This file is an Intermediate Facility Clearance (IFC) plans document for a federal construction project at Tinker Air Force Base, Oklahoma. The project, designated WWYK200270, involves the complete renovation of Building 7037 and construction of a new 2,500 square-foot addition to convert the space into a Drug Testing Office facility. The existing building contains approximately 4,644 square feet at finish floor elevation 1227.57 feet. The project is classified as Type IIB construction under the International Building Code, with a single story, 14-foot height limitation, and actual total building area of 4,600 square feet. Design criteria include a 109 mph ultimate wind speed, seismic design category B, 18 PSF ground snow load, and drilled piers designed for end bearing in bedrock with minimum 6-foot penetration and 20 KSF allowable end pressure. The document includes comprehensive plans covering general notes and vicinity maps, sheet indices showing approximately 70+ drawing sheets across civil, structural, architectural, fire protection, plumbing, mechanical, electrical, and telecommunications disciplines, and detailed code analysis demonstrating compliance with UFC 1-200-01, International Building Code 2024, International Existing Building Code 2024, and NFPA standards.
The IFC plans contain extensive civil details including site demolition and utility plans showing removal of 6,650 square feet of existing asphalt pavement, existing concrete sidewalk demolition, and relocation of utilities including proposed sanitary sewer connections to existing Lift Station #7038. Life safety provisions include occupancy classification as mixed-use (Group A-3 Assembly and Group B Business), with maximum occupant load of approximately 118 persons, egress travel distances of 24-98 feet (within 200-foot maximum), and accessible exits with emergency lighting and manual release devices. Fire protection design indicates no automatic sprinkler requirement for single-story Type II construction under 15,000 square feet, with existing fire hydrant coverage verified at 235 feet from Building 7037. The project includes comprehensive erosion and sedimentation control measures, site details for parking and striping, curb ramp specifications, and bollard installation. Construction entrance and washout pit details are provided, with specific requirements for silt fence installation, graded material disposal, and site stabilization maintaining compliance with environmental quality standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit.pdf | ||
| Att11_200270_Submittal Register_v4.pdf | ||
| Att10_200270_SOW.pdf | ||
| Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R U
N W
A Y
8/
RUNW
AY 13/31
TA
X
IW
A
Y G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
T A X
IW
A
Y K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIW
AY J
TA
X
IW
A
Y G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIW
AY EE
TAXIWAY F
E lm
C re ek
C rutc ho C r eek
Kuhlman Creek
Soldier Creek
Kuhlman Creek
E lm
C reek
East Crutcho Creek
Elm Creek
E lm
C re ek
Elm Creek
E lm
C reek
Elm Creek
E lm
C reek
Ku hl m an
C re ek
E as t C ru tc ho
C re ek
Elm C re ek
West Crutcho Creek W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
E lm
C ree k
Soldier Creek
S oldie r C reek
E as t C ru tc ho C re ek
Elm Creek
E a s t C ru tc ho
C re e k
E as t C ru tch o C r eek
Soldier Creek
S ol di er
C re ek
Eas t C rutcho C ree k
S oldi er C r eek
Soldier C reek
S ol di er
C re ek
East Crutcho Creek
560 4
E as t D r.
SE 59th St.
S ta ff D r.
5th Ave
W ar eh ou se R d.
7th St.
M cN ar ne y A ve
Mitchell Ave
C oo k A ve
W es t D r.
Extender Dr.
5th Ave.
Globemaster Dr.
A ir
D ep ot
Mercury Rd.
P on d R d.
"C " A ve
H ill to p
R d.
"M " A ve
Doolittle Ave
W hi te D r.
B al l P ar k R d .
6th St.
P ow er ho u se
D r.
In tr ud er
D r.
Holden Dr.
Vanaman Rd.
1st St.
Arnold St.
SE 74th St
A ir
D ep ot
Patrol Rd.
Reserve Rd.
"A " A ve
M un iti on s R d.
"B " A ve
"H " A ve
A le rt R d.
"E "A ve
Sentry Rd.
34th St.
Twining Dr.
Jo ne s
T ow er R d
Vanaman Rd.
In du st ria l B lv d.
S ou th S t.
1st St.
D oo lit tle
A ve
P ic ni c
R d.
J a m es D r .
W ol fe D r.
A ir
D ep ot
"D " A ve
Perimeter Rd.
R apcon R d.
Reserve Rd
"L " A ve
"F
A ve
1st St.
B r o w n
D r.
O ld
A ir
D ep ot
Airey Dr.
General Motors Dr
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
Vandenberg Dr.
D or m ito ry R d.
Dormitory Rd.
Chennault Dr.
M itc he ll
A ve
Spaatz Dr.
E ng in e
T e st D r.
3rd Ave.
"D " D riv e
Joint STARS Dr.
A ir
D ep ot B lv d
Turbine Dr.
Turbine Dr.
Central Plant Dr.
6th St.
Falco n D r.
Blac kb ird D r.
W ey l a nd
L oo p
Pegasus Dr.
Thun derbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Chidlaw Ct.
C or sa ir
D r.
Rap to r C t.
N ig ht H aw k
C t.
P ha nt om
D r.
F ra nk lin
S ky m as te r
D r.
Spaatz Ct.
La w r e nc e
M un de ll
Nabors Dr.
M cN ic kl e
M i ll er D r .
T ai l F ea th er
D r.
Ai re y C ir.
Smith Ct.
Raven Ct.
Ai r D ep ot
A i r
D ep ot
1st St.
TAXIWAY F
R a w l i n g s
A v e
M i t c h e l l
A v e
Mercury Rd.
R ai ly ar d R d.
H er cu le s R d.
2 3 0
4 1 65 0 6
3 7 0 5
6 8 5
2 6 0
1 1
6 9 0
2 0 0
2 4 0
3 1 0 2
3 2 2 1
8 3 0
3 1 0 5
570 2
570 3
11401128
9 8 6
59035909
2 4 4
8 6 0
1 0 2 2
9 8 5
99 5
1 0 9 5
9 3 0 7
5 9 1 3
1 0 5 0
4 0 1 9
3 2 2 4
1 1 0 2
2 1 1 0
10 2 4
4 0 3 1
838837
6 2 5 0 9
4 0 2 3
4 0 4 8
3 5 0 7
4 0 5 8
1 0 8 8
9 3 0 5
5 7 0 4
57 3 0
1 0 2 5
1 0 8 6
2 1 3
82 9
8 1 1
6 6 0 4
1 0 9 7
10 2 7
9 6 4
6 2 5 1 2
81 9
6 2 5 2 5
4 0 3
11 2 4
1 0 2 9
1 0 4 6
10 5 4
9 9 9 9 9
6 2 5 4 3
10 8 4
1 0 6 2
6 0 2 6
71086
53902
50414
55300
56601
4 0 4 5
61019
62501
3 1 2 0
45134
1 1 3 3
1 0 9 9
1 0 7 7
1 0 2 3
4 0 3 2
9 3 0 6
4 0 6 8
6 2 5 0 3
612 89
6 2 5 4 2
9 8 7
15904
15908
15904
15908
6 2 5 0 2
4 1 0 4 6
6 2 5 0 1
6 2 5 1 4
6 2 5 0 1
4 0 0 0
41157
45815
405 92
62522
15930
11 82 4
8 4 3 0
8 4 3 5
1 0
1 8
5 1 0
4 1 2
4 6 9
3 2 2 0
2 1 4
1 6
930 1
4 1 3
4 7 2
4 2 0
5 9 3 1
5 9 3 0
9 2 6
2 2 1 2
593 5
6 2 5 4 0
1 1 5 6
6 6 1 2
4 7 3
4 0 4 9
5 9 1 4
6 1 0 8 9
9 3 0 9
4 0 7 9
6 6 1 1
1 0 1 7
6 2 5 2 8
6 2 5 2 3
6 2 5 0 1 X
1 0 4 9
1 0 8 9
4 0 0 1
1 1 3 1
437 74
59 2
1 0 5 1
9 1 6
3 3 0 5
6 2 5 1 6
2 4 1
4 0 0 2
3 2 0 2
3592135916
9 8 8
6 6 0 3
32101
930G
948-E
911-E
948-W
911-W
33001
35913
65672
930S
43609
42116
5 9 2 4
6 2 5 1 7
1 0 3 6
4 0 2 8
9 6 3
81 7
1 0 2 5
6 2 5 1 5
1 0 3 5
6 2 5 2 6
5 8 1 5
625 27
6 2 5 1 3
6 2 5 0 1 O K
112 89
1 0 3 4
6 2 5 0 1
15930
15908
15904
15908
15904
6 1 0 1 8
71089
45134
96022
4 3 1 2 0
4 4 0 4 5
43610
411 63
15930
1 0 7 8
8 4 3 6
4 6 1
9 3 2
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
D R
U G
T E
S T
O F
F
IC
E
N O
V A
T
IO
N
B
A
P R
IL
H D
R
J W
G-001
K H
C G
G E
N E
R A
L
N O
T E
S A
N D
V
IC
IN
IT
Y M
A P
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT: (CEFT)
1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCUMENTS SHALL
BE UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL
NEW LABOR & MATERIALS UNLESS SPECIFICALLY NOTED
TO BE "EXISTING" OR "BY OTHERS".
