Att1 11mRB Mk4 Specification 17Mar22 REV- DRAFT.pdf

PDF 1 MB Posted

Attached to
11m Open Center Console RIB
Solicitation number
N00024-22-R-2224
Issued by

About this file

This document is a draft solicitation for an 11-meter open center console rigid inflatable boat (RIB). The Navy seeks this multi-purpose boat for missions including anti-terrorism/force protection, maritime interdiction operations, visit board search and seizure, safety, towing, and personnel transport. The solicitation anticipates a formal request for proposal and encourages industry to review and provide feedback on the draft requirements. Key details include specifications for a 380-horsepower inboard diesel engine, waterjet propulsion, navigation and communications equipment, and capacity for 26 personnel. The boat must launch and recover from Navy ships using various cranes and davits. Variants include configurations for LPD-17 class amphibious ships and an enhanced VBSS version. The document provides extensive requirements for boat performance, design, structure, systems, testing, and technical data package deliverables.

View the file

Other files

File Type Posted
Att 8 - DRAFT CLIN_ELIN Pricing.xls XLS spreadsheet
N00024-22-R-2224_Draft.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 - 11m RIB Mk4 Specification Rev - 17 March 2022 i

Attachment 1

UNITED STATES NAVY

11 METER RIGID INFLATABLE BOAT MK4

for FLEET FORCES COMMAND

SPECIFICATION

REV. -

17 March 2022 ii

REVISION HISTORY

Date Summary Of Change Hull Applicability

Version iii

TABLE OF CONTENTS

SECTION 0: GENERAL GUIDANCE AND ADMINISTRATION

040 INTRODUCTION AND GENERAL DESCRIPTION

040-1 BACKGROUND

040-2 VARIANTS

042 GENERAL ADMINISTRATIVE REQUIREMENTS

042-1 GENERAL REQUIREMENTS

042-2 DEFINITIONS

042-3 REFERENCED DOCUMENTS

042-4 ALTERNATE ITEMS

042-5 STATEMENT OF WORK (SOW)

042-6 CONTRACT DRAWINGS

042-7 ORDER OF PRECEDENCE

050 BOAT PERFORMANCE

050-1 BOAT PERFORMANCE

070 GENERAL REQUIREMENTS FOR DESIGN AND CONSTRUCTION

070-1 BOAT CHARACTERISTICS

070-2 ENVIRONMENTAL CONDITIONS

070-3 LOAD CONDITIONS

070-4 AMERICAN BOAT AND YACHT COUNCIL (ABYC) STANDARDS

070-5 ALTERATIONS TO EQUIPMENT OF COMPONENTS

070-6 SEAKEEPING, DYNAMIC STABILITY, AND MANEUVERABILITY

070-7 INSTALLATION OF EQUIPMENT, MACHINERY, AND MATERIALS

070-8 TOLERANCES

071 ACCESS

071-1 GENERAL ACCESSIBILITY

071-2 BILGE ACCESS

073 NOISE, VIBRATION, AND RESILIENT MOUNTINGS

073-1 NOISE LEVELS

073-1 MECHANICAL VIBRATION

074 WELDING AND ALLIED PROCESSES

074-1 GENERAL

074-2 VISUAL INSPECTIONS

074-3 DYE PENETRANT INSPECTION (PT)

075 FASTENERS

078 MATERIALS AND CORROSION CONTROL

078-1 GENERAL

078-2 METAL MATERIALS

078-3 FABRIC MATERIAL

078-4 FRP MATERIALS

078-5 BEDDING COMPOUND

078-6 STRUCTURAL ADHESIVE

078-7 NON-BIODEGRADABLE MATERIALS

078-8 CORROSION CONTROL

078-9 DISSIMILAR METALS

iv

084 TRANSPORTATION AND HANDLING

084-1 APPLICABLE TRANSPORT MODES

084-2 MARINE TRANSPORT, LAUNCH AND RECOVERY

084-3 BOAT TIEDOWN FITTINGS

084-4 TIEDOWN STRAPS

084-5 TRAILER

085 TECHNICAL DATA PACKAGE (TDP)

085-1 AS-BUILT DRAWINGS

085-2 COTS TECHNICAL MANUALS

085-3 OEM CERTIFICATIONS

085-4 OEM WARRANTIES BOOKLET

085-5 TESTS AND TRIALS REPORTS

085-6 ECSC DOCUMENTATION

085-7 TRAILER TITLE

085-8 MDI

092 TESTING

092-1 GENERAL

092-2 TEST CERTIFICATIONS

094 TRIALS

094-1 BT

094-2 PDIT

094-3 STEERING AND MANEUVERING TRIALS

096 WEIGHT

096-1 WEIGHT ESTIMATES AND REPORTS

096-2 DETERMINATION OF WEIGHTS

096-3 QC WEIGHING

099 PHOTOGRAPHS

099-1 PHOTOGRAPHS

SECTION 1: HULL STRUCTURE

100 GENERAL REQUIREMENTS FOR HULL STRUCTURE

100-1 DEFINITIONS

100-2 GENERAL REQUIREMENTS FOR STRUCTURE

100-3 MOLD REQUIREMENTS

100-4 LAMINATE REQUIREMENTS

100-5 HIGH STRENGTH ATTACHMENTS

100-6 FOUNDATIONS

100-7 PRECONSTRUCTION TEST PANELS

100-8 INSPECTIONS

100-9 HULL SAMPLES

100-10 LAMINATE REPAIRS

130 HULL DECKS

130-1 DECK

130-2 DECK DRAINS

150 CONSOLE

166 COLLAR

166-1 COLLAR

v

166-2 COLLAR TESTS

167 DOORS AND HATCHES

169 SPECIAL PURPOSE CLOSURES AND STRUCTURES

169-1 SWIM PLATFORM

169-2 AFT DECK CANOPY ASSEMBLY

171 MASTS, TOWERS, TETRAPODS

171-1 ARCH ASSEMBLY

SECTION 2: PROPULSION

200 GENERAL REQUIREMENTS FOR PROPULSION PLANT

200-1 PROPULSION PLANT

200-2 ARRANGEMENT OF MACHINERY

233 INBOARD ENGINES

233-1A INBOARD DIESEL (OCC VARIANT, LPD-17 VARIANT)

233-1B INBOARD DIESEL (EVBSS VARIANT)

