Attach 1. - Performance Work Statement.pdf

PDF 189 KB Posted

Attached to
Saucier HEF Grounds Maintenance Federal contract opportunity
Solicitation number
12444725Q0019
Issued by
Department of Agriculture Forest Service

About this file

This Performance Work Statement (PWS) details grounds maintenance services for the USDA Forest Service Southern Research Station's Harrison Experimental Forest (HEF) in Saucier, Mississippi. The contract requires bi-monthly lawn maintenance from April through October, including mowing grass to maintain a height between 3.5-4.5 inches, edging, trimming, debris removal, and weed control. Specific requirements include using mulching blades, carefully mowing around scientific instruments and historical buildings, removing clippings from sidewalks and parking areas, and trimming shrubs three times yearly in April, July, and October.

The contract period is from June 15, 2025, to June 14, 2025, with four potential one-year option periods extending through June 14, 2030. Services must be performed Monday through Friday, excluding U.S. government holidays, with payment processed monthly through the Invoice Processing Platform (IPP) after service completion. The contractor is responsible for all equipment, supplies, and labor, and must follow strict quality control measures, with a performance standard of 95% facility satisfaction and no more than 5 customer complaints per service period. Additional requirements include using bio-based products, following safety protocols, and maintaining a harassment-free work environment.

View the file

Other files for this federal contract opportunity

Other files attached to Saucier HEF Grounds Maintenance, newest first.
File Type Posted
Q and A Saucier HEF Grounds Maintenance.pdf PDF
Attach 5. - Draft Quality Assurance Surveillance Plan.pdf PDF
12444725Q0019 Saucier HEF Grounds Maintenance.pdf PDF
Attach 2. - Wage Determination.pdf PDF
Attach 3. - HEF Site Map.pdf PDF
Attach 4 - Experience Questionaire.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SRS

Saucier, MS

Grounds Maintenance

Attachment 02

PERFORMANCE WORK STATEMENT

LAWN CARE MAINTENANCE SERVICES

FOR

USDA FOREST SERVICE, SAUCIER, MS

1.0 SCOPE

The service in this contract will consist of all jobs necessary to maintain and meet the technical specifications. This needs to be consistent with what normally is expected around commercial buildings.

The Contractor shall provide all labor, supplies, supervision, tools, materials, equipment, and transportation necessary to provide grounds maintenance.

The Contractor is responsible for and will replace within 24 hours, any damage caused by mowing or trimming or by flying rocks or debris. This includes but not limited to HVAC & blower units, sewer caps/lines, in ground lighting, meter or valve boxes or other structures.

Special caution is needed around the historical buildings and rock walls, scientific instruments, weather stations and parked vehicles. Damage to plants/hedges/trees caused by Contractor will be replaced within 48 hours. All areas shall be kept clean, neat, free of fire and safety hazards, and unsanitary conditions.

2.0 PLACE OF PERFORMANCE

Grounds maintenance services are required for the USDA Forest Service, Southern Research Station, Harrison Experimental Forest (HEF), 23332 Success Rd, Saucier, MS 39574. The area to be maintained is highlighted in the map provided.

3.0 TECHNICAL SPECIFICATIONS

3.1 GROUNDS MAINTENANCE Two times a month from April 1 to October 31, spaced at least 12 days apart and not more than 16 days apart.

3.2 Prior to mowing, the Contractor shall remove all rubbish, debris, and trash. This includes but not limited to fallen limbs, rocks, paper, plastic or other objects.

3.3 The Contractor will mow the grass in a manner to continually maintain a height range of a minimum of 3.5 inches and maximum of 4.5 inches. Clippings on lawn areas shall be removed when there is such a concentration of clippings the life of the plants are in danger (no clumping). Grass cutting shall be accomplished in a manner such that it is free of scalping, rutting, bruising, uneven, and rough cutting. Contractor mower blades are to be sharp to provide a high-quality cut.