GENERAL NOTES:
WWYK200270
DRUG TEST OFFICE
RENOVATION,
BLDG 7037
TINKER AFB, OK
VICINITY MAP
LEGEND
CONTRACTOR
HAUL ROUTE
PROJECT LOCATION
BASE CIVIL
ENGINEER
B400
EAKER
GATE
TINKER GATE
PASS & ID
B6611
VANCE GATE
GOTT GATE
TRUCK GATE
PROJECT
LOCATION
PIAZZA GATE
HOPE GATE
LIBERATOR GATE
LANCER GATE
HRUSKOCY GATE
BASE OPERATIONS B240
FIRE DEPARTMENT B117
CONTRACTING B3
:2 A
P R
IL
OK LF AO HE OT MAT AS DARIUS
SHROFF
A6884
04/24/2026
A7250
ROBERT
ANDREW
MATJASKO
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
D R
U G
T E
S T
O F
F
N O
V A
T
IO
N
B
A P
R
IL
H D
R
J W
K H C
G
G-002
S H
E E
T I N
D E
X
SHEET LIST
SHEET NUMBER SHEET NAME 3
GENERAL
G-001 COVER SHEET X X X X
G-002 SHEET INDEX X X X X
G-003 GENERAL NOTES, ABBREVIATIONS X X X X
G-100 CODE ANALYSIS X X X X
G-101 CODE ANALYSIS X X X X
G-102 LIFE SAFETY PLAN X X X X
G-103 CODE COMPLIANCE SITE PLAN X X
CIVIL
C-001 GENERAL NOTES AND LEGEND X X X
C-101 EXISTING CONDITIONS AND DEMOLITION PLAN X X X X
C-102 SITE PLAN X X X X
C-103 UTILITY PLAN X X X X
C-104 GRADING AND EROSION CONTROL PLAN X X X
C-501 SITE DETAILS X X X
C-502 SITE DETAILS X X X
C-503 EROSION CONTROL DETAILS X X X
STRUCTURAL
S-001 GENERAL NOTES AND STANDARD DETAILS X X X X
S-002 STRUCTURAL SPECIAL INSPECTIONS X X X X
S-003 STRUCTURAL TYPICAL CONCRETE DETAILS 1 X X X X
S-004 STRUCTURAL TYPICAL CONCRETE DETAILS 2 X X X X
S-005 STRUCTURAL CONCRETE DRILLED PIER AND PEDESTAL SCHEDULES AND DETAILS X X X X
SB100 SOIL BORING PLAN AND LOG X X
SD101 STRUCTURAL FIRST FLOOR DEMOLITION PLAN X
S-101 FLOOR FRAMING PLAN X X X X
S-102 ROOF FRAMING PLAN X X X
S-103 ROOF LOADING DIAGRAM X X X
S-201 FRAMING ELEVATIONS X X X
S-301 FOUNDATION SECTIONS x X X
S-302 FOUNDATION SECTIONS X X X
S-501 STRUCTURAL DETAILS X X X
ARCHITECTURAL
AD101 DEMOLITION - FLOOR PLAN X X X X
AD102 DEMOLITION - ROOF PLAN X X X X
A-101 FLOOR PLAN X X X X
A-102 ROOF PLAN X X X X
A-103 REFLECTED CEILING PLAN X X X X
A-104 FINISH PLAN X X X
A-201 ELEVATIONS X X X X
A-301 BUILDING SECTION X X X
A-302 PARTIAL BUILDING SECTION X X X
A-310 WALL SECTIONS X X X
A-430 INTERIOR ELEVATIONS X X X
A-431 INTERIOR ELEVATIONS X X X
A-501 ARCHITECTURAL DETAILS X X X
A-502 ARCHITECTURAL DETAILS X X X
A-503 CASEWORK DETAILS X X X
A-504 ABA DETAILS X X X
A-601 PARTITION TYPES X X X
A-603 DOOR & WINDOW SCHEDULES X X X
A-604 DOOR & WINDOW DETAILS X X X
FIRE PROTECTION
F-001 FIRE PROTECTION GENERAL NOTES X X X X
FA101 FIRE ALARM AND MASS NOTIFICATION PLAN - NEW WORK X X X X
FA102 ACOUSTICALLY DISTINGUISHABLE SPACE X X X
FA501 FIRE ALARM DETAILS X X X X
FA601 FIREALARM MATRIX AND DIAGRAM X X X X
FD101 FIRE ALARM AND MASS NOTIFICATION PLAN - DEMOLITION X X X X
SHEET LIST
SHEET NUMBER SHEET NAME 3
PLUMBING
P-001 PLUMBING LEGENDS, SYMBOLS, AND ABBREVIATIONS X X X X
PD100 PLUMBING UNDERFLOOR DEMO PLAN X X X X
PD101 PLUMBING DEMO FLOOR PLAN X X X X
P-100 PLUMBING UNDERFLOOR PLAN X X X X
P-101 PLUMBING FLOOR PLAN X X X X
P-102 PLUMBING ROOF PLAN X X X X
P-501 PLUMBING DETAILS X X X X
P-502 PLUMBING ISOMETRIC - WATER X X
P-503 PLUMBING ISOMETRIC - SANITARY X X X X
P-601 PLUMBING SCHEDULES X X X X
P-602 PLUMBING SCHEDULES X X X X
MECHANICAL
M-001 MECHANICAL LEGENDS, SYMBOLS, AND ABBREVIATIONS X X X X
MD101 MECHANICAL DEMO PLAN X X X X
M-101 MECHANICAL FLOOR PLAN X X X X
M-301 MECHANICAL SECTIONS X X
M-501 MECHANICAL DETAILS X X X X
M-502 MECHANICAL DETAILS X X X X
M-503 MECHANICAL DETAILS X X X X
M-601 MECHANICAL SCHEDULES X X X X
M-602 MECHANICAL SCHEDULES X X X X
M-603 MECHANICAL SCHEDULES X X X X
M-701 MECHANICAL CONTROLS X X
M-702 MECHANICAL CONTROLS X X
M-703 MECHANICAL CONTROLS X X
M-704 MECHANICAL CONTROLS X
ELECTRICAL
E-001 ELECTRICAL SYMBOLS, LEGEND, & ABBREVIATIONS X X X X
ED101 ELECTRICAL SITE DEMOLITION PLAN X X X X
ED102 ELECTRICAL DEMOLITION PLANS X X X
ES101 ELECTRICAL SITE PLAN X X X X
E-101 ELECTRICAL POWER PLAN X X X
E-102 ELECTRICAL LIGHTING PLAN X X X X
E-103 LIGHTING PHOTOMETRIC PLAN X X X
E-104 EMERGENCY LIGHTING PHOTOMETRIC PLAN X X
E-501 ELECTRICAL DETAILS X X X
E-601 ELECTRICAL SCHEDULES X X X X
E-602 ELECTRICAL ONE-LINE AND PANEL SCHEDULES X X X X
TELECOMMUNICATIONS
T-001 TELECOM AND SECURITY LEGEND X X X
T-101 TELECOM FLOOR PLAN X X X
T-401 ENLARGED TELECOM ROOM X X X
T-501 TELECOM DETAILS X X X
TY101 SECURITY FLOOR PLAN X X X
TY501 SECURITY DETAILS X X X
:2 A
P R
IL
OK LF AO HE OT MAT AS DARIUS
SHROFF
A6884
04/24/2026
A7250
ROBERT
DRAWING ABBREVIATIONS
INDEX OF DRAWINGS
NUMBERING SYSTEM:
XX100
DISCIPLINE:
C - CIVIL
L - LANDSCAPE
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
K - FOOD SERVICE
DISCIPLINE MODIFIER
ANNOTATION CALLOUTS/DRAWING SYMBOLS
GENERAL NOTES
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HTCEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORDCOORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GREXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRKFACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLRFINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT INSTALLED
GOVERNMENT INSTALLED
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTI
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND
RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
REFER TO A/E/C CAD STANDARD FOR
SHEET NUMBERINGSTANDARDS
REVISION
TAG
ROOM TAG
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
LEVEL NAME
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
SHEET KEYNOTE
INTERIOR ELEVATION
SHEET NUMBER
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL
(FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
SHEET NUMBER WITHIN SERIES
A201
A204
A301
A401
ROOM
100'
LEVEL 01
100'
1 IT IS THE SUBCONTRACTOR'S RESPONSIBILITY TO VERIFY ALL
EXISTING CONDITIONS AND QUANTITIES FOR THEIR RESPECTIVE
TRADES PRIOR TO SUBMITTING PRICING TO THE GENERAL
CONTRACTOR. THIS INCLUDES BUT IS NOT LIMITED TO THE
FOLLOWING EXISTING CONDITIONS AND/OR MATERIALS THAT
MUST BE REMOVED AND/OR SURFACES PREPARED FOR NEW
MATERIALS/WORK: DRYWALL PARTITIONS AND WALLS, MASONRY
WALLS, CEMENTITIOUS WALLS, CERAMIC FLOORS AND WALLS
AND/OR FINISHES AND MECHANICAL/ELECTRICAL EQUIPMENT AND
DEVICES.