233-2 KEYLESS START SWITCH

241 PROPULSION REDUCTION GEARS

241-1 MARINE GEAR

243 PROPULSION SHAFTING

243-1 FRP DRIVE SHAFT

247 WATERJET PROPULSORS

247-1 WATERJET PROPULSION

252 PROPULSION CONTROL SYSTEM

252-1 PROPULSION INSTRUMENT MARINE PACKAGE

252-2 PROPULSION CONTROLS AND CABLES

256 COOLING SEAWATER SYSTEM

256-1 SEAWATER SUPPLY

256-2 MAIN ENGINE AUXILIARY FRESH WATER RUN AND FLUSH CONNECTION

259 EXHAUST SYSTEM

262 MAIN PROPULSION LUBE OIL SYSTEM

262-1 ELECTRIC FAST LUBE OIL CHANGE SYSTEM (FLOCS)

SECTION 3: ELECTRIC PLANT

300 GENERAL REQUIREMENTS FOR ELECTRIC PLANT

300-1 SUITABLE FOR MARINE ENVIRONMENT

300-2 PANEL COVERS

300-3 LIGHTNING PROTECTION

300-4 SWITCHES

300-5 BONDING SYSTEM

300-6 ENCLOSURES

300-7 TERMINAL STRIPS

303 PROTECTIVE DEVICES

303-1 DC OVERCURRENT PROTECTION

vi

303-2 AC OVERCURRENT PROTECTION

304 ELECTRICAL CABLE, WIRING, AND CONNECTIONS

304-1 WATERTIGHT CONNECTIONS

304-2 CABLE SUPPORTS

304-3 MARINE MULTI-CONDUCTOR CABLE

304-4 ELECTRICAL CONNECTIONS

304-5 WEATHERPROOFED CONNECTORS

304-6 WATERTIGHT CABLE PENETRATIONS

304-7 CABLEWAYS

313 BATTERIES

313-1 BATTERIES

313-2 BATTERY CHARGING (24 VDC ALTERNATORS)

313-3 BATTERY VOLTMETER

313-4 SHORE POWER BATTERY CHARGER (120 VAC TO 24 VDC)

320 POWER DISTRIBUTION SYSTEMS

320-1 DC POWER DISTRIBUTION SYSTEM

320-2 AC POWER DISTRIBUTION SYSTEM

320-3 SHORE POWER SYSTEM (120 VAC/60 HZ)

320-4 OUTLETS (12 VDC)

320-5 OUTLETS (120 VAC)

324 PANELS

324-1 ELECTRICAL CIRCUIT BREAKER PANELS

330 LIGHTING

330-1 ELECTRONIC DIMMER

330-2 OVERHEAD LED LIGHTING

330-3 LAW ENFORCEMENT LIGHT

330-4 HANDHELD SEARCHLIGHT

SECTION 4: COMMAND AND CONTROL

400 GENERAL REQUIREMENTS FOR COMMAND AND CONTROL

405 ANTENNA REQUIREMENTS

405-1 ANTENNA INSTALLATIONS

405-2 ANTENNA RESERVATIONS

415 DIGITAL DATA COMMUNICATIONS

415-1 NMEA 2000 BUS

421 NON-ELECTRICAL NAVIGATION AIDS

421-1 MAGNETIC COMPASS

422 ELECTRICAL NAVIGATION AIDS

422-1 NAVIGATION LIGHTS

422-2 INTEGRATED ELECTRONIC NAVIGATION SYSTEM

430 INTERIOR COMMUNICATIONS

430-1 VEHICLE INTERCOM (VIC-5) RESERVATIONS

441 RADIO SYSTEMS

441-1 VHF RADIO

vii

441-2 DROP-IN COMMUNICATIONS PACKAGE (DICP)

441-3 SAR COMMUNICATION OUTLET

443 VISUAL AND AUDIBLE COMMUNICATION SYSTEMS

443-1 NAVIGATION HORN

443-2 LAW ENFORCEMENT HAILER/SIREN SYSTEM

455 IDENTIFICATIONS SYSTEMS

455-1 MOBI

SECTION 5: AUXILIARY SYSTEMS

500 GENERAL REQUIREMENTS FOR AUXILIARY SYSTEMS

505 GENERAL REQUIREMENTS FOR FLUID SYSTEMS

505-1 FLUID SYSTEMS CONNECTIONS

505-2 THROUGH-HULL FITTINGS AND VALVES

505-3 HOSES

505-4 HOSE INSTALLATION

505-5 HOSE CLAMPS

512 HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)

512-1 ENGINE COMPARTMENT VENTILATION

529 BILGE DRAINAGE SYSTEM

529-1 PORTABLE MANUAL BILGE PUMP

529-2 ELECTRIC BILGE PUMP

529-3 HULL DRAINS, BILGE WATER OVERBOARD DISCHARGE (BWOD)

541 FUEL SYSTEM

541-1 FUEL TANK (NON-INTEGRAL)

541-2 FUEL SOUNDING

541-3 FUEL LEVEL GAUGE

541-4 FUEL VALVES

541-5 REMOTE FUEL SHUTOFF

541-6 FUEL-WATER SEPARATOR AND FILTER

541-7 FUEL STRIPPING SYSTEM

541-8 FUEL MANAGEMENT SYSTEM

555 FIREFIGHTING

555-1 PORTABLE FIRE EXTINGUISHERS

555-2 ENGINE COMPARTMENT FIXED, CLEAN AGENT FIRE SUPPRESSION SYSTEM

561 STEERING CONTROL SYSTEMS

561-1 MANUAL HYDRAULIC STEERING SYSTEM

561-2 EMERGENCY STEERING SYSTEM

565 TRIM AND HEEL CONTROL SYSTEMS

565-1 TRIM TABS

581 ANCHOR HANDLING

581-1 FORTRESS ANCHOR

582 MOORING AND TOWING

582-1 FORWARD AND AFT TOWING BITTS

582-2 BOW EYE

viii

582-3 CLEATS

SECTION 6: OUTFIT AND FURNISHINGS

600 OUTFIT

600-1 BOAT HOOK

600-2 RING BUOY

600-3 U.S. ENSIGN

600-4 MOORING LINES

600-5 COLLAR PUMP

600-6 COLLAR REPAIR KIT

600-7 CONSOLE COVER

602 LABELING

602-1 HRN

602-2 LABEL PLATES (GENERAL)

602-3 PIPING SYSTEM LABEL PLATES

602-4 VALVE LABEL PLATES

602-5 INSTRUCTION LABEL PLATES

602-6 HOISTING LABEL PLATES

602-7 BOAT INFORMATION LABEL PLATE

602-8 BOAT ALTERATION LABEL PLATE

602-9 IN-SERVICE LABEL PLATE

602-10 SYSTEMS LABEL PLATES

602-11 STOWAGE LABEL PLATES

602-12 UNIQUE ITEM IDENTIFICATION (UID)