3.4 Mowing equipment for all areas shall utilize mulching blades.

3.5 Edging and trimming shall be accomplished concurrently with grass cutting operations.

Edging of sidewalks and other paved surfaces, and around other cultivated areas is to be accomplished to match the height and appearance of surrounding vegetation. Edging is to be accomplished in a manner such that it is free of scalping, rutting, bruising, uneven and rough cutting. Edging shall include removal of vegetation from cracks in sidewalks, driveways, parking areas, and curbs. Trees, plants, and shrubs shall not be damaged by any trimming operations. If damaged the Contractor will replace or repair within 48 hours at no additional cost to the customer.

3.6 Trimming of shrubs will be performed 3 times yearly. The shrubs shall be trimmed according to the customers specifications (neatly, with uniform appearance and not encroaching on buildings or sidewalks) in April, July, and October. When trimming shrubs, all unwanted vegetation shall be removed.

3.7 When mowing around the weather stations, scientific instruments, HVAC units, buildings, and parked vehicles, Contractor MUST NOT blow materials towards these facilities, structures, or items.

3.8 Keep weed-free all sidewalks and driveways, parking areas during regular mowing period (April-October) with one winter (January) retreatment if needed. Contractor will remove and control weed growth utilizing an approved and safe herbicide or other eradiation treatment, physical removal by hand, or with garden tools. Herbicides should follow all local, state, and federal regulations and applied correctly.

3.9 Contractor is responsible for any damaged to HVAC units, coils or blower units caused by trimming or blowers and shall be replace or repair within 24 hours at no additional cost to the customer.

3.10 Contractor shall sweep or blow all clippings from sidewalks, parking areas, curbs, and all entrances to buildings following any mowing, trimming, and edging. Contractor shall never blow clippings into the scientific instruments, and weather station. Blow all debris and insects off porch areas.

4.0 SAFETY

The Contractor will be responsible for conducting appropriate safety measures. No one under the age of 18 allowed on the worksite due to safety reasons.

5.0 CONTRACTOR FURNISHED ITEMS

All equipment and supplies necessary to perform the statement of work.

6.0 PERIOD OF PERFORMANCE

The anticipated period of performance for this contract is from June 15, 2025 to June 14, 2025

Four potential option year periods are also included in this requirement:

Option 1 - Period of Performance: June 15, 2026 to June 14, 2027

Option 2 - Period of Performance: June 15, 2027 to June 14, 2028

Option 3 - Period of Performance: June 15, 2028 to June 14, 2029

Option 4 - Period of Performance: June 15, 2029 to June 14, 2030

7.0 INSPECTION AND ACCEPTANCE

7.1 Additional Inspection Requirements. The Government will make periodic random inspections to determine that Contractor complies with the specifications of this contract.

The Contractor is encouraged to observe these inspections.

7.2 Acceptance of the work will be made only after the Government has determined the work complies with the contract.

8.0 MEASUREMENT AND PAYMENT

This contract is a performance-based service contract. Payment is processed monthly on completion of services and receipt of a properly executed invoice in the Invoice Processing Platform (IPP.gov) system.

9.0 DELIVERIES AND PERFORMANCE

Hours of Performance. Grounds maintenance services shall be performed Monday through Friday except for U.S. Government holidays. Hours of services to be performed shall be coordinated with the COR.

11.0 INVOICING AND PAYMENTS:

All payments are processed using the Invoice Processing Platform (IPP). This is a mandatory requirement initiated by the U.S. Department of Treasury and you can find more information at this website:

https://www.ipp.gov/index.htm . Please make sure that your company has registered at https://www.ipp.gov/vendors/enrollment-vendors.htm to establish your account.

https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm

The IPP Customer Support Desk is available to assist users Monday through Friday (excluding Federal holidays) from 8:00 AM to 6:00 PM ET, to answer questions related to accessing IPP or completing the registration process. Their toll free number is 1-866-973-3131 or they can be reached at IPPCustomerSupport@fms.treas.gov . If you have additional questions or concerns, please contact the Controller Operations Division Help Desk at 1-877-243-3072 or cod.help@usda.gov

12.0 BIOBASED PRODUCT:

The Contractor must comply with the Agriculture Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 9FSRIA), 7 U.S.C.

