Att No. 1 SOW.doc

DOC document 97 KB Posted

Attached to
Engineering Technical Support Services
Solicitation number
N00173-26-RFI-EN02
Issued by

About this file

This is a Performance Work Statement (PWS) for engineering technical support services at the Naval Research Laboratory's Code 8124 Advanced Operations Section. The NRL Pomonkey Facility in La Plata, Maryland, operates specialized antenna systems including a 30-meter parabolic tracking antenna and multiple precision tracking antennas ranging from 1 to 18 meters in aperture. The contractor will provide comprehensive technical engineering services to support design, development, implementation, troubleshooting, and maintenance of research and development equipment at both the Pomonkey facility (CONUS) and an associated OCONUS location to ensure 24-hour continuous operational readiness.

The contractor's primary responsibilities include: special microwave feed and transmission line fabrication, assembly, and installation per JPL Deep Space Network specifications; design and fabrication of position controls, collimation mounts, and fixtures for antenna systems; modification and improvement of instrumentation facilities at both locations; and comprehensive maintenance support including bi-annual preventative maintenance for OCONUS systems and monthly maintenance for Pomonkey systems. Additional requirements include operating and staffing machine shops at both locations with precision metalworking capabilities and a two-hour emergency response time, maintaining fiber optic networks, IP-based telephone systems, power backup systems, radomes, CCTV systems, facility access systems, and SCIF compliance features. The contractor must maintain detailed logbooks, provide 24-hour critical failure response at Pomonkey, travel to the OCONUS facility a minimum of four times annually, and hold current OSHA certifications for forklift operation and working at heights. The contract is a Firm Fixed Price award with a base year from September 1, 2026, through August 31, 2027, and four optional one-year extension periods. Work is performed primarily at the Pomonkey Facility during normal business hours (0600-1700 Monday-Friday, excluding federal holidays), with monthly program management reviews required.

View the file

Other files

File Type Posted
Att No. 3 Personnel Qualifications.pdf PDF
Att No. 4 Distribution of Labor.pdf PDF
Att No. 2 CDRL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR No: 81-0602-26 RFQ No: N00173-26-Q-xxxx Attachment No: 01

Naval Research Laboratory

4555 Overlook Avenue SW Washington DC, 20375-5329

Performance Work Statement For

Design, Development, Implementation, and Maintenance of Equipment Advanced Operations Section, NRL Code 8124 9 January 2026

Mod. No.
Description of Changes
Requested By
Approved By
Date
None
Initial Version
Julie Thrift (COR)
Cedric Welch (TPOC)
9 January 2026

PERFORMANCE OF WORK STATEMENT (PWS)

1.0 BACKGROUND

The U.S. Naval Research Laboratory's (NRL) Code 8124, Advanced Operations Section, Pomonkey Research and Development (R&D) Facility is a unique field laboratory located 25 miles south of the NRL main facility. Specifically, six miles south of the intersection of Maryland Route 224 and Bumpy Oak Road, on Bumpy Oak Road in Charles County, near LaPlata Maryland. The site occupies approximately 134 acres and is owned by the NRL. Site assets include a full motion 30-meter parabolic antenna, the largest high-speed tracking antenna in the Continental United States (CONUS). This system is suitable for low Earth orbit as well as deep space mission requirements. Other precision tracking antennas are available, both full and limited motion, with apertures ranging from 1 to 18 Meters. As a result of special designs, the NRL Code 8124 Pomonkey facility can support operations over a wide band of frequencies ranging from 100 to beyond 31000 MHz. In addition to its primary location in La Plata MD, NRL Code 8124 also owns and operates several parabolic antenna systems at an Outside Continental United States (OCONUS) location. To confirm, there is one NRL Code 8124 facility located CONUS and one NRL Code 8124 facility located OCONUS.

The purpose of this Performance Work Statement (PWS) is to define the technical engineering services to support the requirements of the NRL Code 8124 at both its Pomonkey and OCONUS facilities. The requirements placed on both R&D locations to execute new tasking and to increase the signal acquisition capability necessitate the frequent addition or modification of special R&D equipment. The contractor shall provide technical engineering services to support the design, development, implementation, troubleshooting, and maintenance of the NRL Code 8124, Advance Operations Section, R&D equipment for operational readiness, as set forth in this PWS. The Space Systems Development Department is the space and ground support systems R&D organization of NRL’s Naval Center for Space Technology. The development responsibilities of NRL Code 8124 extend across the entire space/airborne/ground spectrum of hardware, software, and advanced technologies, including digital processing and control, analog systems, power, communications, payload command and telemetry, radio frequency, optical, payload, and electromechanical systems, as well as systems engineering.