602-13 POTENTIAL NOISE HAZARD SIGNS

611 HULL FITTINGS

611-1 DECK CARGO TIEDOWNS

611-2 SINGLE POINT HOISTING FITTINGS

611-3 SINGLE POINT HOISTING SLING

611-4 TWO POINT HOISTING FITTINGS AND SLINGS

611-5 HOISTING HARDWARE

611-6 LPD-17 CLASS SINGLE POINT LIFT FRAME (LPD-17 AND EVBSS VARIANTS)

630 PRESERVATIVES AND COVERINGS

630-1 PAINT AND GEL COAT

630-2 STAINLESS STEEL TREATMENT

630-3 ANODES

630-4 EXTERIOR NON-SKID

662 WORKING SPACES AND SEATING

662-1 ERGONOMICS

662-2 SEATING - AFT OF CONSOLE (CREW AND PASSENGERS)

662-3 SEATING - FORWARD OF CONSOLE (PASSENGERS)

670 STOWAGE SPACES

670-1 STOWAGE (GENERAL)

670-2 STOWAGE COMPARTMENT

670-3 REMOVABLE DECK STORAGE BOX

SECTION 7: ARMAMENT

700 ARMAMENT

700-1 MACHINE GUN FOUNDATIONS

ix

700-2 READY SERVICE AMMUNITION STORAGE

SECTION 0: GENERAL GUIDANCE AND ADMINISTRATION

040 INTRODUCTION AND GENERAL DESCRIPTION

040-1 Background

The 11 meter Rigid Inflatable Boat (11m RIB) is a multi-purpose platform with several distinct missions. The terrorist attacks on the USS COLE (12 October 2000) and on multiple United States (U.S.) homeland targets (11 September 2001) added multiple missions to the traditional functions of a U.S. Navy boat. The current missions for the 11m RIB include:

Anti-terrorism/Force Protection (AT/FP)

Maritime Interdiction Operations (MIO)

Visit, Board, Search and Seizure (VBSS)

Safety Boat / Escort

Tow and Recovery Boat

Personnel and Cargo Transfer

The ability to be carried aboard and deployed from a variety of U.S. Navy ship classes is a critical operational requirement for U.S. Navy 11m RIBs. For the boats to be deployable from multiple ship classes, each boat must be compatible with a variety of existing shipboard handling and stowage systems including traditional davits and stowage chocks, and a variety of ship class specific launch, recovery, and handling systems.

A variant of the 11m RIB configured with a lifting frame and Cranston Eagle hook for interface to the Positive Control Derrick Head (PCDH) on a knuckle-boom crane and Caley davit docking head is used onboard the LPD-17 Class ships.

A variant of the 11m RIB referred to herein as the Enhanced VBSS (EVBSS) variant incorporates increased AT/FP, MIO, and VBSS capabilities. This variant uses the 11m RIB LPD-17 configuration as a baseline with increased engine horsepower to meet higher cruise and sprint speed requirements.

The 11m RIB platform entered service with the U.S. Navy in the early 2000s. Since then sequential Mk numbers designate major changes to the 11m RIB configuration. This Specification refers to the 4th version of this boat, the 11m RIB Mk4.

040-2 Variants

Three variants are described in this Specification: the base Open Center Console (OCC) variant, the LPD-17 variant, and the EVBSS variant. Unless the variant is identified, the Specification sections and Contract Drawings shall apply to all variants. Throughout the Specification and Contract Drawings, the variants shall be referred to as:

OCC

LPD-17

EVBSS

The below table summarizes the differences amongst the variants throughout this Specification.

Elsewhere, commonality between the variants shall be maintained in other respects as much as practicable.

Section # Description OCC Variant LPD-17 Variant EVBSS Variant

070-4 Load Conditions: Payload 26 people @ 185 lbs each

26 people @ 185 lbs each

4 crew @ 185 lbs each, 12 EVBSS team @ 285 lbs each

233-1 Engine HP rating 380 HP 380 HP 480 HP

611-6 LPD-17 Single Point Lift Frame

Not Required Required Required

042 GENERAL ADMINISTRATIVE REQUIREMENTS

042-1 General Requirements

This Specification describes the general requirements of the 11m RIB Mk4 (also referred to herein as “the boat”) and describes the essential features, functions, and arrangements but not necessarily the details of the design. Together with the Contract Drawings, it defines the boat as to dimensions, structure, arrangement, systems, performance, and power.

With respect to components, this Specification in conjunction with the Contract Drawings indicates the quantity of each major component required, together with such data as size, capacity, rating or power, and applicable specifications and standards or other technical requirements, which will enable the Contractor to procure or build the component.

With respect to systems, this Specification, in conjunction with the Contract Drawings, defines the characteristics of each system to be provided. It contains additional data such as capacity of the systems under various conditions and the flexibility and segregation requirements, which will enable the Contractor to prepare construction drawings and build the systems.

With respect to materials of construction and items of machinery, equipment, and outfit, which by their nature may be manufactured or procured as distinct items; this Specification contains only the requirements and information that pertain to selection, installation, onboard performance, onboard inspection and tests, pre-installation handling, inspection and tests by the Contractor. Requirements such as physical or chemical properties, manufacturer test and inspection requirements, or other requirements applicable only to manufacturers, are contained in specifications or standards, drawings, or in other documents referenced herein.

The Contractor is responsible for carefully and critically reviewing the Contract Drawings and this Specification prior to commencing the engineering design effort. If the Contractor finds any error, omission, discrepancy, or lack of clarity, he shall notify the Government’s Contracting Officer, in writing, not less than 15 days before commencing any work affected thereby, and request approval from the Government of the Contractor's resolution of the problem.

042-2 Definitions

Accessible: capable of being reached for inspection, removal, or maintenance without the removal of permanent boat structure.

Contractor: The Prime Contractor awarded the contract for design and construction of the Boat.

Contract Drawing: a Government furnished drawing forming part of the Specification, which illustrates features of the boat that are mandatory requirements.

Craft, Boat, or Vessel: Synonymous terms for the 11m RIB Mk4.

Cruise Speed: Most fuel efficient planing speed greater than 25 knots (kts).

Deep water: a water depth of 0.8 times Length Overall or greater.

Government: The United States Government.

Government Representative: The Contract Administration Office or other designated representative specified in the contract. Where such terms as “as approved”, “for approval”, “as directed”, and “for review” are used without further qualification, the approval, direction, decision, or review of the Government Representative is intended.

