Att11-Appendix_D-Pricing Matrix_Production_31Mar26-DRAFT.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
B-52J CERP Production Modification Kits & ICS
Solicitation number
FA810726RB001
Issued by

About this file

This is a pricing matrix template and instructions document for the B-52J Commercial Engine Replacement Program (CERP) Kit Production contract. The document establishes the framework for offerors to submit unit prices, labor rates, and material handling rates across a 10-year performance period (4 basic years plus 6 option years) covering multiple contract line items (CLINs) valued at approximately $90,000 in total evaluated price.

The pricing matrix requires offerors to propose fixed prices for Program/Manufacturing Management, Integrated Logistics Support, FSR Support at Tinker AFB, and Travel and Per Diem (X001-X004); unit prices for three kit groups in Lot 1 (Kit Groups A, B, and E), each divided into Long Lead Parts and Non-Long Lead Parts (X005-X007); unit prices for Lots 2-6 across the three kit groups (X008-X010); material handling rates for Spare Parts, Peculiar Support Equipment, Production Tooling, and Common Support Equipment (X011-X014); engineering labor rates for Data (Separately Priced) and Over & Above Labor (X016-X017); and G&A rates for Over & Above Materials, Storage, Shipping, and Travel (X018-X021). All proposed labor rates must be rounded to the nearest cent, indirect/burden rates to four decimal places as percentages, and dollar amounts to the nearest cent. The instructions specify that gray-highlighted cells in the pricing matrix automatically populate from a Rate Table, with extended prices calculated by multiplying unit prices by evaluation quantities. Separate worksheets are provided for offerors to detail Long Lead Parts pricing for Kit Groups A, B, and E in Basic Year 1. The document notes that all proposed rates should adequately cover labor costs, indirect costs including G&A and COM, and prime/subcontractor profit, with quantities being notional and subject to variation based on funding availability and program constraints.

View the file

Other files

File Type Posted
DRAFT-Solicitation-FA810726RB001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

B-52J Commercial Engine Replacement Program (CERP) Kit Production
Pricing Matrix Instructions - DRAFT
1Enter Offeror name in Cell B1 of the "Pricing Matrix:"

Enter proposed unit prices in the "Pricing Matrix" worksheet in ALL yellow highlighted cells.

Enter all proposed rates into the Rates Table in the "Pricing Matrix" worksheet.

Note: The gray-highlighted cells in the Pricing Matrix are linked to the Rate Table and will populate automatically. The extended price is calculated by adding 100% to the proposed indirect/burden rates and multiplying by the evaluation dollar estimate.
Example: A proposed Prime Material Handling Rate of 7.55% in the Rate Table is included in the Pricing Matrix on the applicable CLIN as 107.55%.
2Complete the worksheets for Long Lead Parts Group A, B, and E and follow the instructions included in the worksheet.
3Rounding:

All proposed dollar amounts shall be rounded to the nearest cent. All proposed labor rates shall be rounded to the nearest cent. All indirect/burden rates shall be rounded to four decimal places and entered as a percentage (ex. 0.0755 = 7.55%) in the rate table. At the CLIN level, the rate will be entered as 100% plus the proposed rate (ex. 7.55% is entered as 107.55%).

4For a detailed breakdown of how the extended price for each CLIN and the Total Evaluated Price (TEP) is calculated, refer to the "Calculation Methodology" worksheet.
5The X reference for the CLINs in Column A will become the number of the applicable basic period or option period as labeled in Row 4. For example, CLIN X001 will be 0001 for the Basic Period (Year 1), 1001 for Basic Period (Year 2), and 2001 for Basic Period (Year 3), etc.
6The following Notes are also included in the Pricing Matrix worksheet.
Note 1:Engineering, Administrative, and Fabrication labor rates will be applied to the applicable CLIN based on the TDP update. Reference Requirements Update Process Change Document for details.
Note 2:The Prime Material Handling Rate or Subcontractor Material Handling Rate will be applied as applicable for CLINs X011-X014, and X018 during contract execution.
For evaluation purposes, CLINs X011-X013 apply the Prime Material Handling Rate and CLINs X014 and X018 apply the Subcontractor Material Handling Rate.
Note 3:While fixed hourly labor rates are being used for evaluation purposes, the proposed overtime or premium rates may be required during the life of the contract and will be utilized and applied as applicable.
Note 4:Quantities in the Pricing Matrix, are notional, and actual quantities may vary during contract performance based on funding availability and program constraints.
Note 5:All rates should be proposed sufficiently to ensure adequate coverage of all labor costs, all indirect costs, including G&A, COM, and so forth as well as prime and subcontractor profit in every contract out-year.
Note 5:The quantity of 1 each in Basic Year 1 for CLINs X008 - X010 is for evaluation purposes only and may not be required during contract execution.

