Att12_250031 - Submittal Register_v4.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
TINKER AFB MAC BOA WWYK250031 - Repair B62528
Solicitation number
FA813725R0024
Issued by

About this file

This Submittal Register is a comprehensive document for the Tinker AFB MAC BOA WWYK250031 project to repair Building 62528, detailing 104 specific submittals required throughout the construction process. The project involves various demolition activities within Building 62528 at Tinker Air Force Base, with a project value between $1,000,000 and $5,000,000, and is restricted to Tinker AFB MAC BOA Holders.

The submittal register covers multiple preconstruction, product data, certificate, manufacturer's instruction, closeout, and operational documentation requirements across sections like quality control, design, safety, environmental management, and project closeout. Key submission types include an Entry Access List, Health and Safety Plan, Storm Water Pollution Prevention Plan, Construction Debris Analysis Plan, Baseline Construction Schedule, Quality Control Plan, Operation and Maintenance Manuals, As-Built Drawings, and various safety and compliance certifications. The project requires weekly progress reports, monthly schedule updates, and specific documentation like Safety Data Sheets, air sampling results, and waste disposal receipts. An initial site visit is mandatory on 24 Apr 2025 from 10:00-11:30 AM CT, with an RSVP deadline of 18 Apr 2025 at 12:00 PM.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Submittal Register_General Requ

TITLE:WWYK 250031 - Tinker AFB General Requirements Specification (Div 00-01)SUBMITTAL REGISTER
JOB NAME:REPAIR B62528
LOCATION:B62528
CONTRACT NO:
CONTRACTOR:
CONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONAPPROVING AUTHORITY
(a)(b)(c)(d)(e)(f)(g)(h)(i)(j)(k)(l)(m)(n)(o)(p)(q)(r)
LineActivity #Transmittal #Specification SectionSD #Submittal DescriptionItem SubmittedParagraph #Classification: GOVT or A/E ReviewerSubmitApproval Needed ByMaterial Needed ByAction CodeDate Of ActionDate FWD to APPR / Auth Date RCD From CONTRDate FWD To Other RevwrDate RCD From Other ReviewerAction CodeDate Of ActionMailed To CONTR/ Date RCD From APPR AuthorityRemarks
100 70 0001Preconstruction SubmittalsEntry Access List1.6G
200 70 0001Preconstruction SubmittalsKey Issue Receipt1.3.12.1
300 70 0006Test ReportsPre-Construction Testing Record1.3.11G
400 70 0007CertificatesWelding, Cutting and Brazing Permit1.4G
500 70 0007CertificatesFramed Instructions1.8
600 70 0011Closeout SubmittalsKey Return Receipt1.3.12.1
700 71 0001Preconstruction SubmittalsHealth and Safety Plan1.3G
800 71 0007CertificatesSafety Meetings1.3
900 71 0007CertificatesFOD Awareness and Prevention Training1.4
1000 72 0001Preconstruction SubmittalsRestoration Plan1.3.2G
1100 72 0001Preconstruction SubmittalsStorm Water Pollution Prevention Plan1.3.3.2G
1200 72 0001Preconstruction SubmittalsWater System Construction Permit1.3.3.6G
1300 72 0001Preconstruction SubmittalsAF Form 3952 Chemical/Hazardous Material Request/Authorization1.4G
1400 72 0001Preconstruction SubmittalsSpray Painting Plan1.9G
1500 72 0001Preconstruction SubmittalsEnvironmental Management System Awareness Training1.1
1600 72 0003Product DataAffirmative Procurement Documentation or Green Statement1.3.10GProvide only one. Reference specification for additional information
1700 72 0007CerificatesFire Ant Federal Compliance Agreement or state phyto-sanitary certificate1.3.4.1
1800 72 0007CerificatesMonthly Hazardous Material Usage Report1.4GProvide 1st week of each month during construction
1900 72 0008Manufacturer's InstructionsSafety Data Sheets/Material Safety Data Sheets1.4
2000 72 0011Closeout SubmittalsNotice of Termination
(ODEQ Form 640-572)1.3.3.2G
2100 72 00 - Attch 201Preconstruction SubmittalsDocumentation of Training/ ExperienceC.2