DETAILS ARE USUALLY KEYED ONLY ONCE (ON THE PLANS OR
ELEVATIONS WHEN THEY FIRST OCCUR) AND ARE TYPICAL FOR
SIMILAR CONDITIONS THROUGHOUT UNLESS OTHERWISE NOTED.
5.
ALL PIPE CONDUIT AND DUCT PENETRATIONS THROUGH FLOORS
AND FIRE-RATED WALLS AND CEILINGS SHALL BE SEALED WITH A
UL LISTED ASSEMBLY SUCH THAT FIRE RATINGS ARE MAINTAINED.
THERE WILL BE ADJACENT AREAS OF THE BUILDING THAT MUST
REMAIN OPERATIONAL DURING THE COURSE OF THIS PROJECT.
ACCESS TO CEILING AREAS AND SHUT DOWNS OF SERVICES ARE
REQUIRED TO BE COORDINATED WITH THE OWNERS
REPRESENTATIVE.
15.
14.
CONTRACTOR SHALL PROTECT, PATCH AND REFINISH TO MATCH
EXISTING AREAS TO REMAIN AND AREAS DISTURBED BY NEW
CONSTRUCTION, U.O.N.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING
AND PATCHING REQUIRED FOR PROPER INSTALLATION OF
MATERIAL AND EQUIPMENT. PROVIDE DEMOLITION AND
PATCH/REPAIR IN ALL AREAS (WHETHER SPECIFICALLY SHOWN
OR NOT) TO ACCOMMODATE ALL WORK INCLUDING MECHANICAL,
ELECTRICAL, PLUMBING, FIRE PROTECTION.
13.
12.
11.
"AS REQUIRED" MEANS AS REQUIRED BY REGULATORY
REQUIREMENTS, BY REFERENCED STANDARDS, BY EXISTING
CONDITIONS, BY GENERALLY ACCEPTED CONSTRUCTION
PRACTICE OR BY THE CONTRACT DOCUMENTS.
7.
CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING,
BACKING, FRAMING HANGERS OR OTHER SUPPORTS FOR ALL
FIXTURES, EQUIPMENT, CABINETRY, FURNISHINGS AND ALL
OTHER ITEMS REQUIRING SAME.
DIMENSIONS ARE TO FACE OF FINISHED WALL UNLESS
OTHERWISE NOTED.
ALL DIMENSIONS GIVEN AS CLEAR ARE NOT ADJUSTABLE
WITHOUT ARCHITECT/ENGINEER'S APPROVAL.
10.
9.
8.
"TYPICAL" OR "TYP." MEANS THAT THE CONDITION IS
REPRESENTATIVE FOR ALL SIMILAR CONDITIONS, UNLESS
OTHERWISE NOTED. "SIMILAR" OR "SIM." MEANS COMPARABLE
CHARACTERISTICS FOR THE CONDITIONS NOTED. VERIFY
DIMENSIONS AND ORIENTATION ON PLANS AND ELEVATIONS.
"ALIGN" AS USED IN THESE DOCUMENTS MEANS TO ACCURATELY
LOCATE FINISHES IN THE SAME PLANE.
6.
LARGE SCALE DRAWINGS TAKE PRECEDENCE OVER SMALL SCALE,
DETAILS TAKE PRECEDENCE OVER ALL. CONTRACTOR SHALL
NOTIFY ARCHITECT OF CONFLICTS IN WRITING, PRIOR TO
PROCEEDING WITH THE WORK IN QUESTION.
THE CONTRACTOR SHALL CHECK ALL CONTRACT DOCUMENTS,
FIELD CONDITIONS, AND DIMENSIONS FOR ACCURACY AS SHOWN
BEFORE PROCEEDING WITH THE CONSTRUCTION. IF THERE ARE
ANY QUESTIONS, THE CONTRACTOR SHALL OBTAIN A
CLARIFICATION FROM THE ARCHITECT BEFORE PROCEEDING WITH
THE WORK IN QUESTION OR RELATED WORK.
DRAWINGS SHALL NOT BE SCALED. WRITTEN DIMENSIONS SHALL
ALWAYS GOVERN. CONTRACTOR REQUIRING DIMENSIONS NOT
NOTED, SHALL CONTACT THE ARCHITECT FOR SUCH
INFORMATION PRIOR TO PROCEEDING WITH WORK RELATED TO
THOSE DIMENSIONS.
4.
3.
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH APPLICABLE
UNIFIED FACILITY CRITERIA, INTERNATIONAL (IBC) BUILDING CODE
REQUIREMENTS, & TINKER AIR FORCE BASE STANDARDS.
2.
1.
ARCHITECTURAL SYMBOLS
1'-0"
XXXXXXXX
X
X
A101
EXISTING COLUMN GRID DESIGNATOR
KEYNOTE
TITLE
SHEET NUMBER DETAIL IS DRAWN ON
DETAIL NUMBER
SCALE:
XX
X-XXX
X
FINISH FLOOR ELEVATION
EL. = 100 - '0"
XX
X-XXX
ARCHITECTURAL LEGEND
SUFFIX FOR MULTIPLE DOORS)
(MATCHES ROOM NUMBER, WITH LETTER
(PLAN, SECTION, DETAIL OR ELEVATION)
DOOR NUMBER
GRID LINE
DIMENSION LINE
ARCHITECTURAL ELEVATIONS EXTERIOR
ARCHITECTURAL DETAIL
REVISION DELTA
PARTITION TYPE REF A-601
EXISTING TO BE REMOVED
NEW CONSTRUCTION
EXISTING TO REMAIN
EXISTING TO REMAIN
ARCHITECTURAL ELEVATIONS INTERIOR
XX
X-XXX
XX
X-XXX
XX
X-XXX
CORRIDOR
3 ROOM NUMBER
ROOM NAME
NORTH ARROW
X
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
D R
U G
T E
S T
O F
F
N O
V A
T
IO
N
B
A P
R
IL
H D
R
J W
K H C
G
G-003
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
:2 A
P R
IL
OK LF AO HE OT MAT AS DARIUS
SHROFF
A6884
04/24/2026
A7250
ROBERT
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
D R
U G
T E
S T
O F
F
N O
V A
T
IO
N
B
A
P R
IL
H D
R
D E
D C
S
J M
G-100
C O
D E
A N
A L Y
S
IS
NOTE 1: FIRE RATING MAYBE INCREASED DUE TO OTHER CRITERIA SUCH AS FIRE AREA SEPARATION.
• ROOF CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS): 0 HOUR
• FLOOR CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS): 0 HOUR
• NON-BEARING WALLS & PARTITIONS - INTERIOR: 0 HOUR (NOTE 1)
• NON-BEARING WALLS - EXTERIOR SEPARATION DISTANCE >30 FT: 0 HOUR
• BEARING WALLS - INTERIOR: 0 HOUR
• BEARING WALLS - EXTERIOR SEPARATION DISTANCE >30 FT: 0 HOUR
• STRUCTURAL FRAME (INCLUDING COLUMNS, GIRDERS, AND TRUSSES): 0 HOUR
IBC 601 & TABLE 601 ALL ALLOWABLE COMBUSTIBLE MATERIALS AS
DEFINED IN SECTION 603
REQUIRED STRUCTURAL ELEMENTS:
• TYPE IIB CONSTRUCTION (IBC) - II(000) PER NFPA 220 IBC § 602 & TABLE 601
IBC CHAPTER 6 AND UFC 3-600-01 APPLY. UFC 1-200-01 § 2-6
TYPES OF CONSTRUCTION:
• ACTUAL BUILDING HEIGHT AND STORIES: 14FT AND ONE (1) STORY IBC § 504 BUILDING HEIGHT
WITHOUT AUTOMATIC SPRINKLER)
• ALLOWABLE HEIGHT: 55 FT AND 2 STORIES (GROUP A-3 IBC § 504.1 TABLE 504.3/504.4
• ACTUAL TOTAL BUILDING AREA: 4,600 SFT IBC § 506 BUILDING AREA
WITHOUT AUTOMATIC SPRINKLERS.)
• ALLOWABLE TABULATED FLOOR AREA: 9,500 SF (SINGLE STORY, MIXED USE; GROUP A-3 IBC Table 506.2.2
• TYPE IIB CONSTRUCTION (IBC) - II(000) PER NFPA 220 IBC § 602 & TABLE 601
IBC CHAPTER 5 AND UFC 3-600-01 APPLY. UFC 1-200-01 § 2-5
GENERAL BUILDING HEIGHTS AND AREAS:
• THERE ARE NO SPECIAL DETAILED REQUIREMENTS BASED ON USE
USE UFC 3-600-01 CHAPTER 4 IN LIEU OF IBC CHAPTER 4. UFC 1-200-01 § 2-4
SPECIAL DETAILED REQUIREMENTS BASED ON USE:
NEW ASSEMBLY OCCUPANCIES NFPA 101 CHAPTER 12
NEW BUSINESS OCCUPANCIES NFPA 101 CHAPTER 38
• NFPA OCCUPANCY CLASSIFICATIONS - MIXED USE AND OCCUPANCY - NON-SEPARATED OCCUPANCY: NFPA 101 § 6.1.14.3
FINISH, FIRE PROTECTION FEATURES AND MEANS OF EGRESS.