8102; the Federal Acquisition Regulations; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance”, dated October 2, 2009; EO 13423, “Strengthening Federal Environmental, Energy and Transportation Management;, dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Bio based and Sustainable Product Procurement,” dated February , 2012 to provide bio based products.

All supplies and materials shall be of a type and quantity that conform to applicable Federal specifications and standards, and to the extent feasible and reasonable; include the exclusive use of bio based and recycled products.

The following is a list of categories for bio-preferred products that are required for performance of this contract:

Disposable Containers (oil & lubricants). For more information regarding the Department of Agriculture Bio based Program go to https://www.biopreferred.gov mailto:IPPCustomerSupport@fms.treas.gov mailto:cod.help@usda.gov https://www.biopreferred.gov/

TASK FREQUENCY SCHEDULE

TASK/SERVICE FREQUENCY

Mow/cut grass maintain a height range of a minimum of 3.5 inches and maximum of

4.5 inches by mowing 2 times per month from April through October

Edging and Trimming Same day as mowing as needed to maintain a manicured look

Blowing of grass clippings. Contractor shall blow all clippings from sidewalks, parking areas, curbs, and away from all entrances of buildings Same day as mowing, following any mowing, trimming, edging

Removal of all rubbish, debris and trash

Same day as mowing

Keep sidewalks, driveways, parking areas weed free. Control weed growth in cracks in parking areas and sidewalks. As needed to maintain a manicured look

SERVICE DELIVERY SUMMARY

The Contractor service requirements are summarized as performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to the mission success.

GOVERNMENT QUALITY ASSURANCE PLAN FOR GROUNDS MAINTENANCE SERVICES

This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate Contractor actions with implementing this Statement of Work. It is designed to provide an effective surveillance method of monitoring Contractor performance for each listed objective on the Service Delivery Summary (SDS) in the maintenance contract.

The QASP provides a systematic method to evaluate the services the Contractor is required to furnish.

The Contractor and not the Government is responsible for management and quality control actions to meet the terms of the contract. The role of the government is quality assurance to ensure contract standards are achieved.

In this contract, the quality control program is the driver for service quality. The Contractor is required to develop a QUALITY CONTROL PLAN for inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved at the beginning of the contract provides the measures needed to lead the Contractor to success.

Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a high-quality assurance program.

Performance Objective Performance Threshold

Basic Maintenance Services 95% of all facilities are without customer complaints for the month

Pick up of debris, limbs, or trash each mowing. Random sampling of inspection reports by

COR

Mowing around the HEF/SIFG campus buildings, and grounds twice monthly. All clippings and trimming in this area MUST NOT have any blown materials thrown towards buildings, parked vehicles, HVAC units, or scientific instruments. This is a Critical Element as to how to mow/blow. The COR will provide the specifics on site as to not disrupt the scientific data. 100% of work must been done correctly in this area.

Mow and maintain the grasses on the HEF/SIFG campus in a manner to continually maintain a height range of a minimum of 3.5 inches and maximum of 4.5 inches during the growing season (April through October). Clippings on lawn areas should be removed when there is such a concentration of clippings the life of the plants are in danger.

Grass cutting shall be accomplished in a manner such that it is free of scalping rutting, bruising, and uneven and rough cutting. Contractor mower blades are to be sharp to provide a high-quality cut.

100% of work must been done correctly in this area.

All clippings are to be removed from sidewalks, parking areas, curbs, and all entrances to buildings immediately the day of mowing, trimming, and edging. 100% of work must been done correctly in this area.

