testing, stockpiled aggregate quantities and unit costs, and totals for the base contract and options A through D. The base contract involves approximately 20,250 cubic yards of stockpiled aggregate. Options A through D each involve additional stockpiling of 1,250 cubic yards of aggregate material.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 127EAX21Q0035 0001.pdf | ||
| 127EAX21Q0035.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF ITEMS | ||||||
| PROJECT | Cinch Hook Pit Crushing and Stockpile | |||||
| UNIT | Mogollon Rim Ranger District | |||||
| SOLICITATION # | 127EAX21Q0035 | |||||
| Base | ||||||
| Method of | Estimated | Estimated | ||||
| Pay Item | Description | Measure | Quantity | Pay Unit | Unit Cost | Total |
| 154 (01) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | EA | $ | $ |
| 314 (01) | Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costs | CQ | 20250 | CY | $ | $ |
| . | ||||||
| TOTAL BASE | $ | |||||
| Option A | ||||||
| Method of | Estimated | Estimated | ||||
| Pay Item | Description | Measure | Quantity | Pay Unit | Unit Cost | Total |
| 154 (02) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | EA | $ | $ |
| 314 (02) | Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costs | CQ | 1250 | CY | $ | $ |
| TOTAL OPTION A | $ | |||||
| Option B | ||||||
| Method of | Estimated | Estimated | ||||
| Pay Item | Description | Measure | Quantity | Pay Unit | Unit Cost | Total |
| 154 (03) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | EA | $ | $ |
| 314 (03) | Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costs | CQ | 1250 | CY | $ | $ |
TOTAL OPTION B $
| Option C | ||||||
| Method of | Estimated | Estimated | ||||
| Pay Item | Description | Measure | Quantity | Pay Unit | Unit Cost | Total |
| 154 (04) | Aggregate Gradation Sampling & Testing including surveying for quality control | LS | 1 | EA | $ | $ |
| 314 (04) | Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costs | CQ | 1250 | CY | $ | $ |
TOTAL OPTION C $
| Option D | ||||||
| Method of | Estimated | Estimated | ||||
| Pay Item | Description | Measure | Quantity | Pay Unit | Unit Cost | Total |
| 154 (05) | Aggregate Gradation Sampling & Testing including surveying for quality control | CQ | 3 | EA | $ | $ |
| 314 (05) | Stockpiled Aggregate, Grading "G" per 703 Aggregate, Mobilization Including bonding costs | CQ | 1250 | CY | $ | $ |
TOTAL OPTION D $
| TOTAL BASE | $ |
| TOTAL OPTIONS | $ |
TOTAL BASE + OPTIONS $