Herein: Refers to this Specification (including any attachments), the Statement of Work, and the Contract. (e.g., a requirement that includes the qualifying statement “unless otherwise stated herein” refers to these Specifications, Contract Drawings, the Statement of Work, and the Contract).

NAVSEA: The Headquarters of the Naval Sea Systems Command. (NAVSEA was formerly NAVSHIPS. Documents referred to herein as NAVSHIPS or NAVSEA are under the cognizance of NAVSEA).

Readily Accessible: capable of being reached quickly and safely for effective use under emergency conditions without the use of tools.

Significant Wave Height: the average wave height (measured from trough to crest) of the highest 1/3 of waves present.

Sprint Speed: Boat speed at 100% throttle setting (maximum engine RPM).

042-3 Referenced Documents

The following standards and specifications are referenced in this Specification. Where reference is made to a voluntary compliance or best practice standard, the recommended standards and practices shall be considered mandatory under this Contract. Where the issue or revision of referenced documents is not specified herein, the issue in effect on the date of issuance of the Request for Proposal (RFP) shall apply. Use of other issues of these documents shall require Government approval.

46 CFR Part 111, Electric Systems

46 CFR Part 160, Lifesaving Equipment

46 CFR Part 180.70, Ring Life Buoys

49 CFR Part 393, Parts and Accessories Necessary for Safe Operation

49 CFR Part 571, Federal Motor Vehicles Safety Standards

A-A-59125 Rev B, Terminal Boards, Molded, Barriers, Screw, and Stud Types

ABYC, Standards and Technical Information Reports for Small Craft

ANSI/ASME B46.1, Surface Texture (Surface Roughness, Waviness, and Lay)

ASME Y14.100, Engineering Drawing Packages

ASTM B928, Standard Specification for High Magnesium Aluminum-Alloy Sheet and Plate for Marine Service and Similar Environments

ASTM D2344, Standard Test Method for Short-Beam Strength of Polymer Matrix Composite Materials and Their Laminates

ASTM D2584, Standard Test Method for Ignition Loss of Cured Reinforced Resins

ASTM D2734, Standard Test Methods for Void Content of Reinforced Plastics

ASTM D638, Standard Test Method for Tensile Properties of Plastics

ASTM D7264, Standard Test Method for Flexural Properties of Polymer Matrix Composite Materials

ASTM D7291, Standard Test Method for Through-Thickness “Flatwise” Tensile Strength and Elastic Modulus of a Fiber-Reinforced Polymer Matrix Composite Material

ASTM F593, Standard Specification for Stainless Steel Bolts, Hex Cap Screws, and Studs

ASTM F594, Standard Specification for Stainless Steel Nuts

ASTM F1166, Standard Practice for Human Engineering Design for Marine Systems, Equipment, and Facilities

FED-STD-595, Colors Used in Government Procurement

IEC Standard 60529 IP, Degrees of Protection Provided by Enclosures (IP Code), IEEE 45, Recommended Practice for Electric Installations on Shipboard

IEEE 1580, Recommended Practice for Marine Cable for Use on Shipboard and Fixed or Floating Facilities

International Regulations for Preventing Collision at Sea, 1972 (72 COLREGS) For the purposes of this specification, the U.S. Coast Guard Navigation Rules and Regulations Handbook (available at http://www.navcen.uscg.gov/?pageName=navRuleChanges) shall be interpreted as representing the requirements of the International Regulations for Preventing Collision at Sea, 1972 (72 COLREGS).

MIL-STD-209K, Interface Standard for Lifting and Tiedown Provisions

MIL-STD-2003-1A(SH) Electrical Plant Installation Standard Methods for Surface Ships and Submarines

MIL-STD-2035, Department Of Defense Test Method: Nondestructive Testing Acceptance Criteria

MIL-STD-3950 Switches, Toggles, Environmentally Sealed

NAVSEA T9008-B4-MAN-010, Inspection and Repair Manual for Fiber Reinforced Plastic Boats and Craft

NAVSEA T9074-AS-GIB-010/271, Requirements for Nondestructive Testing Methods

NAVSEA DWG 602-5109421, Boat Contact Information Label Plate for All U.S. Navy Boats and Craft

NAVSEA DWG 699-5111767, Lifeline and Personnel Seat Modifications

NAVSEA TO300-AU-SPN-010, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls, NSWCCD-23-TM-2009/58 Rev B, U.S. Navy Boat Electrical Practices

NSWCCD-23-TM-2009/61 Rev A, U.S. Navy Boat Example Data Package

NSWCCD-23-TM-2011/05, U.S. Navy Craft Mechanical Practices

NSWCCD-80-TR-2014/038, Weight Management Process Guidance for Boats and Craft

NSWCCD-83-TM-2020/10, Essential Cybersecurity Components (ECSC) Data Collection and Documentation

RR-C-271F, Chains and Attachments, Carbon and Alloy Steel

SAE J1273, Recommended Practices for Hydraulic Hose Assemblies

SAE J1508, Hose Clamp Specifications

SAE J1527, Marine Fuel Hoses

SAE J1942, Hose and Hose Assemblies for Marine Applications

SAE J2006, Marine Exhaust Hose

UL 489, Molded-Case Circuit Breakers, Molded-Case Switches, and Circuit Breaker Enclosures

UL1426, Standard for Electrical Cables for Boats

WSTDA-T-1, Recommended Standard Specification for Synthetic Web Tie Downs

042-4 Alternate Items

Where boat components and equipment are specified by brand name or manufacturer and model number and followed by “or equal”, such identification is intended to be descriptive, not restrictive, and is intended to indicate the required characteristics of the product. The Contractor may propose the use of other products which are equal to the specified make and model products. The following general requirements shall form the basis for determining the equality of alternate products unless additional specific or alternate requirements are designated within the applicable sections of this Specification.

a. The major attributes of form, fit, function, interface, and material of an alternate item shall not degrade the performance of the system within which it is used, nor the boat as a whole.