Edging and trimming shall be accomplished concurrently with grass cutting operations. Edging of sidewalks and other paved surfaces, and around other cultivated areas is to be accomplished to match the height and appearance of surrounding vegetation. Edging is to be accomplished in a manner such that it is free of scalping, rutting, bruising, uneven and rough cutting. Edging shall include removal of vegetation from cracks in sidewalks, driveways, parking areas, and curbs. Trees, plants, and shrubs shall not be damaged by trimming operations. If damage the Contractor will replace or repair within 48 hours at no additional cost to the customer.

100% of work must been done correctly in this area.

Performance Objective Performance Threshold

Periodic Maintenance Services 95% of all facilities are without customer complaints for the month

Keep all sidewalks and driveways and paved parking areas weed free.

Contractor will remove and control weed growth in hedges, and plants around buildings, and parking areas; utilizing an approved and safe herbicide or other eradiation treatment, physical removal by hand, or with garden tools. Herbicides should follow all local, state and federal regulations and are to be followed when applying pesticides. However, NO SPRAY should be used in the area around the greenhouses and growing area where research materials are being grown.

100% of work must been done correctly in this area.

SURVEILLANCE: The government quality assurance (QA) person will receive complaints from Station personnel and pass them to the Contractor’s quality control inspector (QCI) for correction.

STANDARD: 95% of all facilities are without customer complaints for the month or service period. For example, the QA should receive no more than 5 customer complaints during the service period. The QA shall notify the contracting officer for appropriate action in accordance with FAR 52.212-4, Contract Terms and Conditions-Commercial Items or the appropriate Inspection of Services clauses, if any of the above exceed five customer complaints.

PROCEDURES: Any Harrison Experimental Forest (HEF), Forest Service employee that observes unacceptable services, either incomplete or not performed for any of the above performance objectives will notify the COR on site, and the COR shall immediately contact the Station QA personnel, and the QA will complete appropriate documentation to record the complaint. The QA will consider the customer complaint valid upon receipt from the COR on site. The QA will inform the customer of the approximate time the unacceptable performance will be corrected and advise the COR/customer. The COR/customer will notify the station QA if not corrected in the acceptable timeframe. The QA will consider complaints as resolved unless otherwise notified by the COR/customer. The QA shall verbally notify the Contractor’s Quality Control Inspector (QCI) and will be given 24 hours after verbal notification to correct the unacceptable performance. If the Contractor QCI disagrees with the compliant after investigation of the site and challenges the validity of the compliant, the Contractor will notify the stations QA. If the station QA determines the complaint as invalid, they will document the written complaint of the findings and notify the COR/customer on-site. The QA will retain the annotated copy of the written complaint for his/her files. If after investigation the QA determines the complaint is valid, the QA will inform the Contractors QCI and the QCI will be given an additional hour to correct the defect. A defect will not be recorded if properly and timely corrected the unacceptable condition(s) is accomplished. The Contractors QCI shall return the written customer complaint document, properly completed with actions taken, to the station QA. Recurring customer complaints are not permitted for any of the above service items. If a repeat customer complaint is received indicating the same deficiency during the service period (month, quarter, etc.) the QA will contact the Contracting Officer (CO).

POLICY ON PREVENTION OF WORKPLACE VIOLENCE

The Forest Service is committed to creating and maintaining a work environment in which all people are treated with dignity, fairness, and respect, and are free from harassment. This commitment extends to all Forest Service employees, contractors, and anyone who does business with us. We will hold any employee who engages in harassing behavior accountable. We can only take action when we are aware of the behavior, and encourage anyone who experiences or witnesses harassment by a Forest Service employee to immediately report it. Reports can be made to any Forest Service management official or by calling our Harassment Reporting Center toll free at (844) 815-8943. For more information, read the full Anti-Harassment Policy.

The Harassment Reporting Center was established in November 2017 to provide a dedicated resource to report harassment within the Forest Service. The Harassment Reporting Center is available 7 days a week from 7:00 a.m. to 11:00 p.m. Eastern by calling their toll-free number

– (844) 815-8943.

File details come from the government source that posted it. Updated .