Attach 1-PWS for Emergency Repair of KELLENBERGER ON Grinders 04OCT23.docx
DOCX document 18 KB Posted
- Attached to
- Emergency Repair of Kellenberger Grinders
- Solicitation number
- W911KF-24-Q-0001
About this file
This performance work statement outlines the requirements for emergency repair of three Kellenberger outside dimension grinders at Anniston Army Depot in Alabama. The contractor will be responsible for disassembling the grinders, assessing any deficiencies, and notifying the contracting officer's representative of any additional parts or services needed beyond those included in the attached quotation. The contractor must perform the work with minimal government assistance to return the grinders to like-new condition. The contractor must also provide certificates of alignment and calibration for each grinder upon completion of repairs. All necessary parts and equipment must be shipped by the contractor to the depot. No changes to the scope of work will be authorized except in writing from the contracting officer.
The related federal contract opportunity is a solicitation from the Department of the Army Materiel Command Contracting Command Detroit Arsenal for the emergency repair of the three Kellenberger grinders identified in the performance work statement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KF-24-Q-0001 Released.pdf | ||
| Attach 3-Evidence of Authority To Sign Offers.pdf | ||
| Attach 4-Wage Determination.pdf | ||
| Attach 2-Kellenberger Pricing Break Out 675444 675443 675527 to be completed.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement for Kellenberger Outside Dimension Grinders Emergency Repairs
Scope: This specification establishes a requirement for repair of three each Computer Numerical Controlled Kellenberger KEL VISTA Outside Dimension Grinding Centers. This scope of work shall be limited to three Computer Numerical Controlled Kellenberger KEL VISTA Outside Dimension Grinding Centers that will referred to as grinders in the performance work statement.
1.1 Grinders
Subject grinders are used in multiple grinding processes throughout Anniston Army Depot’s (ANAD) turbine engine overhaul supporting mission readiness for the M-1 Abrams Family of Vehicles. Serial Numbers are 675444, 675443 and 675527. The contractor shall only perform services on one grinder at a time as to not impede the current level of production in the overhaul of turbine engines.
1.2 Requirements
The contractor shall be responsible for disassembly, assessment of any and all deficiencies with the three each grinders. The contractor shall then notify the contracting office representative (COR) and Contract Specialist if there are any further service and parts requirements beyond those found on the attached quotation for the emergency repair. At the time the Contracting Officer (KO) advise all parties on the path to proceed in writing. The contractor shall perform any and all duties with minimal government assistance to bring grinders back to like new condition.
2.0 Alignment and Certification
The contractor shall provide certificates of alignment and/or calibration for each grinder. Certificates shall include the following information as stated in statement one of section 1.1 and 1.2 of this Statement of Work.
Equipment Description / Nomenclature Equipment Model Number Asset Serial Number
These requirements shall be included for the asset being repaired as well as the Test Equipment used to perform the alignment and/or calibration for each grinder.
3.0 Site
Contractor shall be responsible for shipment of all needed parts and equipment required to repair each grinder to Anniston Army Depot 7 Frankford Avenue Anniston, AL 36201 Bldg. 133 ATTN. Jason “Adam” Harvey. See attached spreadsheet marked Kellenberger Parts Break Out 675444 675443 675527 for breakout of required parts and or components.
4.0 Scope Changes.
The Contractor shall not proceed with any verbal or written change(s) to the scope of work from sources other than the Contracting Officer, who will provide changes in writing.
File details come from the government source that posted it. Updated .