Attach 05 - Contractor Special Conditions.pdf
PDF 117 KB Posted
- Attached to
- Machine Shop Mx - Accurpress Machine
- Solicitation number
- FA441825Q0035
About this file
This document is a Contractor Special Conditions file for the Naval Nuclear Power Training Unit (NPTU) Charleston, detailing critical requirements for contractors working at the facility. Key provisions include mandatory submission of a detailed Plan of Action at least ten days before work begins, daily check-ins with the Work Controls Officer (WCO) before starting and after completing work, and strict security protocols. The facility is located on Joint Base Charleston-Weapons Station and requires advance visit requests (5-10 business days prior), with significant restrictions on personal electronic devices and contraband materials.
Additional requirements cover medical emergency procedures, weather-related work suspensions (specifically for hurricanes), and comprehensive safety and operational guidelines. Contractors must remove all vehicles, tools, and equipment 72 hours before a projected hurricane landfall, with work resumption dependent on storm damage assessment. Contact information for site security, operations, and emergency services is provided, emphasizing the high-security nature of this Naval Reactors activity subject to Executive Order 12344.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL NUCLEAR POWER TRAINING UNIT (NPTU) CHARLESTON
CONTRACTOR SPECIAL CONDITIONS
Contractors are responsible for compliance with this document and should read it in its entirety
NPTU CHARLESTON 1 of 1 12 Aug 2020
1) Work Site. NPTU Charleston is located in Goose Creek, South Carolina on Joint Base Charleston-Weapons Station (JB CHS-WS). NPTU is a Naval Reactors activity and subject to the requirements of Executive Order 12344.
Site Work Controls Officer (WCO) Cell: (843) 509-6947 Site Operations Group PM Cell: (843) 324-6677
NPTU Security (843) 794-3095 794-3333 (On-site Emergency Only)
2) Required Submittals. No later than ten days prior to Work Start Date, Contractors must provide a Plan of Action document that contains a detailed procedure for the work about to be conducted including the following: Performance of procedural steps, Interruption or use of services, Use of energy isolations, Required NPTU support, Mitigation of safety hazards, and
Environmental Concerns. Further details of each required portion of this document are included below. NPTU must approve the Plan of Action prior to any work being performed onsite.
3) Work Induction and Completion. The contractor shall meet with the WCO prior to commencing work each day, to inform the WCO of contractor personnel on-site and the work planned for the day. Work may not begin until authorized by the WCO. At the end of each workday, the contractor shall contact the WCO to inform them of status and progress of the job.
4) Security. NPTU is a high security facility with its own security force and access requirements. In order to gain authorized access to NPTU, all contractor personnel must submit a visit request at least five business days prior to arriving at NPTU. If it is determined the contractor must work in a controlled section of NPTU, requests should be routed at least ten business days in advance to ensure approval before arrival.
5) Contraband Material. Personal Electronic Devices (PEDs) are prohibited inside of
NPTU’s security enclosure. The following items are restricted (i.e. will be confiscated or denied access) unless prior authorization is granted: cameras and film, cell phones, personal computers and laptops, radioactive materials, classified material, radio transmitters and receivers, personnel monitoring devices, and optical and magnetic media.
6) Medical Emergency Action. Should a serious accident occur, immediately notify NPTU
Security at 794-3333 or (843) 794-3095. Subsequently, notify contractor management and the WCO.
7) Weather Related Incidents. In the event of severe inclement weather (e.g. hurricane), work at NPTU will be suspended at least 72 hours prior to the storm’s projected landfall. The contractor is expected to have all vehicles, tools, and equipment removed from NPTU 72 hours prior to the storm’s projected landfall. Resumption of contractor work will be dependent on the severity of the storm’s damage. Contractors can contact the WCO for an expected time to return to site after the threat of severe weather has passed.
File details come from the government source that posted it. Updated .