Calculation Methodology B-52J Commercial Engine Replacement Program (CERP) Kit Production

CLIN Description Calculation Methodology

X001Program/Manufacturing ManagementProposed monthly unit price per year is multiplied by the by the applicable number of months to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
X002Integrated Logistics Support
X003FSR Support - Tinker AFB (Depot)
X004Travel and Per Diem - To Be Negotiated (TBN) Per Occurrence - Travel G&A RateThe proposed Travel G&A rate per year is multiplied by the Evaluation Travel Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
X005Lot 1 Kit Group #AProposed unit price per year is multiplied by the by the estimated quantity per year to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
X005AALong Lead Parts
X005ABNon-Long Lead Parts
X006Lot 1 Kit Group #B
X006AALong Lead Parts
X006ABNon-Long Lead Parts
X007Lot 1 Kit Group #E
X007AALong Lead Parts
X007ABNon-Long Lead Parts
X008Lots 2-6 Kit Group #AThe proposed unit price per year is multiplied by the evaluation quantity per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
X009Lots 2-6 Kit Group #B
X010Lots 2-6 Kit Group #E
X011Spare Parts - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 BelowThe proposed applicable Prime or Subcontractor Material Handling Rate per year is multiplied by the Evaluation Material Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
X012Peculiar Support Equipment - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 Below
X013Production Tooling - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 Below
X014Common Support Equipment - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 Below
X015Data (Not Separately Priced)NOT EVALUATED
X016Data (Separately Priced) - TBN Per Occurrence - Engineering Fixed Hourly Labor RatesThe proposed Engineering Fixed Hourly Labor Rate per year is multiplied by the Evaluation Labor Hours per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
X017Over & Above Labor - TBN Per Occurrence - Engineering Fixed Hourly Labor Rates
X018Over & Above Materials - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 BelowThe proposed applicable Subcontractor Material Handling Rate per year is multiplied by the Evaluation Material Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
X019Over & Above Storage - TBN Per Occurrence - Transportation/Shipping G&A RateThe proposed Transportation/Shipping G&A rate per year is multiplied by Evaluation Transportation/Shipping Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
X020Over & Above Shipping - TBN Per Occurrence - Transportation/Shipping G&A Rate
X021Over & Above Travel - TBN Per Occurrence - Travel G&A RateThe proposed Travel G&A rate per year is multiplied by the Evaluation Travel Dollars per year as applicable to establish the extended price for each year. The sum of the extended prices for all years equals the total CLIN price.
Total Evaluated Price (TEP)The sum of the total price for all CLINs for the Basic Period Years 1-4 and all Option Period Years 5-10.
The TEP is for evaluation purposes only and is not the contract award amount.

Pricing Matrix

Offeror:Insert Offeror NameDRAFT PRICING MATRIX 31 March 2026
The estimated quantities expressed below are for evaluation purposes and may vary during contract execution.
Review the Instructions Worksheet before completing the Pricing MatrixNote: The quantities provided below will be updated with the final RFP release.
CLINs 00XXCLINs 10XXCLINs 20XXCLINs 30XXCLINs 40XXCLINs 50XXCLINs 60XXCLINs 70XXCLINs 800XCLINs 90XX
B-52J Commercial Engine Replacement
Program (CERP) Kit ProductionBasic Period
(Year 1)Basic Period
(Year 2)Basic Period
(Year 3)Basic Period
(Year 4)Option Period 1
(Year 5)Option Period 2
(Year 6)Option Period 3
(Year 7)Option Period 4
(Year 8)Option Period 5
(Year 9)Option Period 6