2.0 REQUIREMENTS

The contractor will be responsible for execution of the requirements detailed in this Section. All requirements must be accomplished in a manner that meets all specifications, schedules, and budgetary controls provided to the contractor by NRL Code 8124 personnel via the Contracting Officer Representative (COR). The contractor shall furnish all hardware development support as well as necessary hardware modifications. The contractor shall provide support in the execution of hardware modifications. The contractor shall assess, improve, perform preventative maintenance tasks and procedures on the antenna systems and related support equipment at the Pomonkey and OCONUS facilities, as well as troubleshoot and correct any problems that arise with these systems and support equipment. The contractor shall recommend additional material, equipment, and improvements to the existing systems; which may be required to facilitate 24-hour continuous operations. Updates to any system shall be completely documented including any changes to current equipment inventory list.

The contractor shall provide technical engineering support for the operational requirements for projects which utilize NRL Code 8124 antenna assets. Antenna assets include, but are not limited to, 3-meter, 7.5-meter, 9-meter, and 30-meter Full Motion Large Aperture (FMLA) parabolic tracking antennas permanently located at the Pomonkey facility. Three transportable systems with antennas ranging in size from 1-meter to 3-meters and equipment vans associated with the transportable systems must be fully supported as well. In addition, multiple antenna systems controlled by NRL Code 8124 are located at the Section’s only OCONUS location, which includes both full and limited motion parabolic apertures that range from 3.8-meter to 18-meter. All of these systems must have, at a minimum, bi-annual preventative maintenance performed, which will include an operational capability test on each system. These requirements may at times include repair of special one-of-a-kind electronic systems designed by government scientists. The contractor shall perform the following tasks, outlined in Sections 2.1 through 2.4.

In order to meet the mission requirements, the contractor shall maintain a machine shop at both the Pomonkey and OCONUS facilities, with capabilities for precision metal working, to facilitate quick response for emergency repairs and modifications. The machine shop shall be equipped with the machinery necessary to address all aspects of tasking defined in this PWS. Machinery required includes, but is not limited to: (1) lathe, (2) milling machine, (3) drill press, (4) planar, (5) shaper, and (6) grinder. In addition, this capability must be available 24-hrs per day with a two-hour response time outside of normal working hours. At the OCONUS facility, the contractor must maintain an on-site machine shop equipped with the machinery necessary to address all aspects of tasking defined in this PWS. As well as, the contractor shall have access to all required machinery equipment, partner with a local machine shop and/or have machinery equipment shipped to the CONUS or OCONUS location within 30 days after contract award.

2.1 Special Microwave Feed and Transmission line Fabrication, Assembly and Installation, and other system related equipment

In order to meet the requirements of this section the contractor shall perform the following:

A.

Installation, modification, and maintenance of precision waveguide components, waveguide runs, and line elements according to Jet Propulsion Laboratory (JPL) Deep Space Network specifications and procedures.

B.

Assembly and installation of precision rigid and semi-rigid coaxial transmission line and connectors. The contractor shall follow formal industry standards practices and dimensional tolerances for the assembly of precision coaxial transmission line and components to include the following: 3.5mm, precision Type N, Amphenol Precision Connector (APC) 7, precision SOL semi-rigid, precision EIA and 7/16 Din connectors. These procedures must be approved by the COR.

C.

Installation and maintenance of dry air pressurization, and pressure distribution systems utilized in conjunction with waveguides and coaxial transmission lines.

D.

Measurement of the electrical characteristics of transmission lines.

The contractor shall test the existing cables periodically to ensure that characteristics such as Voltage Standing Wave Ratio (VSWR) and Insertion Loss continue to meet the established and documented specifications over the frequency range of 20 MHz to at least 31 GHz.

E.

Machine components and fabricate special prime focus feed systems and subsystems. Since this will involve custom hardware, the contractor shall be capable of and experienced in machining parts to a tolerance of 0.0005 inches, provide suitable materials, and provide personnel experienced in such installations.

F.

Installation and collimation of prime focus antenna feed assemblies, and radio frequency (RF) line elements at the focal point of all the antenna systems in order to obtain the highest efficiency and lowest possible system noise temperature. The contractor must be experienced with interpreting the results of Code 8124 celestial calibrations and the resulting installation and collimation requirements.