RATING OF INTERIOR LOAD-BEARING PARTITIONS (OTHER THAN OCCUPANCY SEPARATION), INTERIOR
NFPA 101 APPLIES TO OCCUPANCY CLASSIFICATION AS IT RELATES TO FIRE/SMOKE RESISTANCE UFC 3-600-01 § 3-3.1.2
GROUP A-3 ASSEMBLY IBC § 303 (ASSEMBLY)
GROUP B BUSINESS IBC § 304 (BUSINESS)
• IBC OCCUPANCY CLASSIFICATIONS - MIXED USE AND OCCUPANCY - NON-SEPARATED OCCUPANCY: IBC § 508.3
AREA, BUILDING SEPARATION AND OCCUPANCY SEPARATION.
IBC APPLIES TO OCCUPANCY CLASSIFICATION AS IT RELATES TO BUILDING HEIGHT, BUILDING UFC 3-600-01 § 3-2.1.2
IBC CHAPTER 3 AND UFC 3-600-01 APPLY. UFC 1-200-01 § 2-3
BUILDING USE AND OCCUPANCY CLASSIFICATION:
BUILDINGS FOR THE OCCUPANCY.
APPLICABLE TO NEW CONSTRUCTION FOR THE OCCUPANCY AND 2) THE EXISTING PORTION OF THE BUILDING SHALL COMPLY WITH THE REQUIREMENTS OF NFPA 101 APPLICABLE TO EXISTING
WHERE AN ADDITION, AS DEFINED BY NFPA 101, IS MADE TO A BUILIDNG, BOTH OF THE FOLLOWING CITERIA SHALL BE MET: 1) THE ADDITION SHALL COMPLY WITH OTHER SECTIONS OF NFPA 101
GENERAL REQUIREMENTS:
ADDITION; AN INCREASE IN THE BULDING AREA, AGGREGATE FLOOR AREA, BUILDING HEIGHT, OR NUMBER OF STORIES OF A STRUCTURE.
NFPA 101 - ADDITION: NFPA 101 § 43.2.2.1.7
LEVEL 3 ALTERATIONS APPLY WHERE THE WORK AREA EXCEEDS 50 PERCENT OF THE BUILDING AREA.
IEBC - ALTERATION LEVEL 3: IEBC § 604.1
PROJECT DESCRIPTION (IEBC AND NFPA 101):
THIS PROJECT CONSISTS OF THE COMPLETE RENOVATION OF THE EXISTING B7037 AND A NEW 2,500 SFT ADDITION AT TINKER AIR FORCE BASE, OKLAHOMA.
PROJECT DESCRIPTION:
TAFB FP FIRE PROTECTION STANDARDS (2026)
INTERNATIONAL CODE COUNCIL, INTERNATIONAL EXISTING BUILDING CODE (IEBC), 2024 EDITION
INTERNATIONAL CODE COUNCIL, INTERNATIONAL BUILDING CODE (IBC), 2024 EDITION. (AS AMENDED BY UFC 1-200-01).
OTHER REFERENCES
NFPA 291, RECOMMENDED PRACTICE FOR WATER FLOW TESTING AND MARKING OF HYDRANTS, 2025 EDITION.
NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, 2022 EDITION.
NFPA 170, STANDARD FOR FIRE SAFETY AND EMERGENCY SYMBOLS, 2024 EDITION.
NFPA 101, LIFE SAFETY CODE, 2024 EDITION.
NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING SYSTEMS, 2024 EDITION.
NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2025 EDITION.
NFPA 70, NATIONAL ELECTRIC CODE, 2023 EDITION.
NFPA 51B, STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING, AND OTHER HOT WORK, 2024 EDITION.
NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2026 EDITION.
NFPA 1, FIRE CODE, 2024 EDITION.
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) - LATEST EDITIONS
UFC 4-021-01, DESIGN AND O&M: MASS NOTIFICATION SYSTEMS (09 APRIL 2008 WITH CHANGE 1, 01 JAN 2010)
UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS (12 DEC 2018 WITH CHANGE 3, 24 MAY 2024)
UFC 3-601-02, FIRE PROTECTION SYSTEMS INSPECTION, TESTING, AND MAINTENANCE (07 OCT 2021 WITH CHANGE 1, 04 APRIL 2025)
UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES (8 AUGUST 2016 WITH CHANGE 6, 06 MAY 2021)
UFC 1-300-02, UNIFIED FACILITIES GUIDE SPECIFICATIONS (UFGS) FORMAT STANDARD (9 SEPTEMBER 2025)
UFC 1-200-01, DOD BUILDING CODE (1 SEPTEMBER 2022 WITH CHANGE 4, 17 DECEMEBER 2024)
UNIFIED FACILITIES CRITERIA (UFC)
REFERENCED CODES AND STANDARDS:
CODE ANALYSIS
ALARM AND MNS EQUIPMENT.
• SURGE PROTECTION DEVICE WILL BE PROVIDED FOR ALL 120 VAC POWERED FIRE UFC 3-600-01 § 9-18.11.2
• BREAKER LOCK WILL BE PROVIDED FOR FIRE ALARM AND MNS IAW UFC 3-520-01. UFC 3-600-01 § 9-18.11.1
• THE FIRE ALARM EVACUATION SIGNAL WILL BROADCAST OVER THE MNS SYSTEM. UFC 3-600-01 § 9-18.1.2.1
• VOICE INTELLIGIBILITY TO BE PROVIDED THROUGHOUT (CIS >0.8 OR STI > 0.70). UFC 4-021-01 § 4-6.1.2
THAN 200 FT OR TRAVEL TO OTHER FLOORS TO ACCESS LOC.
• LOCAL OPERATOR CONSOLE (LOC) INSTALLED SO OCCUPANTS DO NOT NEED TO TRAVEL MORE UFC 4-021-01 § 4-5.1
• MANUAL PULL STATION AT ALL EXIT DOORS. UFC 3-600-01 § 9-18.7.4
• MONACO MAAP-X FIRE ALARM/MASS NOTIFICATION CONTROL PANEL REPORTING TO BASE-WIDE MONACO D-21 MONITORING STATION. CAANG IDG
• ANALOG / ADDRESSABLE FIRE ALARM SYSTEM WILL BE PROVIDED. UFC 3-600-01 § 9-18.4
• MASS NOTIFICIATION SYSTEM TO BE INSTALLED IN ACCORDANCE WITH UFC 4-021-01. UFC 3-600-01 § 9-18.4
• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WITH UFC-3-600-01, NFPA 70, NFPA 72, ABA AND TINKER FIRE PROTECTION STANDARD. UFC 3-600-01 § 9-18.3.1
• BUILDING TO BE INHABITED (ROUTINELY OCCUPIED BY 11 OR MORE OCCUPANTS). UFC 4-010-01 § 1-8
• A MASS NOTIFICATION SYSTEM IS REQUIRED THROUGHOUT. UFC 4-010-01 § 3-22
BE PROVIDED TO FACILITE THE REQUIRED MASS NOTIFICATION SYSTEM AND EMERGENCY REPORTING TO THE BASE FIRE DEPARTMENT.
ABOVE OR BELOW THE LEVEL OF EXIT DISCHARGE, AND IS NOT SUBJECT TO 500 OR MORE TOTAL OCCUPANTS. HOWEVER, A FIRE ALARM SYSTEM WILL NFPA 101 § 12.3.4.1.1
• A FIRE ALARM SYSTEM IS NOT REQUIRED AS THE BUILDING IS NOT THREE OR MORE STORIES IN HEIGHT, IS NOT SUBJECT TO 50 OR MORE OCCUPANTS
FIRE ALARM AND MASS NOTIFICATION SYSTEM (MNS)
• MECHANICAL ROOMS WILL HAVE BRACKET MOUNTED FIRE EXTINGUISHERS. UFC 3-600-01 § 9-17.3.2
• RECESSED OR SEMI-RECESSED CABINETS TO BE PROVIDED IN FINISHED SPACES. UFC 3-600-01 § 9-17.3.1
ELECTRONICS (EG: CLEAN AGENT).