(Year 10)

CLINContract
TypeDescriptionUnit of IssueQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceQtyUnit PriceExtended PriceTotal Evaluated PriceCLIN
X001FFPProgram/Manufacturing ManagementMO12$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 0$ - 0X001
X002FFPIntegrated Logistics SupportMO12$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 0$ - 0X002
X003FFPFSR Support - Tinker AFB (Depot)MO12$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 012$ - 0$ - 0X003
X004TBN (FFP)Travel and Per Diem - To Be Negotiated (TBN) Per Occurrence - Travel G&A RateEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X004
X005Lot 1 Kit Group #AX005
X005AAFFPLong Lead PartsEA5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0X005AA
X005ABFFPNon-Long Lead PartsEA5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0X005AB
X006Lot 1 Kit Group #BX006
X006AAFFPLong Lead PartsEA5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0X006AA
X006ABFFPNon-Long Lead PartsEA5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0X006AB
X007Lot 1 Kit Group #EX007
X007AAFFPLong Lead PartsEA5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0X007AA
X007ABFFPNon-Long Lead PartsEA5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0X007AB
Lots 2-6 KitsSee Note 6
X008FPEPALots 2-6 Kit Group #AEA1$ - 012$ - 017$ - 017$ - 012$ - 011$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0X008
X009FPEPALots 2-6 Kit Group #BEA1$ - 012$ - 017$ - 017$ - 012$ - 011$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0X009
X010FPEPALots 2-6 Kit Group #EEA1$ - 012$ - 017$ - 017$ - 012$ - 011$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0X010
Technical Data Package (TDP) Updates

See Note 1 Below

Engineering Fixed Hourly Rate160$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0$ - 0
Administrative Fixed Hourly Rate35$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0$ - 0
Fabrication Fixed Hourly Rate165$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0$ - 0
X011TBN (FFP)Spare Parts - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 BelowEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X011
X012TBN (FFP)Peculiar Support Equipment - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 BelowEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X012
X013TBN (FFP)Production Tooling - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 BelowEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X013
X014TBN (FFP)Common Support Equipment - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 BelowEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X014
X015NSPData (Not Separately Priced)EAX015
X016TBN (FFP)Data (Separately Priced) - TBN Per Occurrence - Engineering Fixed Hourly Labor RatesEA180$ - 0$ - 0180$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 0$ - 0X016
X017TBN (FFP)Over & Above Labor - TBN Per Occurrence - Engineering Fixed Hourly Labor RatesEA180$ - 0$ - 0180$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 040$ - 0$ - 0$ - 0X017
X018TBN (FFP)Over & Above Materials - TBN Per Occurrence - Prime or Subcontractor Material Handling Rates - See Note 2 BelowEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X018
X019TBN (FFP)Over & Above Storage - TBN Per Occurrence - Transportation/Shipping G&A RateEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X019
X020TBN (FFP)Over & Above Shipping - TBN Per Occurrence - Transportation/Shipping G&A RateEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X020
X021TBN (FFP)Over & Above Travel - TBN Per Occurrence - Travel G&A RateEA$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 1,000100.00%$ 1,000.00$ 10,000.00X021
TOTAL$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 9,000.00$ 90,000.00
$ 90,000.00cross check
Rate TableBasic Period
(Year 1)Basic Period
(Year 2)Basic Period
(Year 3)Basic Period
(Year 4)Option Period 1
(Year 5)Option Period 2
(Year 6)Option Period 3
(Year 7)Option Period 4
(Year 8)Option Period 5
(Year 9)Option Period 6

(Year 10)

Administrative Fixed Hourly RateLabor
Administrative Overtime RateLabor
Administrative Premium RateLabor
Engineering Fixed Hourly RateLabor
Engineering Overtime RateLabor
Engineering Premium RateLabor
Fabrication Fixed Hourly RateLabor
Fabrication Overtime RateLabor
Fabrication Premium RateLabor
Prime Material Handling RateMhx
Subcontractor Material Handling RateMhx
Travel G&A RateTravel
Transportation/Shipping G&A RateTrans/Ship

Note 1: Engineering, Administrative, and Fabrication labor rates will be applied to the applicable CLIN based on the TDP update. Reference Requirements Update Process Change Document for details.