The alternate item shall require no more space or volume than the designated item for installation, operation, or maintenance. The alternate item shall weigh no more than the designated item. The connection fittings required to incorporate the alternate item into a system shall be identical to those necessary to incorporate the specified item. The principles of operation of the alternate item shall be the same as those of the designated item (i.e., hydraulic cylinders shall not be used in lieu of springs, etc.). Input power, capacity, and other operating requirements for the alternate item shall be no greater than those required by the designated item. Output power, capacity, and other performance parameters of the alternate item shall be no less than those required for the designated item and not so much greater than those of the designated item as to require an increased capacity of the system within which the item is installed.

b. The materials of construction of the alternate item shall be the same as those of the designated item unless the Contractor can demonstrate to the Government that the proposed alternate material will not adversely affect performance or service life of the item, the system within which it is installed, or the boat as a whole.

c. The reliability and maintainability of an alternate item shall be equal to or better than the specified item. The Contractor shall provide evidence of the equality of the reliability and maintainability of the alternate item to the specified item. This evidence may include such things as results of testing, service histories, documentation of successful use in similar applications, planned maintenance requirements, etc. Where the reliability and maintainability of the specified item has been established by testing, the Government may require that the alternate item undergo similar testing to demonstrate its reliability and maintainability. Such testing, if required, shall be at the Contractor's expense.

d. An alternate item shall conform to the same industry or Government specifications or standards as the specified item. Where a specified item has been approved or certified by a regulatory or testing agency, such as USCG or Underwriters' Laboratories, the alternate item shall also be approved or certified. The cost of demonstrating compliance with specifications or standards, or of obtaining approval or certification, shall be borne by the Contractor.

e. If the specified item is one with established Government logistic support, any alternative item shall have equivalent logistic support. If equivalent logistic support has not been established for the alternate item, the Contractor shall bear the expense of establishing equivalent support. Logistic support shall include, as applicable: maintenance planning and analysis; training and training support, including training equipment, curricula, and instruction materials; supply support; support equipment such as special tools and test equipment; technical documentation including technical manuals, Product Technical Description (PTD), Planned Maintenance System (PMS), Technical Repair Standards (TRS), and software documentation; computer resource support; facilities for maintenance and training; unique packaging, handling, storage, and transportation requirements; and human engineering considerations.

The Government will not accept alternative items for the brand name or manufacturer and model specified for the following items:

Trailer (Section 084)

Diesel Engines (Section 233)

Vibration Isolators (Section 233)

Marine Gear (Section 241)

Waterjets (Section 247)

Controls (Section 252)

FLOCS (Section 262)

Batteries (Section 313)

Law Enforcement Light (Section 330)

Navigation Lights (Section 422)

Electronic Navigation Package (Section 422)

Man Overboard Indicator (MOBI) (Section 455)

Electric Bilge Pump (Section 529)

Lift Frame Hook (Section 611)

Where manufacturer's type, model, or other commercial designation is referred to herein, the characteristics in effect on the date of these specifications shall apply. Where model numbers or other commercial designations have been superseded since the date of these specifications, new model numbers or designations may be utilized provided the equipment characteristics associated with the new designation are the same as those associated with the superseded designation.

042-5 Statement of Work (SOW)

This Specification is written to be used in conjunction with the SOW. Additional requirements such as warranty, packaging, delivery, training, etc. are defined in the SOW.

042-6 Contract Drawings

The following Contract Drawings form a part of this Specification. Hereinafter, wherever a reference is made to "the drawings" without further identification, it shall be understood to apply to the following listed Contract Drawings.

CONTRACT DRAWINGS

Drawing Title NAVSEA Drawing Number Revision

Hull Lines and Offsets 53711-11MRB-100-5111321 B

Deck Lines and Offsets 53711-11MRB-100-5111322 B

Outboard Arrangement 53711-11MRB-100-5111323 A

General Arrangement 53711-11MRB-100-5111324 A

Hull Construction Arrangement and Details 53711-11MRB-100-5111325 B

Deck Construction Arrangement and Details 53711-11MRB-100-5111326 A

Machinery Arrangement and Details 53711-11MRB-200-5111327 A

Electrical Systems 53711-11MRB-300-5111328 C

Piping System Diagrams 53711-11MRB-500-5111329 A

Miscellaneous Details 53711-11MRB-600-5111330 B

Hoisting Arrangement and Details 53711-11MRB-600-5111331 A

CONTRACT DRAWING CHANGES THROUGHOUT CONTRACT

No. Drawing No. Location Description of Change Hull

Applicability

1.

In the development of as-built drawings or construction of the boat by the Contractor, no departure from Contract Drawings is permitted unless such departure is specifically approved by the Government. The Contractor shall be responsible for developing all additional details necessary for the construction of the boat and correcting any and all interferences that may arise during development of as-built drawings or construction of the boat. Quantities given on Contract Drawings are for estimating purposes only; the Contractor is required to ascertain the exact quantities required. Reference dimensions are approximate and the Contractor is required to verify those dimensions by the use of lofting techniques, templates, etc.

A piping diagram is a Contract Drawing used to depict features, routing, functional relationships, relative locations, and nominal arrangements of the major components forming a fluid system without regard to actual physical size, shape or precise location of components.

A schematic or wiring diagram is a Contract Drawing used to depict features, routing, functional relationships, relative locations, and nominal arrangements of the major components forming an electrical system without regard to actual physical size, shape or precise location of components.

In the development of as-built drawings or construction of the boat, the Contractor shall complete details for the electrical system not depicted on the Contract Drawing such as but not limited to:

terminal boards, junction boxes, connectors, splices, and systems described in this Specification but not included in the Contract Drawing.

042-7 Order of Precedence

In case of inconsistency between the requirements of the Contract, this Specification, and the documents referenced in this Specification, the following order of precedence applies:

1. The Contract requirements,

2. This Specification requirements,

3. The Contract Drawings,

4. Other Government specifications and standards, industry standards, and similar referenced documents.

The following are not considered inconsistencies subject to an order of precedence determination:

a. Silence of one document with respect to details shown in another.

b. Broad boat requirements compared to detailed system or component requirements.

050 BOAT PERFORMANCE

050-1 Boat Performance

The following performance is anticipated in calm, deep water, Full Load condition:

OCC and LPD-17 variants:

o Sprint Speed (at 3,000 engine RPM): 32 kts, o Cruise Speed (at 2,800 engine RPM): 27 kts, o Acceleration: 0 to 25 kts in 16 seconds, o Range: 230 nautical miles at cruise speed.

EVBSS variant:

o Sprint Speed (at 3,300 engine RPM): 40 kts, o Cruise Speed (at 3,000 engine RPM): 33 kts, o Acceleration: 0 to 25 kts in 12 seconds, o Range: 230 nautical miles at cruise speed.