• EXTINGUISHERS FOR ELECTRONIC EQUIPMENT AREAS SPACES WILL BE SUITABLE FOR UFC 3-600-01 § 9-17.2.2
• PORTABLE FIRE EXTINGUISHERS WILL BE LOCATED IN ACCORDANCE WITH NFPA 10. UFC 3-600-01 § 9-17.2.1
PORTABLE FIRE EXTINGUISHERS
• STANDPIPE SYSTEMS IS NOT REQUIRED. UFC 3-600-01 § 9-10.2.1
STANDPIPE SYSTEMS
• AUTOMATIC SPRINKLER PROTECTION IS NOT REQUIRED FOR SINGLE STORY TYPE I OR II CONSTRUCTION BUILDING UNDER 15,000 SFT. UFC 3-600-01 § 9-7.2.1.1
AUTOMATIC SPRINKLER PROTECTION
• THERE WILL BE NO ALTERATION TO THE EXISTING FIRE HYDRANT PLACMENT AND COVERAGE AS PART OF THE OF THIS PROJECT'S SCOPE OF WORK.
FIRE HYDRANT PLACEMENT AND COVERAGE (SEE CODE COMPLIANCE SITE PLAN)
• ACTUAL FIRE FLOW BASED ON A FIRE HYDRANT FLOW TEST IS 1,636 GALLONS AT 20 PSI.
• REQUIRED FIRE FLOW FOR A NON-SPRINKLERED FACILITY OF TYPE II(000) CONSTRUCTION AND LESS THAN 5,900 SFT IS 1,500 GPM. NFPA 1 TABLE 18.4.4.2.1
• FIRE FLOW FOR NON-SPRINKLERED BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 1 UFC 3-600-01 § 9-2.2
FIRE FLOW FOR FACILITIES
• FIRE DEPARTMENT VEHICLE ACCESS EXISTS AND WILL NOT BE MODIFIED FOR THIS BUILDING.
FIRE DEPARTMENT VEHICLE ACCESS
USE UFC 3-600-01 IN LIEU OF IBC CHAPTER 9. UFC 1-200-01 § 2-9
FIRE PROTECTION SYSTEMS:
NEW BUSINESS A OR B A OR B A, B, OR C CLASS I OR II
NEW ASSEMBLY < 300 A A OR B A, B, OR C CLASS II
EXITS
EXIT ACCESS
CORRIDORS
OTHER SPACES
INTERIOR FINISH
FLOOR
GROUP
WITH SPRINKLER SYSTEM
INTERIOR WALL, CEILING, AND FLOOR FINISHES: NFPA 101 CHAPTER 10 TABLE A.10.2.2, AND 12.3.3.5
• NO PROTECTION FROM HAZARDS REQUIRED.
PROTECTION FROM HAZARDS
SPECIFICALLY REFERENCE IBC CHAPTER 7.
CONFORM TO THE REQUIRMENTS OF NFPA 101 CHAPTER 8, EXCEPT WHERE IBC CHAPTERS 5 AND 6 UFC 3-600-01 § 7-1
IBC CHAPTER 7 AND UFC 3-600-01 APPLY. UFC 1-200-01 § 2-7
FIRE AND SMOKE PROTECTION FEATURES:
04/24/2026
:2 A
P R
IL
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
D R
U G
T E
S T
O F
F
N O
V A
T
IO
N
B
A
P R
IL
H D
R
D E
D C
S
J M
G-101
C O
D E
A N
A L Y
S
IS
• EVERY EXIT OR DIRECTIONAL SIGN WILL BE ILLUMINATED BY A RELIABLE LIGHT SOURCE. NFPA 101 § 7.10.5.1
LOCATION WHERE DIRECTION OF TRAVEL TO REACH THE NEAREST EXIT IS NOT APPARENT.
• A SIGN WITH DIRECTIONAL INDICATOR SHOWING DIRECTION OF TRAVEL WILL BE PLACED IN EVERY NFPA 101 § 7.10.2.1
THE EXIT OR WAY TO REACH EXITIS NOT READILY APPARENT TO OCCUPANTS.
• ACCESS TO EXITS WILL BE MARKED BY APPROVED, READILY VISIBLE SIGNS IN ALL CASES WHERE NFPA 101 § 7.10.1.5.1
EXITS, WILL BE MARKED BY APPROVED SIGNS.
• EXITS OTHER THAN MAIN EXTERIOR EXIT DOORS THAT ARE OBVIOUSLY AND CLEARLY IDENTIFIED AS NFPA 101 § 7.10.1.2.1
MARKING MEANS OF EGRESS
• MINIMUM ILLUMINATION FOR FLOORS AND OTHER WALKING SURFACES WILL BE AT LEAST 1 FC. NFPA 101 § 7.8.1.3 (2)
WALKING SURFACE).
• MINIMUM ILLUMINATION FOR MEANS OF EGRESS WILL BE AT LEAST 10 FC (MEASURED FROM NFPA 101 § 7.8.1.3 (1)
ILLUMINATION OF MEANS OF EGRESS
• NEW BUSINESS (NON-SPRINKLERED): 20 FEET NFPA 101 § 38.2.5.3.2
• NEW ASSEMBLY (NON-SPRINKLERED): 20 FEET NFPA 101 § 12.2.5.3
DEAD END CORRIDOR
• NEW BUSINESS (NON-SPRINKLERED): 75 FEET NFPA 101 § 38.2.5.2.3
• NEW ASSEMBLY (NON-SPRINKLERED): 20 FEET NFPA 101 § 12.2.5.2
COMMON PATH OF TRAVEL
• NEW BUSINESS (NON-SPRINKLERED): 200 FEET NFPA 101 § 38.2.6.2
• NEW ASSEMBLY (NON-SPRINKLERED): 200 FEET NFPA 101 § 38.2.5.3
TRAVEL DISTANCE TO AN EXIT
• IT EQUIPMENT ROOMS OR TELOCOMMUNICATIONS ROOMS 300 SQ FT/PERSON GROSS FLOOR AREA UCF 3-600-01 § 10-3.1, TABLE 10-1
• MECHANICAL, ELECTRICAL, OTHER BUILDING EQUIPMENT SPACES 500 SQ FT/PERSON GROSS FLOOR AREA UCF 3-600-01 § 10-3.1, TABLE 10-1
• STORAGE - IN STORAGE 500 SQ FT/PERSON GROSS FLOOR AREA NFPA 101 TABLE 7.3.1.2
• BUSINESS - OTHER 150 SQ FT/PERSON GROSS FLOOR AREA NFPA 101 TABLE 7.3.1.2
• ASSEMBLY - WAITING SPACES 15 SQ FT/PERSON GROSS FLOOR AREA NFPA 101 12.1.7.2
PROJECT OCCUPANCY LOAD FACTORS
OF THE REQUIRED EGRESS WIDTH.
• DOORS LEAVES SWINGING INTO THE MEANS OF EGRESS WILL LEAVE NOT LESS THAN ON HALF NFPA 101 § 7.2.1.4.3.1
DOOR LEAF ENCROACHMENT
• DOORS WILL SWING IN THE DIRECTION OF TRAVEL FROM ROOMS SERVING MORE THAN 50 PERSONS. NFPA 101 § 7.2.1.4.2 (1)
DOOR LEAF SWING DIRECTION
LIGHTING IN ACCORDANCE WITH NFPA 101 § 7.9.
• THE EGRESS SIDE OF ACCESS-CONTROLLED EGRESS DOORS WILL BE PROVIDED WITH EMERGENCY NFPA 101 § 7.2.1.6.2(7)
FIRE PROTECTIVE SIGNALLING SYSTEM IS MANUALLY RESET.
UNLOCK THE EGRESS DOORS IN THE DIRECTION OF EGRESS AND THEY WILL REMAIN UNLOCKED UNTIL THE
• ACTIVATION OF THE BUILDING SPRINKLER SYSTEM OR FIRE PROTECTION SIGNALING SYSTEM WILL NFPA 101 § 7.2.1.6.2(6)
THE LOCK, INDEPENDENT OF LOCKING SYSTEM ELECTRONICS.
• WHEN OPERATED, THE MANUAL RELEASE DEVICE WILL RESULT IN DIRECT INTERRUPTION OF POWER TO
READS "PUSH TO EXIT".
• THE MANUAL RELEASE DEVICE WILL BE READILY ACCESSIBLE AND CLEARLY IDENTIFIED BY A SIGN THAT
AND WITHIN 60 IN. OF THE SECURED DOOR OPENING.
• MANUAL RELEASE DEVICE WILL BE LOCATED ON THE EGRESS SIDE 40 IN TO 48 IN ABOVE THE FLOOR
DEVICE COMPLYING WITH THE FOLLOWING:
• DOOR LOCKS WILL BE ARRANGED TO UNLOCK IN THE DIRECTION OF EGRESS FROM A MANUAL RELEASE NFPA 101 § 7.2.1.6.2(3)
THE SENSOR OR TO THE PART OF THE SYSTEM THAT LOCKS THE DOOR.
• DOOR LEAVE WILL AUTOMATICALLY UNLOCK IN THE DIRECTION OF TRAVEL UPON LOSS OF POWER TO NFPA 101 § 7.2.1.6.2(2)
OF EGRESS UPON DETECTION OF APPROACHING OCCUPANT.