Note 2:The Prime Material Handling Rate or Subcontractor Material Handling Rate will be applied as applicable for CLINs X011-X014, and X018 during contract execution.
For evaluation purposes, CLINs X011-X013 apply the Prime Material Handling Rate and CLINs X014 and X018 apply the Subcontractor Material Handling Rate.

Note 3: While fixed hourly labor rates are being used for evaluation purposes, the proposed overtime or premium rates may be required during the life of the contract and will be utilized and applied as applicable.

Note 4: Quantities in the Pricing Matrix, are notional, and actual quantities may vary during contract performance based on funding availability and program constraints.

Note 5: All rates should be proposed sufficiently to ensure adequate coverage of all labor costs, all indirect costs, including G&A, COM, and so forth as well as prime and subcontractor profit in every contract out-year.

Note 6: The quantity of 1 each in Basic Year 1 for CLINs X008 - X010 is for evaluation purposes only and may not be required during contract execution.

&A Source Selection Information See FAR 2.101 & 3.104 &P

Long Lead Parts Grp A

Offeror:Insert Offeror NameDRAFT PRICING MATRIX 31 March 2026
INSTRUCTIONS - Fill in the yellow highlighted cells as follows:
Insert the Description of Long Lead Parts for Lot 1 Kit Group #A in Column C.

Insert the Proposed Unit Prices (Column E) and Proposed Quantities (Column F) for the Basic Period Year 1.

Offerors may insert additional rows as needed.

Enter the total price for CLIN X005AA in the corresponding cell (proposed unit price) in the Pricing Matrix spreadsheet for Basic Period Year 1.

B-52J CERP Kit Production
Basic Period (Year 1)
CLINContract TypeDescriptionUnit of IssueProposed Unit PriceProposed QuantityExtended Total
X005Lot 1 Kit Group #A - Long Lead Parts
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
X005AAFFPEA$ - 0
Total CLIN X005AA$ - 0

Long Lead Parts Grp B

Offeror:Insert Offeror NameDRAFT PRICING MATRIX 31 March 2026
INSTRUCTIONS - Fill in the yellow highlighted cells as follows:
Insert the Description of Long Lead Parts for Lot 1 Kit Group #B in Column C.

Insert the Proposed Unit Prices (Column E) and Proposed Quantities (Column F) for the Basic Period Year 1.

Offerors may insert additional rows as needed.

Enter the total price for CLIN X006AA in the corresponding cell (proposed unit price) in the Pricing Matrix spreadsheet for Basic Period Year 1.

B-52J CERP Kit Production
Basic Period (Year 1)
CLINContract TypeDescriptionUnit of IssueProposed Unit PriceProposed QuantityExtended Total
X006Lot 1 Kit Group #B - Long Lead Parts
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
X006AAFFPEA$ - 0
Total CLIN X006AA$ - 0

Long Lead Parts Grp E

Offeror:Insert Offeror NameDRAFT PRICING MATRIX 31 March 2026
INSTRUCTIONS - Fill in the yellow highlighted cells as follows:
Insert the Description of Long Lead Parts for Lot 1 Kit Group #E in Column C.

Insert the Proposed Unit Prices (Column E) and Proposed Quantities (Column F) for the Basic Period Year 1.

Offerors may insert additional rows as needed.

Enter the total price for CLIN X007AA in the corresponding cell (proposed unit price) in the Pricing Matrix spreadsheet for Basic Period Year 1.

B-52J CERP Kit Production
Basic Period (Year 1)
CLINContract TypeDescriptionUnit of IssueProposed Unit PriceProposed QuantityExtended Total
X007Lot 1 Kit Group #E - Long Lead Parts
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
X007AAFFPEA$ - 0
Total CLIN X007AA$ - 0

File details come from the government source that posted it. Updated .