2.2 Fabrication, Modification, Installation and Testing of Position Controls and Fixtures

The contractor shall fabricate and install collimation mounts, and fixtures on several local permanently installed antennas and the transportable antenna systems as required. This capability must also extend to all systems located OCONUS. There may be an understandable delay in implementation of this equipment at remote locations due to logistics, but the contractor must be available to react within 24 hours to critical OCONUS requirements as required to meet the Site’s operational schedules. Since this will involve custom hardware, the contractor shall be capable of machining parts to close tolerance, providing suitable materials, and providing personnel experienced in such installations. Contractor personnel will be required to perform installations at both the La Plata and OCONUS facilities. In addition, the contractor shall design, fabricate, and install various types of control systems utilizing electromechanical devices, e.g., relays, stepping motors, linear actuators, and other similar devices in accordance with requirements set forth by the mission. Also, signal acquisition equipment designed by the NRL Code 8124 Scientists shall be fabricated and tested by the contractor for proper operation before final implementation.

The contractor shall perform the following at both the La Plata and OCONUS facilities:

A.

Design and fabricate indexing feed mount fixtures, which will enable feed horns to be accurately positioned in the X, Y, and Z-axis. Rotation and positioning of feed horns at the focal point shall be by electromechanical control techniques.

B. Fabricate and test prime focus microwave feed systems, designed by NRL engineers, for installation on any of the NRL Code 8124 antenna systems. Upon completion of the construction process the feed system shall be completely tested in an NRL Anechoic Chamber for proper operation and characteristics. The contractor will be required to correct any deficiencies noted during chamber testing.

C.

Install devices to control and/or indicate antenna travel limits, sector status, pedestal level, and other types of monitoring systems to improve antenna performance.

D.

Test, calibrate and troubleshoot electronic/electrical instrumentation and controls. Numerous one of kind pieces of equipment designed and fabricated by vendors such as Scientific Atlanta Inc., Vertex Communications Inc., GD SATCOM Technologies, CPI Antenna Systems, ViaSat, Telemetry & Communications Systems, Inc, and H.S. Allison Inc., require calibration and/or repair periodically.

E.

The linear and rotational position of feed systems shall be controlled by and/or reported to the operator(s). The contractor shall design and fabricate special components, install these components, and after installation, test all feed positioning systems for proper operation.

2.3 Modification and Improvement of the Permanent Antenna Systems, and Transportable Antenna Systems Instrumentation Facilities The contractor shall prepare a written outline of the proposed changes to the permanent systems and transportable system's instrumentation facilities that will be necessary to implement the addition or modification of equipment. After approval by the COR, the contractor shall proceed to implement the modifications.

The contractor shall perform the following tasks at both the La Plata, MD and OCONUS locations:

A.

Design, fabricate, and install brackets, mounting fixtures, etc.; made of approved materials with the concurrence of the COR, install electronic equipment to withstand maximum accelerations encountered in orbital tracking of low earth satellites and decelerations as a result of emergency stops.

B.

Design, fabricate, and install custom metal railing, metal decking, metal ladders, stable platforms, etc.; as required to provide access to the facility for equipment modifications by test personnel. The work must be performed on structures which may rise 135 feet above ground. The contractor shall provide and utilize Occupational Safety and Health (OSHA) approved safety equipment as required by government regulations. This includes lifting straps, chains, harnesses, and auxiliary safety equipment. In addition, much of this work requires the use of safety harnesses to support personnel, during equipment installation, as well as the ability to rig heavy equipment to be maneuvered to the final physical location manually.

C.

Install, maintain, and troubleshoot special control and signal cables to meet high-speed data communication requirements in support of the antenna systems' sensing and control systems. The type of cables to be installed will vary from shielded multi-conductor copper control cables, low loss microwave and RF Cable, and both single and multi-mode fiber-optic cables. Cables will be constructed and tested on site unless pre-terminated cables can be purchased that meet the required specifications.

D. Relocate, reconfigure, recalibrate and upgrade electronic data acquisition instrumentation to meet changing requirements in the operations facilities of the associated antenna systems. The contractor shall supply all cabling required unless otherwise specified by the COR. The contractor shall maintain drawings and cable lists that reflect the current status of the equipment. This documentation will be maintained at level of detail adequate for an individual unfamiliar with the system to be able to troubleshoot and plan reconfigurations on these complex working systems. The contractor shall document equipment performance and test results and submit this documentation to the COR.

2.4 Maintenance Support for NRL Code 8124 A. The contractor shall maintain a logbook of all routine, scheduled, and special (emergency, unexpected requirements, etc.) maintenance activities associated with the NRL Code 8124, both at its La Plata and OCONUS locations. These logbooks must be maintained in accordance with accepted standards and procedures set forth by the Pomonkey Facility. They will also be randomly reviewed for accuracy by the COR. Upon completion of the contract, the logbooks must be provided to the COR. A separate book is required for each of the following systems:

B.