C.13 22 00 72 00 - Attch 2 01 Preconstruction Submittals Employee Physicals C.2 C.13

2300 72 00 - Attch 201Preconstruction SubmittalsRegulatory Agency NotificationC.3
2400 72 00 - Attch 201Preconstruction SubmittalsSecurity DocumentationC.4
2500 72 00 - Attch 201Preconstruction SubmittalsCommunicationsC.5
2600 72 00 - Attch 201Preconstruction SubmittalsStep-by-Step Abatement ProceduresC.6G
2700 72 00 - Attch 201Preconstruction SubmittalsGlovebag ProceduresC.7G
2800 72 00 - Attch 201Preconstruction SubmittalsNegative Pressure Enclosure Construction ProceduresC.8G
2900 72 00 - Attch 201Preconstruction SubmittalsRespirator Protection ProgramC.9
3000 72 00 - Attch 201Preconstruction SubmittalsEncapsulation ProceduresC.11G
3100 72 00 - Attch 201Preconstruction SubmittalsLandfill QualificationsC.14
3200 72 00 - Attch 201Preconstruction SubmittalsWork ScheduleC.16
3300 72 00 - Attch 201Preconstruction SubmittalsEmergency Plans and Fire Prevention PlansC.17G
3400 72 00 - Attch 201Preconstruction SubmittalsWritten Hazardous Communication ProgramC.18
3500 72 00 - Attch 201Preconstruction SubmittalsRental EquipmentC.19
3600 72 00 - Attch 207CerificatesManufacturer’s CertificationsC.10
3700 72 00 - Attch 207CerificatesLaboratory and Monitoring Qualifications/CertificationsC.12
3800 72 00 - Attch 207CerificatesAsbestos Waste Transporter Certification of InsuranceC.13
3900 72 00 - Attch 208Manufacturer's InstructionsSafety Data Sheets/Material Safety Data SheetsC.15
4000 72 00 - Attch 211Closeout SubmittalsWaste Disposal ReceiptM.1(1)G
4100 72 00 - Attch 211Closeout SubmittalsAir Sampling ResultsM.1(2)G
4200 72 00 - Attch 301Preconstruction SubmittalsDocumentation of Training/ ExperienceC.1
4300 72 00 - Attch 301Preconstruction SubmittalsEmployee PhysicalsC.2
4400 72 00 - Attch 301Preconstruction SubmittalsSecurity DocumentationC.3
4500 72 00 - Attch 301Preconstruction SubmittalsStep-by-Step Abatement Procedures PlanC.4G
4600 72 00 - Attch 301Preconstruction SubmittalsFull Containment Construction Procedures/DrawingsC.5G
4700 72 00 - Attch 301Preconstruction SubmittalsRespirator Protection ProgramC.6
4800 72 00 - Attch 301Preconstruction SubmittalsWork ScheduleC.11G
4900 72 00 - Attch 303Product DataMaterials ListC.10
5000 72 00 - Attch 307CerificatesManufacturer’s CertificationsC.7
5100 72 00 - Attch 307CerificatesLaboratory and Monitoring QualificationsC.8
5200 72 00 - Attch 307CerificatesLead Based Paint Waste Transporter’s QualificationsC.9
5300 72 00 - Attch 311Closeout SubmittalsWaste Disposal ReceiptM.1.1G
5400 72 00 - Attch 311Closeout SubmittalsAir Sampling ResultsM.1.2G
5500 72 00 - Attch 311Closeout SubmittalsVerification of Decontamination of Rental EquipmentM.1.3
5600 72 00 - Attch 3a01Preconstruction SubmittalsRemoval ProceduresB.1G
5700 72 00 - Attch 3a03Product DataList of MaterialB.2
5800 72 00 - Attch 3a08Manufacturer's InstructionsMaterial Data SheetsB.3
5900 72 00 - Attch 501Preconstruction SubmittalsConstruction Debris Analysis Plan1.2.3G
6000 72 00 - Attch 507CertificatesMonthly Debris Management Report2GProvide 1st week of each month during construction
6100 72 00 - Attch 1101Preconstruction SubmittalsTree Planting/Removal Permit1.1G
6200 72 00 - Attch 1101Preconstruction SubmittalsTree Protection Plan2.1G
6301 32 16.00 2001Preconstruction SubmittalsBaseline Construction Schedule1.2GProvide within 10 days of NTP.