• SENSOR WILL BE PROVIDED ON THE EGRESS SIDE, ARRANGED TO UNLOCK THE DOOR IN THE DIRECTION NFPA 101 § 7.2.1.6.2(1)
LOCKING HARDWARE THAT PREVENTS EGRESS, PROVIDED THAT THE FOLLOWING ARE MET:
• DOOR ASSEMBLIES IN THE MEANS OF EGRESS WILL BE PERMITTED TO BE EQUIPPED WITH ELECTRICAL NFPA 101 § 7.2.1.6.2
ACCESS-CONTROLLED EGRESS DOOR ASSEMBLIES
BY WALLS HAVING NOT LESS THAN A 1-HOUR FIRE RESISTANCE RATING.
• CORRIDORS USED AS EXIT ACCES AND SERVING AN AREA HAVING AN OCCUPANT LOAD EXCEEDING 30 SHALL BE SEPARATED FROM OTHER PARTS OF THE BUILDING NFPA 101 § 7.1.3.1
NFPA 101 EXIT ACCESS CORRIDORS
OF THE 2015 IBC ARE ACCPETABLE.
• WHERE ABA STANDARDS REFERENCES PREVIOUS VERSIONS OF IBC, THE APPLICABLE REQUIRMENTS
ACT (ABA) STANDARDS.
• DO NOT USE IBC CHAPTER 10, EXCEPT WHERE REFERENCED BY ARCHITECTURAL BARRIERS
USE UFC 3-600-01 IN LIEU OF IBC CHAPTER 10. UFC 1-200-01 § 2-10
MEANS OF EGRESS (SEE LIFE SAFETY PLANS):
04/24/2026
:2 A
P R
IL
TD-1 TD-1
D
-1 T
D -1
T D
-1
TD-1 TD-1TD-1
TD-2TD-2 TD-2
T D
-2 T
D -2
T D
-2 T
D -2
T D
-2 T
D -2
TD-2TD-2
C P
-1 C
P -1
C P
-2 C
P -2
CP-2 CP-2
TESTING WOMEN
211 SF
TESTING MEN
287 SF
STORAGE
243 SF
TRAINING/BREAK
ROOM
279 SF
SECURE
STORAGE
135 SF
LABORATORY
72 SF
STORAGE
50 SF
MECH / ELEC
ROOM
241 SF
ADMIN
605 SF
DATA
94 SF
OFFICE
100 SF
RESTROOM
58 SF
JANITOR
44 SF
64"
32"
32"
32"
32"
WAITING ROOM
1055 SF
RESTROOM
VESTIBULE
EXIT VESTIBULE B
49 SF
ADMIN
CIRCULATION
429 SF
EXIT VESTIBULE A
51 SF
ENTRY
VESTIBULE
62 SF
A D
C
B
EXIT SIGNS
1. REFER TO ELECTRICAL LIGHTING DRAWINGS FOR
EXIT SIGNS AND EMERGENCY LIGHTING.
LIFE SAFETY PLAN LEGEND
CLEAR DOOR WIDTH [INCHES]
EXIT EGRESS CAPACITY [NO.OF PEOPLE]
EXITS
X"
XXX
EGRESS PATH
FIRE EXTINGUISHER
FIRE EXTINGUISHERS
EXIT DISCHARGE
TRAVEL DISTANCE
COMMON PATH
DEAD END
TD
CP
DE
EGRESS DISCHARGE
NOTE: ALL SYMBOLS MAY NOT BE USED.
T
IN
K E
R A
IR
F
O R
C E
B A
S E
O
K L A
H O
M A
P R
O J E
C T
I N
F O
R M
A T
IO
N
D E
S
IG
N F
IL
E
L O
C A
T
IO
N
R E
V
IS
IO
N
S
M A
R K
D E
S
IG
N G
R O
U P
D R
A W
N B
Y
C H
E C
K E
D B
Y
D E
S
IG
N E
D B
Y
D A
T E
D E
S C
R
IP
T
IO
N
1 2 3 4 5
E
D
C
B
A
M A
N A
G E
M E
N T
I N
F O
R M
A T
IO
N
1 2 3 4 5
E
D
C
B
A
IS
S
U E
D A
T E
SHEET NUMBER
S H
E E
T T
IT
L E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
Y K
D R
U G
T E
S T
O F
F
N O
V A
T
IO
N
B
GENERAL NOTES
KEY NOTES
LEGEND
A
P R
IL
H D
R
D E
D C
S
J M
G-102
L
IF
E S
A F
E T
Y P
L A
N
SCALE: 1/8" = 1'-0"G-102
LIFE SAFETY PLAN01
MEANS OF EGRESS
EGRESS
PATH ID OCCUPANCY SPRINKLER ACTUAL
MAXIMUM
PERMITTED
CP-1 BUSINESS NO 24' - 6" 75' - 0"
CP-2 BUSINESS NO 34' - 0" 75' - 0"
TD-1 BUSINESS NO 62' - 0" 200' - 0"
TD-2 BUSINESS NO 98' - 0" 200' - 0"
TOTAL 100
118 VESTIBULE B
BUSINESS
COLLABORATION
51 150 1
102 VESTIBULE A
BUSINESS
COLLABORATION
51 150 1
ADMIN
CIRCULATION
BUSINESS
CONCENTRATED
605 150 5
ENTRY
VESTIBULE
BUSINESS
CONCENTRATED
64 150 1
101 WAITING ROOM ASSEMBLY 1047 15 71
116 JANITOR
BUSINESS
CONCENTRATED
45 150 1
117 RESTROOM
BUSINESS
CONCENTRATED
58 150 1
112 OFFICE
BUSINESS
CONCENTRATED
100 150 1
103 STORAGE STORAGE 14 150 1
114 DATA
IT EQUIPMENT
ROOM
36 300 1
107 ADMIN
BUSINESS
COLLABORATION
605 150 5
MECH / ELEC
ROOM
MECH/ELEC 179 500 1
110 STORAGE STORAGE 50 500 1
109 LABORATORY
BUSINESS
CONCENTRATED
73 150 1
SECURE
STORAGE
STORAGE 111 500 1
113 STORAGE STORAGE 305 500 1
TRAINING/BREAK
ROOM
BUSINESS
COLLABORATION
280 150 2
106 TESTING MEN
BUSINESS
CONCENTRATED
291 150 2
TESTING
WOMEN
BUSINESS
CONCENTRATED
204 150 2
ROOM #
ROOM
DESCRIPTION OCCUPANT TYPE
AREA
(SQ SF)
OCCUPANT LOAD
FACTOR
(SQ SF/PERSON)
OCCUPANT
LOAD
OCCUPANT LOAD SCHEDULE BY USE
N
0 4' 8' 16'
04/24/2026
:2 A
P R
IL
W
W
W
W
W
W
W
W
W
W
W
W
X X X
X X
W W
W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W
W W
W W
N O
P
AR
KI
N
G
B7037
4644 SQ FT
FFE: 1227.57'
N O
P
AR
KI
N
G
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
N
W W
YK
DR
UG
T
ES
T
OF
FI
CE
R
EN
OV
AT
IO
N, B
LD
G
D
E
D C
S JM
G-103
C O
D E
C O
M
PL
IA
N
C E
SI
TE
PL
AN
SCALE: 1" = 10'
0 10' 20' 40'
CODE COMPLIANCE SITE PLAN
SCALE: 1" = 10'
G-103
EXISTING FIRE HYDRANT
UNDERGROUND WATER MAIN
FIRE DEPARTMENT CONNECTION
FIRE HOSE DISTANCE
1. THIS IS THE FIRE CODE COMPLIANCE SITE PLAN,
DIMENSIONS ARE NOT APPLICABLE FOR CIVIL CONSTRUCTION.
2. EXISTING FIRE HYDRANT LOCATED NEAR BUILDINGS 7007 AND 7014 IS
WITHIN 235 FEET OF DRUG TESTING FACILITY (BUILDING 7037).