La Plata, MD (Pomonkey facility) antenna systems: It shall be required that all preventative maintenance be performed on a timely basis (within plus or minus ten (10) days from the first of every month). This will include following the recommended schedule from the antenna manufacturer. There are monthly, quarterly, semi-annual, and annual schedules, which require lubrication, verifying gear box alignments, adjusting brakes, testing torque couplers, and calibration of the system. Waste oil management must be performed in accordance with NRLINST 6240.7B, NRL Oil/Used Oil Management and Title 40 Code of Federal Regulations (CFR) Part 112.7 and 40 CFR 112.8, Oil Pollution Prevention. Secondary to the general maintenance there is a requirement annually for pressure washing each system and painting as necessary. Painting shall be done in accordance with the antenna manufacturer specifications.

C.

OCONUS antenna systems: It shall be required that all preventative maintenance minimally be performed on a bi-annual basis. The scheduled maintenance for these systems may be condensed into two major activities each year. The monthly, quarterly, semi-annual, and annual schedule may be condensed into one complete PM event every six months. Waste oil management must be performed in accordance with NRLINST 6240.7B, NRL Oil/Used Oil Management and Title 40 Code of Federal Regulations (CFR) Part 112.7 and 40 CFR 112.8, Oil Pollution Prevention. Secondary to the general maintenance there is a requirement annually for pressure washing each system and painting as necessary. Painting shall be done in accordance with the antenna manufacturer specifications.

D. In order to maintain the safety of equipment and personnel the contractor shall provide devices to monitor the position and status of the antenna and its operating systems. For example, antenna travel limits, sector indicators, pedestal level, and other types of monitoring systems shall be designated by the COR and must be added by the contractor to improve the antenna system. The examples stated are critical to monitoring the operation of the antenna systems' movements and preventing catastrophic and life threatening situations during operations.

E.

Any subsystems designed by the contractor for the Pomonkey Facility must be completely documented and approved by the COR. This includes a complete operational description, assembly drawings, parts list, and schematic diagrams. The contractor shall submit this documentation to the COR for inclusion in Site technical documentation.

F.

The contractor shall perform tower maintenance on the 120-foot Ultra-High Frequency (UHF) tower at the Pomonkey facility using guidelines set forth in the Rohn Tower Systems Handbook. The tower maintenance shall include verifying guide wire tension and adjusting as necessary.

G. The contractor shall maintain, test, repair and upgrade the fiber optic network, as necessary, in accordance with industry standards regarding fiber optic procedures and the operational requirements of the NRL Code 8124 at both its CONUS and OCONUS facilities. As each facility continues to expand, this network will need to grow to meet the operational requirement of the sponsor. The installation of new fiber and associated equipment will become necessary to insure 24-hour continuous operation at the Pomonkey Facility.

H. The contractor shall maintain the Pomonkey Facility’s Internet Protocol (IP) based Avaya telephone system in accordance with Avaya specifications. The site telephone/intercom system must be maintained and tested periodically to verify 24-hour operation. This involves testing the mainframe and individual sets as well as fax lines. The contractor shall interface with Verizon for verification of the status of communications circuits utilized on site.

I.

The contractor shall design, implement, maintain, and troubleshoot numerous power back-up systems and generators manufactured by numerous vendors at both the Code 8124 Pomonkey and OCONUS facilities. These systems require periodic maintenance and testing to provide 24-hour operation.

J.

The contractor shall provide implementation, maintenance, and troubleshooting support for each of the antenna systems and control facilities associated with the Pomonkey and OCONUS facility, to insure operational readiness requirements are observed. Quick response capabilities from the contractor are a necessity in order to meet the level of effort requirements set forth by the sponsor for specific operations. Required response times will vary according to each specific requirement. Generally, critical failures at the Pomonkey facility must be addressed by the contractor within a 24-hour timeframe. The OCONUS facility failures will be addressed by the contractor at the earliest possible date that can be accommodated by flight arrangements.

K.

The contractor shall provide implementation, maintenance and troubleshooting support for various size radomes. These units range in size from 6 to 40 meters in diameter and include ventilation and dehumidification systems, aircraft warning lights, and lightning protection. Both solid and metal space frame designs are utilized. Required support specifically includes ventilation and dehumidification system maintenance and upgrades, both electrical and mechanical, as well as cleaning, painting, sealing, and replacement of the radome panels as required. Repair of damaged panels shall be done immediately. The contractor must also have experience with the integration of American Air Filter (AAF) Tri-Stage Filter units with radome pressurization systems as well as the implementation and maintenance of Desert Aire dehumidifiers within metal space frame radome systems.