6401 32 16.00 2001Preconstruction SubmittalsBaseline Design Schedule1.2GProvide within 10 days of NTP.
6501 32 16.00 2007CertificatesMonthly Updates1.4Provide 1st week of each month during construction, or as directed by CO
6601 32 16.00 2007Certificates3-Week Look Ahead Schedule1.6Provide weekly with the Contract Progress Report
6701 33 0001Preconstruction SubmittalsSubmittal Register1.8G
6801 33 16.00 1001Preconstruction SubmittalsDesign Quality Control Plan1.5.1G
6901 33 16.00 1001Preconstruction SubmittalsInitial Design Conference1.5.2.2
7001 33 16.00 1001Preconstruction SubmittalsPreconstruction Conference1.5.2.3
7101 33 16.00 1001Preconstruction SubmittalsDCM Procedures3.5.1G
7201 33 16.00 1001Preconstruction SubmittalsSubmittal Register3.8.4G
7301 33 16.00 1005Design DataDesign and Code Checklists1.7.1C
7401 33 16.00 1005Design DataInterim Design Submittals3.2.1R
7501 33 16.00 1005Design DataInterior And Exterior Building Finishes Scheme3.6.5.1.1G
7601 33 16.00 1005Design DataConference Documentation3.7.3
7701 33 16.00 1005Design DataFinal Design Submittals3.8R
7801 33 16.00 1005Design DataDesign Complete Documents3.9C
7901 33 16.00 1011Closeout SubmittalsDD Form 13543.8.5A
8001 45 00.00 1001Preconstruction SubmittalsQuality Control (QC) Plan3.2G
8101 45 00.00 1001Preconstruction SubmittalsAdditional Requirements for Design Quality Control (DQC) Plan3.2.2G
8201 45 00.00 1005Design DataDiscipline-Specific Checklists3.2.2
8301 45 00.00 1005Design DataDesign Quality Control3.9.1
8401 45 00.00 1006Test ReportsQC Documentation3.9Provide weekly with the Contract Progress Report
8501 50 0001Preconstruction SubmittalsRequest for Contractor Staging Area1.1G
8601 50 0001Preconstruction SubmittalsPhotographic Record1.3
8701 78 0003Product DataWarranty Letter1.7.1
8801 78 0003Product DataWarranty Tags1.7.3
8901 78 0003Product DataSpare Parts Data1.5
9001 78 0008Manufacturer's InstructionsInstructions1.7.1
9101 78 0010Operation and Maintenance DataOperation and Maintenance Manuals3.4GProvide (2) electronic sets (optical media) and (1) hard copy
9201 78 0011Closeout SubmittalsWorking As-Built Drawings3.1GProvide (2) electronic sets (optical media) and (2) hard copies
9301 78 0011Closeout SubmittalsRecord Drawings3.3GProvide (2) electronic sets (optical media) and (1) hard copy
9401 78 0011Closeout SubmittalsCertification of EPA Designated Items2.3G
9501 78 0011Closeout SubmittalsDD FORM 13543.6G
9601 78 0011Closeout SubmittalsChecklist for DD FORM 13543.6G
9701 78 2310Operation and Maintenance DataOperation and Maintenance Data1.2GProvide 30 days prior to scheduled Training
9801 78 2310Operation and Maintenance DataO&M Database1.3G
9901 78 2310Operation and Maintenance DataTraining Plan3.1.1GProvide 30 days prior to scheduled Final Inspection
10001 78 2310Operation and Maintenance DataTraining Content3.1.2GProvide 14 days prior to scheduled Training
10101 78 2310Operation and Maintenance DataTraining Outline3.1.3GProvide 14 days prior to scheduled Training
10201 78 2311Closeout SubmittalsTraining Video Recording3.1.4G
10301 78 2311Closeout SubmittalsValidation of Training Completion3.1.6G
104SOW07CertificatesContract Progress Report(s)2.4GProvide weekly throughout life of contract. Utilize AF Form 3065, Contract Progress Report (or equal)