070 GENERAL REQUIREMENTS FOR DESIGN AND CONSTRUCTION

070-1 Boat Characteristics

Length Overall (LOA): 38.2 feet (ft)

Beam Overall (BOA): 12.0 ft

Chine Beam: 8.7 ft

Deadrise: 20 degrees at transom (variable)

Total Installed Fuel Capacity: 280 gallons

Design Hoisting Weight (maximum): 17,640 lbs (8,000 kg)

Design Full Load Weight (maximum): 21,400 lbs

Design Draft: 2.3 ft at Full Load

Capacity (including crew): 26 persons

070-2 Environmental Conditions

The boat shall be capable of operating in ambient air temperatures between 0o F and 125o F and water temperatures between 28o F and 95o F.

Exterior materials shall be capable of withstanding ambient temperatures up to 150o F during full exposure to ultraviolet (UV) rays when stowed onboard ships or in open stowage areas.

The boat shall be capable of full operation in up to Sea State 3 on the Marks scale (4.6 foot significant wave height).

The boat shall survive conditions up to Sea State 5 on the Marks scale (12 foot significant wave height) at minimum headway speed and best heading.

070-3 Load Conditions

The following load conditions are defined for reference throughout this Specification for the OCC, LPD-17, and EVBSS Variants. These definitions apply to the engineering design values for weight and moments of the boat in the described condition. Weight Management Process Guidance for Boats and Craft, NSWCCD-80-TR-2014/038 may be used for guidance.

Service Life Allowance (SLA): The SLA shall be 800 lbs at the Center of Gravity.

The SLA for the LPD-17 and EVBSS variants shall be reduced by the weight of the single point lift frame (including permanent mounting brackets and hardware, removable lift frame structure, and Cranston Eagle hook; see Section 611).

Payload (OCC and LPD-17 Variants): The boat shall support 4,870 lbs total payload.

The notional breakdown of payload is 26 personnel at 185 lbs each (including crew) and the 60 lbs 4-leg sling set. Guns, ammunition, or other mission gear, when carried, will be considered part of the defined payload weight.

Payload (EVBSS Variant): The boat shall support 4,220 lbs total payload. The notional breakdown of payload is 12 EVBSS personnel at 285 lbs each, 4 crew at 185 lbs each, and the 60 lbs 4-leg sling set. Guns, ammunition, or other mission gear except DICP, when carried, will be considered part of the defined payload weight.

Light Ship: The boat complete in all respects including outfit (defined in Section 670), and ready for service with liquids in machinery at operating levels but no personnel, fuel, or other variable loads. Each variant will have a different Light Ship weight. Add an allowance for the DICP (255 lbs) for the EVBSS variant.

Boat Scale Weight Condition: Light Ship plus full fuel. If the boat is weighed without full fuel, the fuel weight shall be added using a density of 7.1 lbs/gallon.

Full Load Condition: Light Ship plus full fuel, Payload, and SLA.

Builder’s Trials (BT) Load Condition: Light Ship plus full fuel, and 4 people @ 200 lbs each.

Pre Delivery Inspection Trials (PDIT) Load Conditions:

o Full Load Condition and o BT Load Condition

Boat Over-the-Road (OTR): Light Ship plus full fuel and SLA.

Trailer Curb Weight: Trailer complete in all respects, including all tools on trailer, OTR tie-down straps, and miscellaneous material required for OTR transport (e.g. boat covers, tie-down strap chafe protection, etc.).

Gross Vehicle Weight (GVW): Boat OTR plus Trailer Curb weight.

Boat Design Hoisting (at sea): Light Ship plus full fuel plus SLA plus 6 people @ 185 lbs each. The actual (as-weighed) Boat Hoisting weight shall not exceed 17,640 lbs (8,000 kg).

Trailer Design Hoisting: Trailer Curb weight.

Combined Boat and Trailer Design Hoisting (logistical lift): Boat OTR plus Trailer Curb weight.

070-4 American Boat and Yacht Council (ABYC) Standards

Unless otherwise defined, the boat shall meet ABYC standards and recommended practices.

070-5 Alterations to Equipment of Components

Alterations to Original Equipment Manufacturers’ (OEM) products by the Contractor or distributers are strongly discouraged. If alterations are necessary, documentation of the change shall be submitted for Government approval and shall be provided with the Technical Data Package

(TDP).

070-6 Seakeeping, Dynamic Stability, and Maneuverability

The boat shall be safe and controllable at all speeds and under all loading conditions specified herein. Safe and controllable includes operation where boat orientation, motions, and accelerations do not pose a hazard to the crew or passengers that is not otherwise controllable by good seamanship and boat handling.

The boat shall be dynamically stable (oscillatory and nonoscillatory) at all operational loading conditions and speeds.

See Section 094 for trials requirements.

070-7 Installation of Equipment, Machinery, and Materials

All equipment and materials shall be new. Systems and components shall be selected for durability, longevity, safety, and ruggedness. Components shall be selected to maximize the use of Commercial-off-the-shelf (COTS) products and commonality between hulls. Systems and components shall be installed with proper tools.

Unless otherwise specified, OEM recommendations for design and installation of their products into the boat shall be followed.

Connecting piping and wiring shall be run to minimize exposure to weather. Bulkhead and deck penetrations shall be as close as practicable to the equipment being served, preferably by direct connection through the adjacent deck or bulkhead.

All systems should be free from leaks and safety hazards.

Equipment, components, wiring and piping shall be supported clear of the bilge to the maximum extent practicable.

All piping shall be cleaned to a degree of cleanliness that results in a surface that is reasonably free of contamination and any remaining residue on the surface does not interfere with system operation or damage system components.

Foundations and brackets for equipment shall be configured to provide access for cleaning, painting, preservation, maintenance, and to prevent accumulation of water, dirt, and foreign material.

Protection of personnel against operating hazards shall be provided. Shafting, couplings, gears, flexible shafts, and similar items shall have adequate guards installed for protection of personnel.

Such protective guards shall be removable without dismantling the machinery surrounded. Guards shall be as light as is consistent with required protection and strength. Guards shall be of sufficient strength to be used as steps or hand holds if located where such use may be anticipated.

Protective guards or insulation shall be installed to prevent contact with equipment where surface temperatures exceed 200 oF. If surfaces exceed 140°F in the proximity of controls or manual actuators requiring manipulation by personnel during normal operation, protective guards or insulation shall be installed to prevent contact. For other surfaces exceeding 140°F, caution signs shall be installed.

Electrical equipment shall have non-conductive guards, screens, protective barriers or be insulated to protect personnel from contacting hazardous voltages or exposed terminals. Male plug and receptacle connectors shall be wired to the load side of the circuit to ensure that no voltage is present when not connected.