GENERAL NOTES
KEY NOTES
LEGEND
A
P R
IL
04/24/2026
:2 A
P R
IL
FLAG POLE
SANITARY SEWER CLEANOUT
AIR CONDITIONER UNIT
SPRINKLER VALVE
SPRINKLER HEAD
TRAFFIC/ELECTRIC PULL BOX
TELEPHONE MANHOLE
SIGN
COMMERCIAL SIGN
UNDERGROUND CABLE TV LINE
WATER LINE
GAS LINE
OVERHEAD ELECTRIC LINE
GAS VALVE
STORM DRAIN MANHOLE
SANITARY SEWER MANHOLE
TRANSFORMER POLE
TELEPHONE RISER
FIRE HYDRANT
LIGHT POLE
GAS METER
POWER POLE
ELECTRIC UNDERGROUND LINE
ELECTRIC MANHOLE
GROUND TRANSFORMER
SANITARY SEWER LINE
GAS VENT
PAY PHONE
GUARD POST
MONUMENT FOUND
MONUMENT SET
W W W
SS SS SS
G G
UGE UGE
STORM DRAIN LINE
UNDERGROUND TELEPHONE LINEUGT UGT UGT
CO
EXISTING CONTOUR
CURB AND GUTTER
SURFACE DRAINAGE FLOWLINE
UNDERGROUND FIBER OPTIC LINEFO FO FO
WATER LINE (ATLAS)
SANITARY SEWER LINE (ATLAS)
GUY POLE
DOWN GUY
COMMUNICATIONS VAULT
UNDERGROUND COMMUNICATIONS LINECOMM COMM
MARKED PIPELINE
WATER LINE (IRRIGATION)
OHE OHE
PIPE FENCE
CHAINLINK FENCE
SECURITY FENCEX X
ELECTRIC FENCE
HOG WIRE FENCE
GAS LINE (ATLAS)
IRR IRR IRR
MONITORING WELL
WATER VALVE BOX
WATER METER
UST FUEL FILL PORT
GROUND LIGHT
HANDHOLE, ELECTRIC
EM ELECTRIC METER
HOSE BIB
WATER VENT
TRAFFIC DETECTOR LOOP
TRAFFIC SIGNAL POLE
TRAFFIC CONTROL BOX
PARKING METER
BORE HOLE LOCATION
GEO PROBE
DOUBLE PARKING METER
XXX.XX GUTTER ELEVATION, UNLESS OTHERWISE NOTED
LOC LOC LIMITS OF CONSTRUCTION
TREE DRIP LINE
SHRUB LINE
1. REMOVE AND REPLACE ALL EXISTING PAVEMENTS, CURBS,
DRIVEWAYS, SIDEWALKS, GRAVEL ROADWAYS, PIPE CULVERTS,
CULVERT HEADWALLS, FENCES, SIGNS, AND MISCELLANEOUS
ITEMS WHERE REQUIRED TO COMPLETE THE CONSTRUCTION.
2. REPAIR TO ORIGINAL CONDITION ANY DAMAGE INCURRED
DURING CONSTRUCTION AT NO EXPENSE TO OWNER.
3. PRIOR TO BEGINNING ANY CONSTRUCTION, FIELD VERIFY AND
PROTECT THE LOCATIONS AND ELEVATIONS OF ALL EXISTING
FACILITIES (UTILITIES, PIPING, EQUIPMENT, STRUCTURES,
FENCING, BARRIERS, PAVEMENT, SIDEWALKS, SIGNAGE, ETC.)
WHICH PERTAIN TO AND/OR AFFECT CONSTRUCTION OF THIS
PROJECT.
4. VERIFY ALL DEPTHS AND LOCATIONS OF EXISTING UTILITIES
PRIOR TO ANY CONSTRUCTION. ALL UTILITIES MAY NOT BE
SHOWN. CONTACT UTILITY SERVICE PROVIDERS AT LEAST 48
HOURS PRIOR TO TRENCHING OR EXCAVATION, AND REQUEST
FIELD LOCATION OF UTILITIES. ONE-CALL LOCATOR SERVICES
MAY NOT COVER ALL UTILITIES IN THIS AREA.
5. ANY EXISTING FACILITIES THAT ARE DAMAGED OR REMOVED
SHALL BE REPAIRED OR REPLACED TO A CONDITION EQUAL TO
OR BETTER THAN ORIGINAL CONDITIONS AT NO ADDITIONAL
COSTS.
6. RESTORE ALL DRIVEWAYS, CULVERTS, HEADWALLS,
LANDSCAPING, AND OTHER IMPROVEMENTS (REGARDLESS OF
WHETHER THEY WERE CONSTRUCTED OR INSTALLED BY
PUBLIC AGENCIES, UTILITIES, OR INDIVIDUALS) THAT ARE
DISTURBED BY CONSTRUCTION TO A CONDITION EQUAL TO OR
BETTER THAN ORIGINAL CONDITIONS.
7. ALL AREAS DISTURBED OR EXPOSED DURING CONSTRUCTION
SHALL BE REVEGETATED AND RESTORED TO ORIGINAL
CONDITIONS IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS.
8. ALL WATER LINE AND SEWER FORCE MAIN PIPE INSTALLED
SHALL HAVE RESTRAINED JOINTS. PROVIDE CONCRETE THRUST
BLOCKS ONLY WHERE APPROVED.
9. IMMEDIATELY NOTIFY THE ENGINEER OF ANY UNREPORTED
OBSTACLES THAT MAY IMPEDE OR PREVENT THE
CONSTRUCTION OF THE WORK.
10. ANY PORTION OF THE PROJECT IMPROPERLY PLACED AND/OR
CONFLICTING WITH ANY EXISTING STRUCTURE SHALL BE
REMOVED, CORRECTLY PLACED AND NO SEPARATE PAY SHALL
BE APPROVED FOR ASSOCIATED COSTS.
11. CONSTRUCTION OPERATIONS SHALL BE CONDUCTED IN SUCH A
MANNER AS TO PROTECT EXISTING FACILITIES AT ALL TIMES.
12. RECORD AND SUPPLY TO ENGINEER THE FOLLOWING
INFORMATION:
A. LOCATION AND ELEVATION OF ALL SUPPLEMENTARY
CONNECTIONS.
B. "AS-BUILT" INVERTS AND PROFILE OF CONSTRUCTED
PIPELINE.
C. THE NEW LOCATION AND DEPTH OF ALL RELOCATED AND/OR
ADJUSTED UTILITIES.
D. LOCATION AND ELEVATION OF ALL UTILITIES ENCOUNTERED.
13. ALL HOLES, TRENCHES, AND OTHER HAZARDOUS AREAS SHALL
BE ADEQUATELY PROTECTED BY PROTECTIVE DEVICES.
14. ALL TRENCHES SHALL BE BACKFILLED WITHIN SEVEN (7) DAYS
OF INITIAL EXCAVATION UNLESS APPROVED IN WRITING BY
ENGINEER.
15. ALL EROSION AND SEDIMENTATION CONTROLS SHALL BE
IMPLEMENTED BEFORE CONSTRUCTION COMMENCES AND
SHALL BE MAINTAINED UNTIL SITE IS STABILIZED AFTER
COMPLETION OF WORK IN EACH WORK AREA.
16. ANY DEWATERING SHALL BE INCLUDED IN THE CONTRACT
PRICE. NO SPECIAL PAY ITEM.
17. ALL SPOIL AND EXCESS MATERIAL NOT USED IN CONSTRUCTION
SHALL BE REMOVED FROM THE SITE AND PROPERLY DISPOSED
OF, AS COORDINATED WITH THE CONTRACTING OFFICER.
18. CONFORM TO THE APPLICABLE LOCAL, STATE, AND FEDERAL
REGULATIONS REGARDING TRENCH SAFETY. PREPARE A
TRENCH SAFETY PLAN FOR ALL EXCAVATIONS EXCEEDING
4-FEET IN DEPTH AND 4-FEET IN WIDTH, TO BE INCLUDED IN
HEALTH AND SAFETY PLAN.
19. CONFINE WORK AREAS TO WITHIN THE PROJECT BOUNDARY.
PRIOR TO FINAL ACCEPTANCE, REMOVE ALL TRASH AND DEBRIS
WITHIN THE PERMANENT EASEMENTS AND TEMPORARY
EASEMENTS.
20. FIELD CHANGES TO THE HORIZONTAL AND VERTICAL DESIGN
MAY BE ALLOWED SUBJECT TO THE APPROVAL OF THE
ENGINEER. FIELD CHANGES SHALL COMPLY WITH THE DESIGN
INTENT AS NOTED ON THE DRAWINGS AND SPECIFICATIONS.
21. ALL CONSTRUCTION SHALL FOLLOW OKLAHOMA DEPARTMENT
OF TRANSPORTATION (ODOT) SPECIFICATIONS, STANDARDS,
AND MATERIAL ITEM NUMBERS AS CLOSELY AS POSSIBLE.
ENVIRONMENTAL QUALITY NOTES:
1. PRIOR TO COMMENCING CONSTRUCTION, ALL TEMPORARY
EROSION AND SEDIMENTATION (E&S) CONTROL MEASURES
SHALL BE PROPERLY SELECTED AND INSTALLED. ALL
TEMPORARY E&S CONTROL MEASURES SHALL BE MAINTAINED
IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS
AND GOOD ENGINEERING PRACTICES. THE CONTROLS SHALL
REMAIN IN PLACE UNTIL DISTURBED AREAS ARE REVEGETATED
AND THE AREAS HAVE BECOME PERMANENTLY STABILIZED.
2. IF SEDIMENT ESCAPES THE CONSTRUCTION SITE, OFF-SITE
ACCUMULATIONS OF SEDIMENT MUST BE REMOVED AT A
FREQUENCY SUFFICIENT TO MINIMIZE OFFSITE IMPACTS TO
WATER QUALITY (E.G., FUGITIVE SEDIMENT IN STREET BEING
WASHED INTO SURFACE STREAMS OR SENSITIVE FEATURES BY
THE NEXT RAIN).
3. LITTER, CONSTRUCTION DEBRIS, AND CONSTRUCTION
CHEMICALS EXPOSED TO STORMWATER SHALL BE PREVENTED
FROM BECOMING A POLLUTANT SOURCE FOR STORMWATER
DISCHARGES (E.G., SCREENING OUTFALLS, PICKED UP DAILY).