L.

The contractor shall provide maintenance and support for the IP based Closed-Circuit Television (CCTV) system at the La Plata Facility. This includes troubleshooting and repair of the CCTV network as well as planning, executing, and thoroughly documenting system expansion and/or upgrades.

M.

The contractor shall provide maintenance and development support for the facility access system at the La Plata Facility. This includes upgrades, troubleshooting and repair of the entrance gate and associated phone line, card reader system, visitor call system, as well as maintenance and repair of all fences, fence lines, and gates that surround the Facility. Thorough documentation of these systems shall also be generated and maintained by the contractor.

N.

The contractor shall provide maintenance and support for special projects related to the physical and system accreditations for the Facility’s various Sensitive Compartmented Information Facility (SCIF). This includes the specification, fabrication, installation and modification of special systems or construction features required to meet current SCIF requirements. All work shall meet the requirements set forth in the applicable Department of Defense (DoD) and National Security Agency (NSA) published regulations.

O.

The contractor shall provide design, implementation, troubleshooting, and maintenance for various computer room air conditioning (CRAC) systems for the Facility’s various CRAC units located both CONUS AND OCONUS.

P.

In order to support its technical engineering support requirements at both the NRL Code 8124 CONUS and OCONUS locations, the contractor must have experience with forklift operation and also working from heights. Furthermore, the contractor must maintain current OSHA certifications for both forklift operation and working from heights.

3.0 PERIOD OF PERFORMANCE

The period of performance shall be for one (1) Base Year of 12 months and four (4) 12-month option years. The Period of Performance reads as follows:

Base Year

1 Sep 2026 – 31 Aug 2027 Option Year 1

1 Sep 2027 – 31 Aug 2028 Option Year 2

1 Sep 2028 – 31 Aug 2029 Option Year 3

1 Sep 2029 – 31 Aug 2030

Option Year 4

1 Sep 2030 – 31 Aug 2031

4.0 GENERAL INFORMATION

4.1 Quality Assurance:

The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

4.2 Recognized Holidays:

New Year’s Day

Labor Day

Martin Luther King Jr.’s Birthday

Columbus Day

President’s Day

Veteran’s Day

Memorial Day

Thanksgiving Day

Independence Day

Christmas Day Juneteenth Day

4.3 Hours of Operation:

The contractor is responsible for conducting business, between the hours of 0600 – 1700 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

4.4 Place of Performance:

The work to be performed under this contract will be performed primarily at the NRL Code 8124 Pomonkey facility, located in La Plata MD. Additionally, work will be performed at NRL Code 8124’s only OCONUS facility, at least four trips per year. There is only one OCONUS facility and the work required to support its maintenance, modification, and implementation of assets shall be executed at that facility.

4.5 Type of Contract

The Government will award a Firm Fixed Price Contract IAW FAR 16.202.

4.6 Physical Security:

The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

4.7 Contracting Officer Representative (COR)

The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

4.8 Periodic Progress Meetings

The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer (KO), COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government

4.8.1 Post-Award Kickoff Meeting

Within five (5) business days of contract award, the Government will conduct a post-award kickoff meeting through an alternative method of communication.

4.8.2 Intermittent Project Status Reviews

At the sole discretion of the Government, intermittent project status reviews may be conducted on an informal basis (by telephone or teleconference) as recommended by the COR. The Government anticipates no more than two (2) intermittent project status reviews per month.

4.8.3 Program Management Review

The Government will conduct monthly program management reviews at the NRL Pomonkey Facility to review the progress of the program, identify any risks, issues, or concerns, and provide feedback on the Contractor’s progress and performance. The Contractor shall provide written data and verbal presentations as to Gear Reducer requirement; any identified any risks, issues, or concerns.

4.8 Contractor Travel

The contractor will be required to travel CONUS and OCONUS during the performance of this contract to attend meetings, conferences, and training. The contractor may be required to travel to off-site training locations and to ship training aids to these locations in support of this PWS. Required language should travel be needed: Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR) and the limitation of funds specified in this contract. All travel requires Government approval/authorization and notification to the COR.

4.9 Special Instructions

The Contract Data Requirements List, DD1423, NOTE:

The Government will not provide and will not be responsible for any training required for satisfactory performance of contractor requirements under tasks 2.1 through 2.4. In addition, the contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under tasks 2.1 through 2.4 of this PWS.