Equipment shall be protected against the hazard of personnel brushing against or being thrown against the equipment, particularly under heavy sea conditions, and inadvertently causing damage to exposed components or resulting in maladjustment of exposed functional controls such as push buttons, knobs, and switches. Protection shall be provided by equipment arrangement or design or by installation of enclosures, screens, or guard rails. All sharp edges exposed to personnel shall be dressed, ground or radiused to avoid injury to personnel.

070-8 Tolerances

Where tolerances are not otherwise indicated by specific dimensions on the drawings the following tolerances shall apply:

1. Dimensions given decimally:

in inches (inch-pound);

.X - ±0.06 inch .XX - ±0.03 inch .XXX - ±0.005 inch

2. Dimensions given in inches and fractions:

linear - ± 1/16 diameters, other than bolt holes, ± 1/16 radii - ± 1/16

3. Dimensions given in feet and whole inches - ±1/8 inch

4. Angles:

Whole degrees - ±1/2 degree Degrees and minutes - ±5 minutes

The tolerances shall apply to all fabrication performed from the Contract Drawings and the Contractor developed as-built drawings, except where deviation to either relax or tighten the tolerance is noted on the drawings or required elsewhere in this Specification.

071 ACCESS

071-1 General Accessibility

Electrical and mechanical components shall be accessible for maintenance and repair. All items requiring operation or maintenance (e.g. switches, valves, filters, strainers, seacocks, etc.) shall be readily accessible while in shipboard stowage, at the dock, or underway. Stowage and securing of arches, antennas, masts or other items shall not prevent access to critical items such as battery switches, fuel shut off valves or other items that need to be checked, secured or operated for any of the required transport modes.

Permanent fittings and structure shall be kept clear of routes required for the removal of machinery and equipment. The space behind equipment may be inaccessible after installation; this factor shall be considered in providing proper preservation in way of such equipment and in selecting the location of pipes, ducts, wireways, and other permanent fittings behind such equipment. Nooks, cracks, and openings where water, dirt, dust, or foreign material can accumulate shall be avoided.

071-2 Bilge Access

All bilges and voids shall have removable plates or hatches for bilge access and inspection. The access and inspection openings shall be of sufficient size and locations to allow personnel visual access to the entire bilge and void areas. Components in the bilge that need to be regularly accessed such as bilge pumps, strainers, valves, etc. shall be readily accessible by hatches requiring no tools to open. Access panels, plates or hatches shall not compromise the rating of the deck in which they are installed.

073 NOISE, VIBRATION, AND RESILIENT MOUNTINGS

073-1 Noise Levels

If noise levels are 85 dBA or greater under any of the test conditions specified in Section 092, appropriate labels shall be provided on the boat advising personnel of the potential noise hazard and under what conditions it occurs (Section 602).

073-1 Mechanical Vibration

The boat and all boat components shall be free from excessive vibration. Vibration is excessive when it interferes, or threatens to interfere, with the proper operation of any boat component.

Any unsatisfactory conditions resulting from the excitation of a resonant frequency by any equipment shall be corrected by local stiffening of structure, installation of suitable mountings, modification of components, or other effective means. Means to prevent excessive vibration during normal boat operating conditions shall be incorporated in the construction of the boat.

Means shall be provided to prevent rattling of removable plates, ladders, gratings, and similar items.

Mounts for removable components and accessories subject to vibration, including items moved for towing or transport, shall be fitted with resilient material as necessary to prevent rattling.

074 WELDING AND ALLIED PROCESSES

074-1 General

Welder and weld procedure qualification, including the associated record keeping requirements, shall be in accordance with the American Society of Mechanical Engineers (ASME), the American Welding Society (AWS), or NAVSEA TO300-AU-SPN-010.

The Contractor shall select one of these welding codes and adhere to all requirements of the selected document for each welding procedure specification. The Contractor may select different regulating codes for different weld procedures; however, all documentation, welding and welder requirements for each procedure (e.g. the Welding Procedure Specifications (WPSs), the Procedure Qualification Records (PQRs) and the welder qualification and testing of the welds) must follow the same code.

All documentation pertaining to welder and weld procedure qualification shall be maintained by the Contractor, available for inspection by the Government.

If a subcontractor is used to fabricate custom built welded assemblies the Contractor shall include these requirements in the subcontracting agreement and be responsible for assuring they are fulfilled.

074-2 Visual Inspections

All welds shall be visually inspected.

Surfaces to be welded shall be cleaned to remove oil, grease, wax, oxide, scale, rust and other contaminants. In the case of aluminum, the oxide film shall be removed within 8 hours prior to welding. Fillet weld root openings shall not be greater than 1/16 inch.

Welds shall be free of slag, weld splatter, cracks, sharp irregularities, craters, and incomplete fusion.

The weld edge shall not form a reentrant angle with the base metal less than 90 degrees due to lack of fusion, undercut or excessive convexity.

Fillet welds dimensioned 3/8 inch or less shall not vary below the specified size by more than 1/16 inch for a total distance greater than 25% of the joint length. Fillet welds dimensioned 7/16 inch and larger shall not be less than the specified size. Fillet welds in excessive of the required dimensions shall be avoided; however, oversized welds will be acceptable provided they meet the contour requirements and do not interfere with proper operation of the boat or its components.

Undercut shall not reduce the base metal thickness by more than 1/32 inch.

Welds shall not exhibit porosity or worm holes in excess of two indications 1/16 inch or larger in any 6 inch length of weld, exclusive of weld crater porosity.

Grinding to correct the weld profile shall not reduce the base metal thickness by more than 1/32 inch.

074-3 Dye Penetrant Inspection (PT)

PT methods shall be in accordance with NAVSEA TO300-AU-SPN-010 requirements or similar standard with Government approval.

The forward and aft tow bitt/gun foundations, bow eye, lift frame and hoisting fittings are critical welded assemblies. Critical welded assemblies, in addition to visual inspection, shall be dye penetrant inspected prior to painting the assembly per Section 092 as follows:

1. Visually inspect completed critical welded assembly per Section 074-2 prior to installation on the boat. If passing, proceed to step 2.

2. Before load testing, PT welds and 1/2 inch of base metal on either side of the weld for linear indications greater than 1/16 inch. If passing, proceed to step 3. If assembly does not require painting, it may be installed on the boat vice a jig and proceed to step 6, then complete steps 7 and 8.

3. In a jig, pull test the assembly to the load required by Section 092.

4. After load testing, visually inspect assembly for signs of failure or permanent deformation AND PT welds and 1/2 inch of base metal on either side of the weld for linear indications greater than 1/16 inch. If passing, proceed to step 5.

5. Paint and install the assembly on the boat.

6. Perform load test on installed assembly as required by Section 092.

7. After load testing, visually inspect fittings and boat structure for signs of failure or permanent deformation.

8. Only if the assembly is unpainted and was installed on the boat directly after step 2, PT welds and 1/2 inch of base metal on either side of the weld for linear indications greater than 1/16 inch.

075 FASTENERS

Fasteners shall be type 316 stainless steel (UNS S31600). Fasteners used for structural applications shall be ASTM F593, Alloy Group 2 (type 316 stainless steel), Condition A or CW. Where required for high strength application (e.g. engine to drive shaft coupling), non-stainless steel, high strength fasteners with corrosion protection (e.g. paint, corrosion inhibitor, etc) may be used with Government approval and documented in the TDP as a maintenance item.

Component mounting shall be through-bolted with ASTM F594 (type 316 stainless steel) nylon insert lock nuts and flat washers wherever practicable to suit fastener reinstallation during maintenance and repair. Threaded fasteners shall fully engage nuts with thread protrusion.

Excessive thread protrusion that pose a personnel hazard shall be avoided.

Fasteners may be threaded into structural or non-structural materials only with Government approval.

Pins used for folding, removable, or stowable features shall be stainless steel and secured with a stainless steel lanyard to prevent loss. Pin handles may be aluminum.

Where fasteners are used in Fiber Reinforced Plastic (FRP) structure, the fastener threads shall be dipped in catalyzed resin at the time of installation.

All strength fittings on FRP hulls shall have backed and through-bolted connections.

Certain equipment installations may require other fasteners as specified by the OEM; these are acceptable provided they are installed according to OEM instruction.

078 MATERIALS AND CORROSION CONTROL

078-1 General

Materials referred to in this Specification without further identification shall comply with this section. Other materials, which are acceptable for use in specific applications, will be defined in the relevant Specification section or reference document that requires their use.

No plastic, polyvinyl chloride (PVC), chlorinated polyvinyl chloride (CPVC), or high-density polyethylene (HDPE) shall be used without explicit Government approval except OEM components (e.g. electric bilge pump, NEMA Boxes).

All materials shall be marine grade and resistant to corrosion. All materials normally subjected to sunlight shall be highly resistant to degradation caused by ultraviolet radiation.

Joining surfaces between mechanically fastened metal components and between metals and laminates shall be protected by the use of bedding compound.

078-2 Metal Materials

Aluminum (if used) shall be:

Sand cast: 3560 T6, Plate and sheet: 5086 H116 or 5086-H117 both ASTM B928, Extrusions: 5086-H111, Drawn tube: 5086-H32.

Non-structural components such as handrails, small component brackets and wire ways may include extruded 6061 material.

Stainless Steel (if used) shall be:

Cast for general applications: UNS J92800 or J92500; for non-welded applications UNS J92900 or J92600 may be substituted, Cast for underwater applications: UNS J92800; for non-welded applications UNS J92900 may be substituted, Plate, sheet, bars, shapes, tubing, pipe: UNS S31603; for non-welded applications UNS S31600 may be substituted.

078-3 Fabric Material

Fabric for covers, canopy and upholstery shall be marine grade as well as fade, stain and mildew resistant. The fabric color shall be as near a match as possible to haze gray, FED-STD-595 color 26270. Fabrics shall be easy to maintain, waterproof, and breathable where required. All seams, edges, grommets, fastening points and areas of chafe shall be reinforced. Venting is acceptable to ventilate covers, but must minimize or eliminate the intrusion of water. Seats, seat fabric and foam shall be durable, provide comfort and be flame retardant. Foam shall not retain or absorb water.

078-4 FRP Materials

Resin: Laminating resins shall be fire retardant vinylester. Laminating resin shall not be pigmented. Tinting of the catalyzing agents is desirable to ensure proper mixing.

Core: Cored structure shall use PVC, Styrene Acrylonitrile (SAN), or polyurethane core per the drawings. High strength connections in cored areas shall use core inserts of G10 or high density PVC, SAN, or polyurethane core. See “Core Material Selection Guidance for Navy Boatbuilders” for guidance on core materials.

Gel coat: Gel coats resins shall be fire retardant and compatible with the laminating resins.

078-5 Bedding Compound

Bedding compound shall be highly elastic, non-corrosive, paintable, solvent-free, with high adhesion properties and be suitable for the intended environment.

Polysulfide and polyurethane sealants may be used above and below the waterline. Where waterproof adhesive bonds are required, a polyurethane compound shall be used.

078-6 Structural Adhesive

Structural adhesive shall be ITW Polymers Plexus, or equal. Structural adhesive shall be used to bond the deck to the hull. 3M 5200, or equal, may be used for structural adhesive where matted surfaces are also fastened with a through bolted connection.

078-7 Non-Biodegradable Materials

The use of wood and other hygroscopic or biodegradable materials anywhere on the boat is prohibited, except where provided within OEM equipment and Government approved.

078-8 Corrosion Control

All parts and fittings required for disassembly of systems shall be of Monel, stainless steel type 316L (or 316 if not welded), or copper alloy containing no more than 10% zinc (except manganese bronze), whichever is compatible with the basic material of the equipment. Stainless steel type 316L shall be used where it is likely to be submerged in seawater.

Components using ferrous metals other than stainless steel shall not be used except where specifically required by this Specification or with prior Government approval. Where ferrous metals other than stainless steel are required by this Specification, they shall be hot-dip galvanized or coated (zinc plating and electro-galvanizing is not be considered an acceptable coating). The protective coating shall be applied after fabrication. Alternatively, ferrous metal items may be replaced with stainless steel items, or items of other non-corroding materials.

Mechanical components and subcomponents shall be suitable for a marine environment (corrosion resistant). Joined components shall be galvanically compatible with each other wherever possible, or shall be isolated to prevent galvanic corrosion. Components not available in a corrosion resistant material shall be protected or coated to reduce or eliminate corrosion (e.g. paint, corrosion inhibitor, etc.).

078-9 Dissimilar Metals

Where it is necessary to join dissimilar metals, faying surfaces of the galvanically dissimilar metals shall be electrically isolated, including fasteners, using non-water absorbent dielectric barrier(s) (e.g. gaskets, washers, sleeves, bushings, pipe or hose hangers, etc.), and hose of insulating material. For fasteners, TEF-GEL or equivalent may be used.

In order to exclude moisture from the joint, faying surfaces between mechanically fastened metal components, except machinery foundation shims, shall be protected by the use of bedding compound…