4. ALL SPOILS (EXCAVATED MATERIAL) GENERATED FROM THE
PROJECT SITE AND STORED ON-SITE MUST HAVE PROPER E&S
CONTROLS INSTALLED.
5. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS
PRACTICABLE IN PORTIONS OF THE SITE WHERE
CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR
PERMANENTLY CEASED, AND CONSTRUCTION ACTIVITIES WILL
NOT RESUME WITHIN 21 DAYS. WHEN THE INITIATION OF
STABILIZATION MEASURES BY THE 14TH DAY IS PRECLUDED BY
WEATHER CONDITIONS, STABILIZATION MEASURES SHALL BE
INITIATED AS SOON AS PRACTICABLE.
6. THESE GENERAL CONSTRUCTION NOTES SHALL BE PROVIDED
TO ALL SUBCONTRACTORS.
EROSION AND SEDIMENTATION CONTROL
NOTES:
1. EROSION CONTROL MEASURES, SITE WORK AND RESTORATION
WORK SHALL BE IN ACCORDANCE WITH THE CONTRACT.
2. SILT FENCE, ROCK BERMS, SEDIMENTATION BASINS, SILT SOCK
AND SIMILARLY RECOGNIZED TECHNIQUES AND MATERIALS
SHALL BE EMPLOYED DURING CONSTRUCTION TO PREVENT
POINT SOURCE SEDIMENTATION LOADING OF DOWNSTREAM
FACILITIES. SUCH INSTALLATION SHALL BE REGULARLY
INSPECTED FOR EFFECTIVENESS. ADDITIONAL MEASURES MAY
BE REQUIRED IF, IN THE OPINION OF THE ENGINEER, THEY ARE
WARRANTED.
3. MAINTAIN ALL TEMPORARY EROSION CONTROL STRUCTURES.
TRENCH SAFETY NOTES:
1. ALL WORK PERTAINING TO OPEN TRENCHING SHALL COMPLY
WITH THE U. S. OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) REGULATIONS.
2. THE CONTRACTOR AND/OR CONTRACTOR'S INDEPENDENTLY
RETAINED EMPLOYEE OR STRUCTURAL
DESIGN/GEOTECHNICAL/SAFETY/EQUIPMENT CONSULTANT, IF
ANY, SHALL REVIEW THESE PLANS AND AVAILABLE
GEOTECHNICAL INFORMATION AND THE INSTALLATION SITE(S)
WITHIN THE PROJECT WORK AREA IN ORDER TO IMPLEMENT
CONTRACTOR'S TRENCH EXCAVATION SAFETY PROTECTION
SYSTEM, PROGRAMS AND/OR PROCEDURES. THE
CONTRACTOR'S IMPLEMENTATION OF THE SYSTEMS,
PROGRAMS AND/OR PROCEDURES SHALL PROVIDE FOR
ADEQUATE TRENCH EXCAVATION SAFETY PROTECTION THAT
COMPLIES WITH OSHA STANDARDS FOR TRENCH EXCAVATION.
SPECIFICALLY, CONTRACTOR AND/OR CONTRACTOR'S
INDEPENDENTLY RETAINED EMPLOYEE OR SAFETY
CONSULTANT SHALL IMPLEMENT A TRENCH SAFETY PROGRAM
IN ACCORDANCE WITH OSHA STANDARDS GOVERNING THE
PRESENCE OF ACTIVITIES OF INDIVIDUALS WORKING IN AND
AROUND TRENCH EXCAVATION.
TRAFFIC CONTROL NOTES:
1. PROVIDE AND MAINTAIN ANY REQUIRED TRAFFIC CONTROL
DEVICES DURING CONSTRUCTION IN ACCORDANCE WITH THE
STATE'S DEPARTMENT OF TRANSPORTATION MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES.
2. ALL TRAFFIC CONTROL DEVICES, LAYOUTS, AND MAINTENANCE
SHOULD BE INCIDENTAL TO THE COST ASSOCIATED WITHIN THE
VICINITY OF HIGHWAYS, ROADS, AND STREETS INDICATED ON
THE CONTRACT DRAWINGS.
3. MARK ALL CONSTRUCTION EQUIPMENT AND VEHICLES WITH
COMPANY PAINT DESIGNS, INSIGNIAS OR OTHER COMPANY
MARKINGS WHICH ARE CLEARLY VISIBLE.
4. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC
SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN
REVERSE.
5. ONLY RUBBER TIRED VEHICLES WILL BE ALLOWED ON EXISTING
PAVEMENT WHICH IS TO REMAIN.
COORDINATION AND COMMUNICATION
DURING CONSTRUCTION
1. IF AFTER HOURS OR WEEKEND WORK IS REQUIRED, THE
CONTRACTING OFFICER SHALL BE NOTIFIED 14 CALENDAR DAYS
PRIOR TO DAY OF NEED. AFTER HOURS OR WEEKEND WORK
ARE SUBJECT TO GOVERNMENT APPROVAL AND AVAILABILITY
OF ESCORTS.
2. ALL PERSONNEL ARE RESPONSIBLE FOR OBTAINING PROPER
PASS PRIOR TO ENTERING SITE. COORDINATE WITH
CONTRACTING OFFICER ON SUBMITTING ACCESS REQUESTS A
MINIMUM OF 14 CALENDAR DAYS PRIOR (ACCESS
REQUIREMENTS ARE SUBJECT TO SUDDEN CHANGES TO MEET
SECURITY REQUIREMENTS).
3. KEEP ALL ROADS CLEAN OF CONSTRUCTION DEBRIS, MUD, ETC.
AT ALL TIMES. PROVIDE EQUIPMENT AND PERSONNEL TO
CLEAN ROADS AS REQUESTED BY CONTRACTING OFFICER.
4. VIDEO DOCUMENT CONDITION OF ALL PAVEMENTS, SIDEWALKS,
GRAVEL AREAS, LANDSCAPED AREAS, STREETS, PARKING
AREAS, ETC. PRIOR TO CONSTRUCTION AND REPAIR DUE TO
DAMAGE CAUSED BY CONSTRUCTION AND/OR DEMOLITION
ACTIVITIES AT NO ADDITIONAL COST TO THE GOVERNMENT AS
REQUESTED BY CONTRACTING OFFICER.
5. CONTRACTOR SHALL PROVIDE OIL/FUEL SORBENT SOCKS
DURING CONSTRUCTION IN THE FUEL TRUCK PARKING AREA.
SORBENT SOCKS SHALL BE IMMEDIATELY DEPLOYED TO
PROTECT CONSTRUCTION TRENCH IN THE EVENT OF A FUEL
SPILL.
CIVIL LEGEND ABBREVIATIONS
ME: MATCH EXISTING
FL: FLOW LINE
TC: TOP OF CURB
TW: TOP OF WALL
TYP: TYPICAL
DIA: DIAMETER
NTS: NOT TO SCALE
OCEW: ON CENTER EACH WAY
UNO: UNLESS NOTED OTHERWISE
LEGEND NOTES
1. ALL SYMBOLS OR LINETYPES/PATTERNS ARE NOT NECESSARILY
USED ON THIS PROJECT.
2. SCREENING OR SHADING OF WORK IS USED TO INDICATE
EXISTING COMPONENTS OR TO DE-EMPHASIZE PROPOSED
IMPROVEMENTS TO HIGHLIGHT SELECTED TRADE WORK. REFER
TO CONTEXT OF EACH SHEET FOR USAGE .
GENERAL NOTES
EXISTING CONCRETE
EXISTING ASPHALT
CONCRETE DEMO
ASPHALT DEMO
PROPOSED ASPHALT
PROPOSED CONCRETE
EXISTING CONCRETE SIDEWALK
PROPOSED SIDEWALK
ROOF DRAIN
XXXX
N W
JS
EP
C-001
C
IV
IL
G
EN
ER
AL
N
O
TE
S
AN
D L
EG
EN
D
TI
N
KE
R A
IR
F
O R
C E
BA
SE
, O
KL
AH
O
M A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
W W
YK
DR
UG
T
ES
T
OF
FI
CE
R
EN
OV
AT
IO
N, B
LD
G
A
PR
H D
R
:2 A
P R
IL
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
UGE
UGE
UGE
UGE UGE
UGE UGE UGE UGE UGE UGE UGE UGE UGE
UGE
U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E U
G E
U G
E
UGE UGE UGE UGE UGE UGE UGE UGE
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
CO
M
M
COMM COMM COMM COMM COMM COMM
G G
G G
G G
G
G
W W
W W
W
W W
W
SS SS SS SS SS SS SS
U G
E
UGE
UGE
UGE
U G
E U
G E
UGE
SS
W W
W W
W W
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
CO
M
M
CO
M
M
COMM
COMM
COMM
G G
G G
G
G G
X X
X
W W W W W W W W W W W W W W W W W W W W W W W
W W W W W W
W
SS
SS SS SS SS SS SS SS SS SS SS SS
SS
B7037
2781.00 SQ FT
FFE: 1227.57'
CONTROL POINT #100
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .